LSMA RFP DRAFT No. 3 SOLICITATION SECTION L APPENDIX D
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Category Requirements
| IV&V Support* | Education Requirements | Experience Requirements | Additional Requirements (Certifications, etc.) |
| Labor Category 1 | |||
| Labor Category 2 | |||
| Labor Category 3 | |||
| Labor Category 4 | |||
| Labor Category 5 | |||
| Labor Category 6 | |||
| Labor Category 7 | |||
| Labor Category 8 | |||
| Labor Category 9 | |||
| Labor Category 10 | |||
| Labor Category 11 | |||
| Labor Category 12 | |||
| Labor Category 13 | |||
| Labor Category 14 | |||
| Labor Category 15 | |||
| * Additional Labor Categories under the IV&V Support are to be added as needed. |
LSMA Appendix D &A Page &P of &N
Labor Rate Burdening
| IV&V Support* | |||||||||||
| OFY1 | OFY2 | OFY3 | OFY4 | OFY5 | OFY6 | OFY7 | OFY8 | ||||
| Category | Direct Labor Rate | CPIF | |||||||||
| O/H Rate | CPIF | ||||||||||
| G&A Rate | Direct Labor Rate | CPIF | |||||||||
| O/H Rate | CPIF | ||||||||||
| G&A Rate | Direct Labor Rate | CPIF | |||||||||
| O/H Rate | CPIF | ||||||||||
| G&A Rate | Direct Labor Rate | CPIF | |||||||||
| O/H Rate | CPIF | ||||||||||
| G&A Rate | Direct Labor Rate | CPIF | |||||||||
| O/H Rate | CPIF | ||||||||||
| G&A Rate | Direct Labor Rate | CPIF | |||||||||
| O/H Rate | CPIF | ||||||||||
| G&A Rate | Direct Labor Rate | CPIF | |||||||||
| O/H Rate | CPIF | ||||||||||
| G&A Rate | Direct Labor Rate | CPIF | |||||||||
| O/H Rate | CPIF |
G&A Rate
| Labor Category 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 13 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 14 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| XBM Sustainment/IV&V Support* | |||||||||||
| OFY1 | OFY2 | OFY3 | OFY4 | OFY5 | OFY6 | OFY7 | OFY8 | ||||
| Category | Direct Labor Rate | FPIF | |||||||||
| O/H Rate | FPIF | ||||||||||
| G&A Rate | Direct Labor Rate | FPIF | |||||||||
| O/H Rate | FPIF | ||||||||||
| G&A Rate | Direct Labor Rate | FPIF | |||||||||
| O/H Rate | FPIF | ||||||||||
| G&A Rate | Direct Labor Rate | FPIF | |||||||||
| O/H Rate | FPIF | ||||||||||
| G&A Rate | Direct Labor Rate | FPIF | |||||||||
| O/H Rate | FPIF | ||||||||||
| G&A Rate | Direct Labor Rate | FPIF | |||||||||
| O/H Rate | FPIF | ||||||||||
| G&A Rate | Direct Labor Rate | FPIF | |||||||||
| O/H Rate | FPIF | ||||||||||
| G&A Rate | Direct Labor Rate | FPIF | |||||||||
| O/H Rate | FPIF |
G&A Rate
| Labor Category 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 13 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 14 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Fully Burdened Labor Rates
| Technical Services | OFY1 | OFY2 | OFY3 | OFY4 | OFY5 | OFY6 | OFY7 | OFY8 |
| Category | CPIF Rate | CPIF Rate | CPIF Rate | CPIF Rate | CPIF Rate | CPIF Rate | CPIF Rate | CPIF Rate |
| IV&V Support* | ||||||||
| Labor Category 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 13 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 14 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Services | OFY1 | OFY2 | OFY3 | OFY4 | OFY5 | OFY6 | OFY7 | OFY8 |
| Category | FPIF Rate | FPIF Rate | FPIF Rate | FPIF Rate | FPIF Rate | FPIF Rate | FPIF Rate | FPIF Rate |
| XBM Sustainment/IV&V Support* | ||||||||
| Labor Category 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 13 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 14 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Category 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| * Additional Labor Categories are to be added as needed. |
| Technical Services | OFY1 | OFY2 | OFY3 | OFY4 | OFY5 | OFY6 | OFY7 | OFY8 |
| FFP Rate | FFP Rate | FFP Rate | FFP Rate | FFP Rate | FFP Rate | FFP Rate | FFP Rate | |
| Special Studies Wrap Rate | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
LSMA Appendix D &A Page &P of &N
XBM Sustainment Prices
| Pricing for XBM Sustainment | ||||||||||||||||||||||||
| Base Year | ||||||||||||||||||||||||
| OFY 1 | OFY 2 | |||||||||||||||||||||||
| Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Travel | Target Cost | Target Fee | NMGRT (if applicable) | Target Price | Ceiling Price | |||
| Level 0 | 0 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 50,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 1 | 1 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 52,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 2 | 2 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 54,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 3 | 3 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 56,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 4 | 4 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 58,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 5 | 5 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 60,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 6 | 6 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 62,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 7 | 7 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 64,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Option Year 1 | ||||||||||||||||||||||||
| OFY 2 | OFY 3 | |||||||||||||||||||||||
| Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Travel | Target Cost | Target Fee | NMGRT (if applicable) | Target Price | Ceiling Price | |||
| Level 0 | 0 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 50,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 1 | 1 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 52,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 2 | 2 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 54,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 3 | 3 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 56,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 4 | 4 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 58,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 5 | 5 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 60,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 6 | 6 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 62,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 7 | 7 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 64,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Option Year 2 | ||||||||||||||||||||||||
| OFY 3 | OFY 4 | |||||||||||||||||||||||
| Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Travel | Target Cost | Target Fee | NMGRT (if applicable) | Target Price | Ceiling Price | |||
