FA9101-09-R-0015.pdf

PDF 1 MB Posted

Attached to
Molded Chopped Silica Federal contract opportunity
Solicitation number
FA9101-09-R-0015
Issued by
Department of the Air Force Materiel Command Test Center

About this file

FA9101-09-R-0015

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER

FA9101-09-R-0015

6. SOLICITATION ISSUE DATE

09 JUL 2009

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

DIANE M. RUSSELL

b. TELEPHONE NUMBER (No collect calls) (931)454-7844

8. OFFER DUE DATE/

LOCAL TIME

23 JUL 2009/2:00 PM

9. ISSUED BY AEDC PKE CODE FA9101 10. THIS ACQUISITION IS 11. DELIVERY FOR

FOB DESTINATION

UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

UNRESTRICTED

AEDC/PKE

100 KINDEL DRIVE, SUITE A-332

ARNOLD AFB, TN 37389-1332

DIANE M. RUSSELL (931)454-7844

diane.russell@arnold.af.mil

SET ASIDE: 100% FOR

SMALL BUSINESS

HUBZONE SMALL BUSINESS 13a. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700) EMERGING SMALL BUSINESS

8(A) 13b. RATING

SERVICE DISABLED VET SB DO-C9

NAICS: 325211 14. METHOD OF SOLICITATION

SIZE STANDARD: 750 RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

SEE SF1449 Continuation

17a. CONTRACTOR/

OFFEROR

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

OFFER BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See SF1449 Continuation (Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

See SF1449 Continuation 26 TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. OFFER DATED . YOUR OFFER ON

SOLICITATION (BLOCK 5) INCLUDING ANY ADDITIONS OR CHANGES

WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: SEE

CONTINUATION.

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

31c. DATE SIGNED

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED _________________________________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35.AMT VERIFIED 36. PAYMENT 37. CHECK NUMBER

CORRECT FOR

COMPLETE PARTIAL FINAL

PARTIAL FINAL

38. S/R ACCT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MMM/DD) 42d. TOTAL CONTAINERS

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 4/2002)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212 ConWrite Version 6.11.0 Created 09 Jul 2009 10:37 AM

SF1449 CONTINUATION

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

Sewage Pump

0001 10 __________ Each __________

Noun: MOLDED CHOPPED SILICA COVER

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

Cover, forward hub, Material - Molded Chopped Silica MX2600 or F554.

Fabricate in accordance with Drawing PK531748.28 Sht 6

Molded Chopped Silica Cover

0002 10 __________ Each __________

Noun: MOLDED CHOPPED SILICA COVER

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

Cover, Rear Hub, Material - Molded Chopped Silica MX2600 or F554. Fabricate in accordance with Drawing PK53178.28 Sht 6.

Molded Chopped Silica Cover

0003 10 __________ Each __________

Noun: MOLDED CHOPPED SILICA PLATE

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

Plate, Molded Chopped Silica, Material MX2600 or F554. Size: 7" x 14" x 3/4" thick each. Tolerance plus or minus 1/16" on the length and width, thickness no less than 3/4"

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

Molded Chopped Silica Plate

0004 1 __________ Each __________

Noun: MOLDED CHOPPED SILICA PLATE

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

Plate, Molded Chopped Silica, Material MX2600 or F554. Size: 10" x 10" x 3/4" thick each. Tolerance: plus or minus 1/16" on the length and width, thickness no less than 3/4".

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0001 10 FB2804 F1EEMA 60 DARO

Noun: MOLDED CHOPPED SILICA COVER

ACRN: AA

Descriptive Data:

All items shall be delivered to:

USAF Warehouse Receiving #1 1476 Avenue E Arnold AFB TN 37389-8000

REQ: 331257

AF Program Manager: Lt Marc Honrath

0002 10 FB2804 F1EEMA 60 DARO

Noun: MOLDED CHOPPED SILICA COVER

ACRN: AA

Descriptive Data:

All items shall be delivered to:

USAF Warehouse Receiving #1 1476 Avenue E Arnold AFB TN 37389-8000

REQ: 331259

AF Program Manager: Lt Marc Honrath

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0003 10 FB2804 F1EEMA 60 DARO

Noun: MOLDED CHOPPED SILICA PLATE

ACRN: AA

Descriptive Data:

All items shall be delivered to:

