Attachment 2 Proj Exp Outline - 110124.docx

DOCX document 26 KB Posted

Attached to
SATOC for Title I and Title II Architect-Engineer Services for the Renovation of Hangar 225 at Hill Air Force Base, UT
Solicitation number
FA8903-AE-SATOC-HILL-AFB-HANGAR-225
Issued by

About this file

This document is a sources sought notification for architect-engineer (A/E) title I (design) and title II (construction management) services for the renovation of Aircraft Hangar 225 at Hill Air Force Base in Utah.

The Air Force is seeking small business firms with experience providing multidiscipline renovation design services for aircraft hangars and office spaces at DoD installations, particularly with expertise in seismic retrofits, historic preservation, hazardous materials abatement, and phased construction in occupied facilities. Respondents should highlight their in-house and teaming capabilities across disciplines such as architecture, structural, electrical, mechanical, and civil engineering. The Government is looking for projects valued over $100M where firms provided both design and full-time on-site title II construction oversight. Responses are due by November 15th and should be submitted to the specified contracting personnel. The anticipated contract will be a single-award IDIQ with a 5-year base period and potential 2-5 year option period, with an estimated $25-35M ceiling.

View the file

Other files

File Type Posted
SS Attachment 1 - AE-Hangar-Design-Hill-Questionnaire.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hangar/Multi-Floor Office Space/Historical Renovation Design Experience

· Your firm’s name: ________________* Were you the Prime or a Teaming Partner? ____________

· Project Title: _____________________________________________________________________

· DoD Installation of resultant construction: ________________________________________

· Total Design/Title II Fee: ________________* Resultant Construction Cost: _______________

· Design Fee for Services Performed in-house by your firm: _______________________

· Design Fee for Services Performed by teaming partners: _________________________

· Type: (Conceptual Design for a D-B Pkg or 100% Issued for Construction DBB Pkg or TII): _________________________________________________________________________________

· Date Design/TII completed: __________________ Date Construction completed: ____________

· Narrative Description of the Project: (Note the following):

· Generally describe the entire project

· Briefly describe the project’s general scope.

· Describe the type of design services performed in-house by your firm (Electrical, Mechanical, etc):

· Describe the type of Services Performed by teaming partners/subs (Fire Protection, Architecture, etc):

· Highlight any experience described in the synopsis.

· Generally describe whether the team members that executed this Design Renovation project are still employed by your firm (and/or teaming partners).

· Please do not provide designs for construction of new facilities.

File details come from the government source that posted it. Updated .