| Level 0 | 0 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 50,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 1 | 1 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 52,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 2 | 2 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 54,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 3 | 3 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 56,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 4 | 4 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 58,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 5 | 5 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 60,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 6 | 6 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 62,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 7 | 7 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 64,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Option Year 3 | ||||||||||||||||||||||||
| OFY 4 | OFY 5 | |||||||||||||||||||||||
| Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Travel | Target Cost | Target Fee | NMGRT (if applicable) | Target Price | Ceiling Price | |||
| Level 0 | 0 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 50,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 1 | 1 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 52,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 2 | 2 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 54,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 3 | 3 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 56,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 4 | 4 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 58,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 5 | 5 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 60,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 6 | 6 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 62,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 7 | 7 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 64,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Option Year 4 | ||||||||||||||||||||||||
| OFY 5 | OFY 6 | |||||||||||||||||||||||
| Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Travel | Target Cost | Target Fee | NMGRT (if applicable) | Target Price | Ceiling Price | |||
| Level 0 | 0 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 50,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 1 | 1 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 52,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 2 | 2 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 54,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 3 | 3 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 56,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 4 | 4 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 58,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 5 | 5 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 60,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 6 | 6 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 62,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Level 7 | 7 static fire tests/yr | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 64,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Pricing for Transition Option | OFY 6 | Note: Darker highlight (orange) indicates the Levels that will be evaluated for TEP for each contracted year. | Total Sustainment Price | $0 | |
| Transition Option | FFP | $ - 0 |
&14LSMA Appendix D &14&A &14Page &P of &N
New Launch Sys IV&V Prices
| Line | CLIN | Pricing for CLIN 1xxx - New Launch System IV&V Labor | OFY 1 | OFY 2 | OFY 3 | OFY 4 | |||||||||||||||||||||||||||||||||||
| Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Travel | Target Cost | Target Fee | NMGRT (if applicable) | Total Target Price | |||||
| 1 | TBD | Sample Mission 2.1 | PAP MCS Launch System IV&V | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 150,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | TBD | Sample Mission 2.2 | Minotaur 6 Launch System IV&V | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 100,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | TBD | Sample Mission 2.3 | MRBM-T1/T2 Launch System IV&V | CPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 20,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total New Launch System IV&V Price | $0 |
LSMA Appendix D &A Page &P of &N
Existing Launch Sys IV&V Prices
| Line | CLIN | Pricing for CLIN 1xxx - New Launch System IV&V Labor | OFY 1 | OFY 2 | OFY 3 | OFY 4 | OFY 5 | OFY 6 | |||||||||||||||||||||||||||||||||||||||||
| Line | Pricing for CLIN 2xxx - Existing Launch System IV&V Labor | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | Subcontract O/H | Other ODCs | G&A | Total Burdened Labor | Subcontracts | IOTS | Consultants | Total Subcontracts | |||
| 1 | TBD | Sample Mission 3.1 | NASA Suborbital Launch System IV&V | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | TBD | Sample Mission 3.2 | ORS-2 Launch System IV&V | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | TBD | Sample Mission 3.3 | AFSPC-X Launch System IV&V | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | TBD | Sample Mission 3.4 | STP-3 Launch System IV&V | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | TBD | Sample Mission 3.5 | Navsat Launch System IV&V | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | TBD | Sample Mission 3.6 | Navsat2 Launch System IV&V | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | TBD | Sample Mission 3.7 | eMRBM Launch System IV&V | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 | TBD | Sample Mission 3.8 | MRBM-T3 Launch System IV&V | FPIF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
LSMA Appendix D &A Page &P of &N
Special Study Prices
| Line | CLIN | Pricing for CLIN 3xxx - Special Studies Labor | Proposed | ||
| 1 | TBD | Special Study 4.1 | PAP MCS Systems Engineering | FFP | $ - 0 |
| 2 | TBD | Special Study 4.2 | CSM Basing | FFP | $ - 0 |
Special Studies Price $ - 0
LSMA Appendix D &A Page &P of &N
Total Evaluated Price
| Line | Dollars | |
| 1 | XBM Sustainment Price | $0.00 |
| 2 | Transition Option Price | $0.00 |
| 3 | New Launch System IV&V Price | $0.00 |
| 4 | Existing Launch System IV&V Price | $0.00 |
| 5 | Special Studies Price | $0.00 |
| Total Evaluated Price | $0.00 |