USAF Warehouse Receiving #1 1476 Avenue E Arnold AFB TN 37389-8000

REQ: 331260

AF Program Manager: Lt Marc Honrath

0004 1 FB2804 F1EEMA 60 DARO

Noun: MOLDED CHOPPED SILICA PLATE

ACRN: AA

Descriptive Data:

All items shall be delivered to:

USAF Warehouse Receiving #1 1476 Avenue E Arnold AFB TN 37389-8000

REQ: 331261

AF Program Manager: Lt Marc Honrath

Obligation ACRN Appropriation/Lmt Subhead/Supplemental Accounting Data Amount

AA

57 93600 299 4711 6606MR 7J2672 52100 65978F 503000 F03000

PR/MIPR: F1EEMA9097A002

JON: 00010482

ADDENDUM

1. FAR 52.212-04 ADDENDUM TO CONTRACT TERMS AND CONDITIONS--COMMERCIAL

ITEMS (Oct 2008)

52.212-4, Contract Terms and Conditions -- Commercial Items is hereby tailored as follows:

(a) The place of inspection, acceptance, and FOB is Arnold AFB, Tennessee .

(more tailoring of 52.212-4)

2. FAR 52.212-05 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (Apr 2009)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C.

7104(g)).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L.

108-77, 108-78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(8) (i) 52.219-6, Notice Of Total Small Business Set-Aside (Jun 2003) (15 U.S.C. 644).

(18) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2009) (15 U.S.C. 632(a)(2)).

(19) 52.222-03, Convict Labor (June 2003)(E.O. 11755).

(20) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Feb 2008) (E.O. 13126).

(21) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

(22) 52.222-26, Equal Opportunity (Mar 2007)(E.O. 11246).

(24) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793).

(34) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.o.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(39) 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration (Oct 2003) (31 U.S.C. 3332).

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (e)(1) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause--

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Dec 2008) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

(ii) 52.219-8, Utilization of Small Business Concerns (May 2004)(15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Section 1553 of Pub. L. 111-5). Applies to subcontracts funded under the Act.

(iv) 52.222-26, Equal Opportunity (Mar 2007)(E.O. 11246).

(v) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006)(38 U.S.C. 4212).

(vi) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998)(29 U.S.C. 793).

(vii) 52.222-39, Notification of Employee rights Concerning Payment of Union Dues or Fees (Dec 2004) (E.O. 13201).

(viii) 52.222-41, Service Contract Act of 1965, (Nov 2007), flow down required for all subcontracts subject to the Service Contract Act of 1965 (41 U.S.C. 351, et seq.)

(ix) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C.

7104(g)).

___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.)

(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Feb 2009) (41 U.S.C. 351, et seq.)

(xii) Reserved.

(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (Mar 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph

(e) of FAR clause 52.226-6.

(xiv) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

3. FAR 52.247-34 F.O.B. DESTINATION (Nov 1991)

(a) The term "f.o.b. destination," as used in this clause, means--

(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity.

If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight."

When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the Contractor uses rail carrier or freight forwarded for less than carload shipments, the Contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(b) The Contractor shall--

(1)(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

4. DFARS 252.211-7003 ITEM IDENTIFICATION AND VALUATION (Aug 2008)

(a) Definitions. As used in this clause-

“Automatic identification device” means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.

“Concatenated unique item identifier” means—

(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or

(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code;

enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.

“Data qualifier” means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html.

“DoD unique item identification” means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number.

For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.

“Enterprise” means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.

“Enterprise identifier” means a code that is uniquely assigned to an enterprise by an issuing agency.

“Government’s unit acquisition cost” means—

(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of delivery;

(2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractor’s estimated fully burdened unit cost to the Government at the time of delivery; and

(3) For items produced under a time-and-materials contract, the Contractor’s estimated fully burdened unit cost to the Government at the time of delivery.

“Issuing agency” means an organization responsible for assigning a non-repeatable identifier to an enterprise (i.e., Dun & Bradstreet’s Data Universal Numbering System (DUNS) Number, GSI Company Prefix, or Defense Logistics Information System (DLIS) Commercial and Government Entity (CAGE) Code.

“Issuing agency code” means a code that designates the registration (or controlling) authority for the enterprise identifier.

“Item” means a single hardware article or a single unit formed by a grouping of subassemblies, components, or constituent parts.

“Lot or batch number” means an identifying number assigned by the enterprise to a designated group of items, usually referred to as either a lot or a batch, all of which were manufactured under identical conditions.

“Machine-readable” means an automatic identification technology media, such as bar codes, contact memory buttons, radio frequency identification, or optical memory cards.

“Original part number” means a combination of numbers or letters assigned by the enterprise at item creation to a class of items with the same form, fit, function, and interface.

“Parent item” means the item assembly, intermediate component, or subassembly that has an embedded item with a unique item identifier or DoD recognized unique identification equivalent.

“Serial number within the enterprise identifier” means a combination of numbers, letters, or symbols assigned by the enterprise to an item that provides for the differentiation of that item from any other like and unlike item and is never used again within the enterprise.

“Serial number within the part, lot, or batch number” means a combination of numbers or letters assigned by the enterprise to an item that provides for the differentiation of that item from any other like item within a part, lot, or batch number assignment.

“Serialization within the enterprise identifier” means each item produced is assigned a serial number that is unique among all the tangible items produced by the enterprise and is never used again. The enterprise is responsible for ensuring unique serialization within the enterprise identifier.

“Serialization within the part, lot, or batch number” means each item of a particular part, lot, or batch number is assigned a unique serial number within that part, lot, or batch number assignment. The enterprise is responsible for ensuring unique serialization within the part, lot, or batch number within the enterprise identifier.

“Unique item identifier” means a set of data elements marked on items that is globally unique and unambiguous. The term includes a concatenated unique item identifier or a DoD recognized unique identification equivalent.

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html.

(b) The Contractor shall deliver all items under a contract line, subline, or exhibit line item.

(c) Unique item identifier..

(1) The Contractor shall provide a unique item identifier for the following:

(i) All delivered items for which the Government’s unit acquisition cost is $5,000 or more.

(ii) The following items for which the Government’s unit acquisition cost is less than $5,000:

Contract Line, Subline, or Exhibit Line Item Number Item Description N/A

(iii) Subassemblies, components, and parts embedded within delivered items as specified in Attachment Number N/A.

(2) The unique item identifier and the component data elements of the DoD unique item identification shall not change over the life of the item.

(3) Data syntax and semantics of unique item identifiers. The Contractor shall ensure that—

(i) The encoded data elements (except issuing agency code) of the unique item identifier are marked on the item using one of the following three types of data qualifiers, as determined by the Contractor:

(A) Application Identifiers (AIs) (Format Indicator 05 of ISO/IEC International Standard 15434), in accordance with ISO/IEC International Standard 15418, Information Technology – EAN/UCC Application Identifiers and Fact Data Identifiers and Maintenance and ANSI MH 10.8.2 Data Identifier and Application Identifier Standard.

(B) Data Identifiers (DIs) (Format Indicator 06 of ISO/IEC International Standard 15434), in accordance with ISO/IEC International Standard 15418, Information Technology – EAN/UCC Application Identifiers and Fact Data Identifiers and Maintenance and ANSI MH 10.8.2 Data Identifier and Application Identifier Standard.

(C) Text Element Identifiers (TEIs) (Format Indicator 12 of ISO/IEC International Standard 15434), in accordance with the Air Transport Association Common Support Data Dictionary; and

(ii) The encoded data elements of the unique item identifier conform to the transfer structure, syntax, and coding of messages and data formats specified for Format Indicators 05, 06, and 12 in ISO/IEC International Standard 15434, Information Technology – Transfer Syntax for High Capacity Automatic Data Capture Media.

(4) Unique item identifier.

(i) The Contractor shall—

(A) Determine whether to—

(1) Serialize within the enterprise identifier;

(2) Serialize within the part, lot, or batch number; or

(3) Use a DoD recognized unique identification equivalent; and

(B) Place the data elements of the unique item identifier (enterprise identifier; serial number; DoD recognized unique identification equivalent; and for serialization within the part, lot, or batch number only: original part, lot, or batch number) on items requiring marking by paragraph (c)(1) of this clause, based on the criteria provided in the version of MIL-STD-130, Identification Marking of U.S. Military Property, cited in the contract Schedule.

(ii) The issuing agency code—

(A) Shall not be placed on the item; and

(B) Shall be derived from the data qualifier for the enterprise identifier.

(d) For each item that requires unique item identification under paragraph (c)(1)(i) or (ii) of this clause, in addition to the information provided as part of the Material Inspection and Receiving Report specified elsewhere in this contract, the Contractor shall report at the time of delivery, either as part of, or associated with, the Material Inspection and Receiving Report, the following information:

(1) Unique item identifier.

(2) Unique item identifier type.

(3) Issuing agency code (if concatenated unique item identifier is used).

(4) Enterprise identifier (if concatenated unique item identifier is used).

(5) Original part number (if there is serialization within the original part number).

(6) Lot or batch number (if there is serialization within the lot or batch number).

(7) Current part number (optional and only if not the same as the original part number).

(8) Current part number effective date (optional and only if current part number is used).

(9) Serial number (if concatenated unique item identifier is used).

(10) Government’s unit acquisition cost.

(11) Unit of measure.

(e) For embedded subassemblies, components, and parts that require DoD unique item identification under paragraph (c)(1)(iii) of this clause, the Contractor shall report as part of, or associated with, the Material Inspection and Receiving Report specified elsewhere in this contract, the following information:

(1) Unique item identifier of the parent item under paragraph (c)(1) of this clause that contains the embedded subassembly, component, or part.

(2) Unique item identifier of the embedded subassembly, component, or part.

(3) Unique item identifier type.**

(4) Issuing agency code (if concatenated unique item identifier is used).**

(5) Enterprise identifier (if concatenated unique item identifier is used).**

(6) Original part number (if there is serialization within the original part number).**

(7) Lot or batch number (if there is serialization within the lot or batch number).**

(8) Current part number (optional and only if not the same as the original part number).**

(9) Current part number effective date (optional and only if current part number is used).**

(10) Serial number (if concatenated unique item identifier is used).**

(11) Description.

** Once per item.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause in accordance with the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.

(g) Subcontracts. If the Contractor acquires by subcontract, any item(s) for which unique item identification is required in accordance with paragraph (c)(1) of this clause, the Contractor shall include this clause, including this paragraph (g), in the applicable subcontract(s).

5. DFARS 252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO

IMPLEMENT STATUTES OR EXECUTIVE ORDERS APPLICABLE TO DEFENSE

ACQUISITIONS OF COMMERCIAL ITEMS (Jan 2009)

(a) The Contractor agrees to comply with the following Federal Acquisition Regulation (FAR) clause which, if checked, is included in this contract by reference to implement a provision of law applicable to acquisitions of commercial items or components.

(b) The Contractor agrees to comply with any clause that is checked on the following list of Defense FAR Supplement clauses which, if checked, is included in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items or components.

(13)(ii) 252.225-7036, Buy American Act--Free Trade Agreements--Balance of Payments Program (Jan 2009) - Alternate I (Oct 2006) (41 U.S.C. 10a-10d and 19 U.S.C.

3301 note).

(18) 252.232-7003, Electronic Submission Of Payment Requests and Receiving Reports (MAR 2008) (10 U.S.C. 2227).

(21)(i) 252.247-7023, Transportation of Supplies by Sea (May 2002) (10 U.S.C. 2631).

(21)(iv) 252.247-7023, Transportation of Supplies by Sea (May 2002) - Alternate III (May 2002) (10 U.S.C. 2631).

(c) In addition to the clauses listed in paragraph (e) of the Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items clause of this contract (FAR 52.212-5), the Contractor shall include the terms of the following clauses, if applicable, in subcontracts for commercial items or commercial components, awarded at any tier under this contract:

(1) 252.225-7014 Preference for Domestic Specialty Metals, Alternate I (Apr 2003) (10 U.S.C. 2533a).

(2) 252.237-7019 Training for Contractor Personnel Interacting with Detainees (Sep 2006) (Section 1092 of Pub. L. 108-375).

(3) 252.247-7023 Transportation of Supplies by Sea (May 2002) (10 U.S.C.

2631).

(4) 252.247-7024 Notification of Transportation of Supplies by Sea (Mar 2000) (10 U.S.C. 2631).

6. DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (Dec 2006)

(a) 26 U.S.C. 6331(h) authorizes the Internal Revenue Service (IRS) to continuously levy up to 100 percent of contract payments, up to the amount of tax debt.

(b) When a levy is imposed on a payment under this contract and the Contractor believes that the levy may result in an inability to perform the contract, the Contractor shall promptly notify the Procuring Contracting Officer in writing, with a copy to the Administrative Contracting Officer, and shall provide—

(1) The total dollar amount of the levy;

(2) A statement that the Contractor believes that the levy may result in an inability to perform the contract, including rationale and adequate supporting documentation; and

(3) Advice as to whether the inability to perform may adversely affect national security, including rationale and adequate supporting documentation.

(c) DoD shall promptly review the Contractor’s assessment, and the Procuring Contracting Officer shall provide a written notification to the Contractor including–

(1) A statement as to whether DoD agrees that the levy may result in an inability to perform the contract, and

(2)(i) If the levy may result in an inability to perform the contract and a lack of performance will adversely affect national security, the total amount of the monies collected that should be returned to the Contractor; or

(ii) If the levy may result in an inability to perform the contract but will not impact national security, a recommendation that the Contractor promptly notify the IRS to attempt to resolve the tax situation.

(d) Any DoD determination under this clause is not subject to appeal under the Contract Disputes Act.

7. AF 5352.201-9101 OMBUDSMAN (Aug 2005)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen, Mr. Michael Covington, 100 Kindel Drive, Suite A327, Arnold AFB TN 37389-1327, Telephone 931-454-5613, Facsimile 931-454-6415, michael.covington@arnold.af.mil. Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number

(703) 588-7004, facsimile number (703) 588-1067.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

CONTRACT DOCUMENTS, EXHIBITS AND ATTACHMENTS

DOCUMENT PGS DATE TITLE

ATTACHMENT 1 6 DRAWING

ATTACHMENT 2 3 ADDENDA TO 52.212-01 INSTRUCTIONS

TO OFFERORS - COMMERCIAL ITEMS

ATTACHMENT 3 3 ADDENDUM TO FAR 52.212-02

EVALUATION - COMMERCIAL ITEMS

Attachment 2

ADDENDA to 52.212.01 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS

(APR 2008)

GENERAL INSTRUCTIONS

a. Instructions to Offerors (ITO):

This section of the ITO provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated in Contract Line Items (CLINs) 0001 through 0004 and drawings (Attachment 1). Non-conformance with the instructions provided in the ITO may result in an unfavorable proposal evaluation.

b. Include Sufficient Detail:

The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the offeror’s proposal.

c. Embellishments Not Desired:

Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.

d. Proposal Acceptance and Validity Dates:

The proposal acceptance period is specified in block 8 of the Standard Form (SF) 1449.

e. Disposition of Proposals:

In accordance with FAR 4.803(a)(10), the Government will retain one copy of all unsuccessful proposals. Unless the offer requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.

GENERAL INFORMATION

a. Point of Contact:

Ms. Diane Russell, Contracting Officer, is the point of contact for this acquisition. Address any questions or concerns you may have to her. Written requests for clarification may be sent to Ms.

Russell at diane.russell@arnold.af.mil or to the address located in Block 9 of the SF 1449.

b. Debriefings:

The Contracting Officer will promptly notify offerors of any decision to exclude them from the competition in accordance with FAR 15.503. Whereupon they may request and receive a debriefing. Offerors desiring debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

mailto:diane.russell@arnold.af.mil

c. Discrepancies:

If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.

FACTOR 1 – TECHNICAL PROPOSAL

Technical proposals are not required. Technical acceptability will be determined based on the offerors compliance with the requirement as stated in CLINs 0001 through CLIN 0004 and drawings (Attachment 1).

FACTOR 2 – PRICE PROPOSAL

Completion of pricing information on page 2 of the SF 1449 for CLIN 0001 through CLIN 0004 will represent the price proposal.

CONTRACT DOCUMENTATION

a. Model Contract/Representations and Certifications:

The purpose of this section is to provide information to the Government for preparing the contract document and supporting file. The offeror’s proposal shall include a signed copy of the model contract (SF 1449).

Solicitation/Contract Form: Complete blocks 17a and 30a, b, and c of the SF 1449. Signature by the offeror on the SF 1449 constitutes an offer, which the Government may accept. The “original” copy should be clearly marked under separate cover and should be provided without any punched holes.

Supplies or Services and Costs/Prices: All pricing information shall be addressed on page two of the SF 1449. Information shall be limited to Contract Line Item Number (CLIN) level pricing, including unit and extended pricing.

Deliveries or Performance: The required time of delivery is 60 days after receipt of order. The time of delivery is addressed on page two of the SF 1449. Proposals will be evaluated with respect to this time of delivery.

Representations, Certifications, and Other Statements of Offerors: Complete representations, certifications, acknowledgements and statements in FAR 52.212-3 Offeror Representations and Certifications – Commercial Items.

b. Exceptions to Terms and Conditions:

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation.

Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.

c. Other Information Required:

Authorized Offeror Personnel: Provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.

Company/Division Address, Identifying Code, and Applicable Designations: Provide company/division’s street address, CAGE code, and DUNS code.

Attachment 3

ADDENDUM TO FAR 52.212-02 EVALUATION – COMMERCIAL ITEMS (JAN 1999)

GENERAL INFORMATION

a. Basis for Contract Award:

This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2, as supplemented. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the lowest evaluated cost or price, which is deemed responsible in accordance with the Federal Acquisition Regulation and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by this solicitation. The Government reserves the right to award without discussions; therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.

b. Number of Contracts to be Awarded:

The Government intends to select one contractor for the Molded Chopped Silica Items.

However, the Government reserves the right to award no contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.

c. Rejection of Unrealistic Offers:

The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost/price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

d. Correction Potential of Proposals:

The Government will consider, throughout the evaluation, the “correction potential” of any proposal uncertainty. The judgment of such “correction potential” is within the sole discretion of the Government. If an aspect of an offeror’s proposal not meeting the Government’s requirements is not considered correctable, the offeror may be eliminated from the competitive range.

EVALUATION FACTORS

a. List Factors and Subfactors:

The Government will evaluate for the lowest price technically acceptable in accordance with the terms and conditions of the solicitation.

b. Evaluation Methodology:

Technical acceptability will be evaluated on all offers. Only those offerors determined to be technically acceptable, either initially or as a result of discussions, will be considered for award.

Then, price will be evaluated and the proposals will be listed from lowest to highest price based on the total evaluated price.

Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for the non-cost factors.

c. Technical Factor:

By submission of its offer, the offeror accedes to all solicitation technical requirements and will be determined technically acceptable. Failure to meet a requirement may result in an offer being determined technically unacceptable.

d. Cost/Price Factor:

Cost/Price Evaluation: The offeror’s cost/price proposal will be evaluated for award purposes by adding the total price for basic requirements.

Total Evaluated Price: Price analysis will be performed to determine the reasonableness of the offeror’s price proposal. Reasonableness will be based on the total evaluated price. The total evaluated price will be calculated as the sum of the Contract Line Item Numbers (CLINs) unit/extended prices.

Unrealistically Low Costs or Prices: Unrealistically low proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirement or the offeror has made an unrealistic proposal.

Unbalanced Pricing: Offerors are cautioned against submitting an offer that contains unbalanced pricing. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The Government shall analyze offers to determine whether they are unbalanced with respect to separately priced line items or subline items. Offers that are determined to be unbalanced may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.

e. Discussions:

It is the Government’s intent to award without discussions; therefore, it is imperative that offerors submit their best terms initially. However, if during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs), and the Final Proposal Revisions (FPRs) will be considered in making the source selection decision.

PRE-AWARD SURVEY

The Government may conduct a pre-award survey (PAS) as part of this source selection. Results of the PAS (if conducted) will be evaluated to determine each offeror’s capability to meet the requirements of the solicitation.

PLANT VISITS

In the event discussions are necessary, plant visits may be conducted during the evaluation phase to develop knowledge for judging the potential for correction of deficiencies.

SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

SOLICITATION PROVISIONS

SOLICITATION PROVISIONS FA9101-09-R-0015

PAGE -1 of 35

1. FAR 52.212-01 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (Apr 2008)

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 100 employees.

(b) Submission of offers. (See Attachment 2) Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show --

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of offers;

(3) The name, address, and telephone number of the offeror;

(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) "Remit to" address, if different than mailing address;

PAGE -2 of 35

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(l) for those representations and certifications that the offeror shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation.

Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.

(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.

(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.

(f) Late submissions, modifications, revisions, and withdrawals of offers.

(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.

PAGE -3 of 35

(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-

(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or

(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(C) If this solicitation is a request for proposals, it was the only proposal received.

(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(5) Offers…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .