6.b-L102_Appendix_B__-_SSRD_4.1_v5.docx

DOCX document 45 KB Posted

Attached to
Launch Services Mission Assurance (LSMA) Federal contract opportunity
Solicitation number
FA8818-13-R-0021
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

FA8818-13-R-0021 L102 Appendix B- Special Study Requirements Document 4.1

View the file

Other files for this federal contract opportunity

Other files attached to Launch Services Mission Assurance (LSMA), newest first.
File Type Posted
LSMA_CvrLtr_FBOPost_Industry_Q A'sUpdated_Answers.pdf PDF
LSMA_Industry_Q A'sUpdated_Answers.pdf PDF
The_LSMA_BidderVersion_4.0RELEASE.pdf PDF
LSMA_Industry_QA_4_v2Final27Aug13.pdf PDF
RSLP_WBS.pdf PDF
FBO_Post_Updated_Estimated_RFP_Release_11Jul13.pdf PDF
OCI _SMC_OCI_Mitigation_Plan_Checklist_(May_07).doc DOC document
OCI _SMC_OCI_Mitigation_Plan_Checklist_(May_07).doc DOC document
LSMA_Industry_QA_3_v1_13Jun13.pdf PDF
LSMA_Draft_RFP_No.3_Ltr_to_Offerors.pdf PDF
FA88180-13-R-0021_DRAFT_NO.3_31MAY13.pdf PDF
7-_M101_M102_Rev_0_-_31_May_13.pdf PDF
6.d-L102_Appendix_D_--_Pricing_Tables_Rev_0_31_May_13.xlsx XLSX spreadsheet
Bidders_LibraryVersion_2__RELEASE_20_May13.pdf PDF
LSMA_Industry_Q A_No.2_FBO_Post_20May13.pdf PDF
LSMA_D_RFP_No_2_25Apr13_Ltr_to_Offerors.pdf PDF
22_7-_M101_M102_Rev_9_-_22_Apr_13.pdf PDF
FA8818-13-R-0021_Draft_Version2_25_Apr13_Post.pdf PDF
23_6.d-L102_Appendix_D_--_Pricing_Tables_v7_22_Apr_13.xlsx XLSX spreadsheet
L101_Rev9_-_22_Apr_13.pdf PDF
LSMA_Industry_QA_v7_PKTN_FBO_Post_25Apr13.pdf PDF
Bidders_Library_Vol_I_24Apr13.pdf PDF
Industry_Day_Master_Presentation_v6_15_Apr_13_as-briefed_rr.pdf PDF
FBO_Post_List_of_Industry_Day_Attendance.pdf PDF
LSMA_2013_Industry_DayFBO_Notice.pdf PDF
Building_201_Location.ppt PPT presentation
Reschedule_Industry_Day_and_Bidders_LibraryRequirement_for_Industry.doc DOC document
7-_M101_M102_Rev_9_-_26_Mar_13.doc DOC document
6.0_L102_-_Rev_9_26Mar13PKTS.doc DOC document
L_Appendix_C_3--_PPQ_Cover_LetterRev.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-3.7_v5_4_Feb_2013.docx DOCX document
DRAFT_RFP_FA8818-13-R-0021_26MAR13.pdf PDF
6.a-L102_Appendix_A__-_MID_SM-3.2_v5_4_Feb_2013.docx DOCX document
6.e-L102_Appendix_E__-_TASC_MA_Bridge_PWS_Transition_Excerpt.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.3_v5_4_Feb_2013.docx DOCX document
L_Appendix_C_4--_Past_Performance_Questionnaire.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-2.4_v5_4_Feb_2013.docx DOCX document
LSMA_dRFP__Ltr_to_Offerors_26Mar13.pdf PDF
6.a-L102_Appendix_A__-_MID_SM-2.1_v5_4_Feb_2013.docx DOCX document
6.b-L102_Appendix_B__-_SSRD_4.2_v5_4_Feb_2013.docx DOCX document
L_Appendix_C_2--_Consent_Letter.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-2.3_v5_4_Feb_2013.docx DOCX document
7-_M101_M102_Rev_9_-_26_Mar_13.doc DOC document
L_Appendix_C_1_--_Client_Authorization_Letter.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-3.6_v5_4_Feb_2013.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.8_v5_4_Feb_2013.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.4_v5_4_Feb_2013.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.5_v5_4_Feb_2013.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.1_v5_1_Feb_2013.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-2.2_v5_4_Feb_2013.docx DOCX document
Show all 50

Launch Services Mission Assurance (LSMA) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED// SM-3.1

UNCLASSIFIED

Sample Special Study 4.1

PAP MCS Demo Systems Engineering Special Study Requirements Document (SSRD)

FA8818-13-R-TBD

Rev 0: TBD Draft v5 1 Feb 2013

REVISION HISTORY

REVISION
DATE
SECTION AFFECTED
COMMENTS
0
TBD
N/A
N/A
1.0INTRODUCTION4
1.1OVERVIEW4
1.2SCOPE4
2.0SPECIAL STUDY OBJECTIVES4
3.0ROLES AND RESPONSIBILITIES5
3.1Customer:5
3.2Associated Contractors (ASCONs):5
3.3SMC/SDL:5
3.4Mission Assurance Contractor (MAC):5
3.5Special Study Contractor (SSC):5
3.6Launch System Contractor (LSC):5
3.7Agreements6
4.0SPECIAL STUDY MILESTONE SCHEDULE6
5.0ACRONYM LIST7
6.0REFERENCES9

INTRODUCTION

OVERVIEW

This Special Study Requirements Document (SSRD) provides the special study requirements for the systems engineering study supporting the Air Force Nuclear Warfare Center (AFNWC) Intercontinenetal Ballistic Missile (ICBM) Demonstration/Validation (DemVal) Program development of the Propulsion Applications Program (PAP) Medium Class System (MCS) demonstration. The US Air Force, Space and Missile Systems Center (SMC) Rocket Systems Launch Program (RSLP) office, Space Development and Test Directorate (SD)/Launch Systems Division (SDL), will provide the Launch Vehicle (LV) and launch services for the PAP MCS Demo mission through the SRP-3 contract. AFNWC will be responsible for coordination of the motor development activities. This special study will develop requirements documents and interface requirements for the LV and motor contract activities through execution of topical working groups to address specific areas of concern.

SCOPE

The purpose of this document is to serve as the controlling source and authority for the PAP MCS Demo SE special study requirements by identifying the objectives of the study, and to provide schedule and other program and mission information required in order to propose and execute the special study activities. This SSRD will:

a. Identify the overall demonstration mission objectives.

b. Identify roles and responsibilities and interfaces of which the special study contractor (SSC) should be aware among the various contractors and Government agencies supporting the demonstration.

c. Identify the baseline demonstration schedule milestones.

In the case of conflict between this document and any document referenced herein, this document shall take precedence.

SPECIAL STUDY OBJECTIVES

The primary goal of the PAP MCS Demonstration is to demonstrate three new ballistic missile motors in an integrated launch vehicle to raise the Technology Readiness Level (TRL) of the advanced solid rocket technologies embodied by the motors, and ensure that the motors function correctly in an operational environment.

To support this overall goal, the following objectives are established for this special study:

a. Develop an overarching systems engineering framework to guide motor development, launch system development, system integration, mission planning, and test activities.

b. Identify, charter, and co-chair specific Working Groups to address Integrated Product Team (IPT) risk areas of concern.

c. Provide Subject Matter Expert (SME) support to the IPT in the areas of propulsion system development and test, ballistic weapon system guidance and navigation design and integration, solid rocket system safety, launch vehicle range safety, system development risk management, and mission planning.

ROLES AND RESPONSIBILITIES

The roles and responsibilities among agencies and contractors that will support the PAP MCS Demo are described below.

Customer:

The demonstration motors and funding for the Demo launch system contract are being provided to RSLP by the AFNWC.

Associated Contractors (ASCONs):

The AFNWC is responsible for contracting with the motor manufacturers to provide test and flight motors for the Demo mission.

SMC/SDL:

SMC/SDL, located at Kirtland AFB, NM, is responsible for integrated launch system development and launch including range support.

Mission Assurance Contractor (MAC):

The MAC provides MA and Independent Verification and Validation support to the demo mission.

Special Study Contractor (SSC):

The SSC provides SE support to the demo mission in accordance with this SSRD.

Launch System Contractor (LSC):

SMC/SDL will contract with the LSC to provide the LV design, integration, and interface to the motors, vehicle mating, mission planning and launch of the LV.

Agreements The SSC shall ensure that Associate Contractor Agreements are completed for the following associate contractors:

· MAC

· LSC

· Tecolote Research, Inc

· Aero Thermo Technology, Inc

· ASCONs

If necessary, the SSC shall also ensure that Non-Disclosure Agreements are completed for the above contractors.

SPECIAL STUDY MILESTONE SCHEDULE

The following schedule is provided for SSC proposal and planning purposes.

Special Study Award1 Jan 2014
Special Study Kickoff15 Jan 2014
SRP-3 Demo Task Order RFP15 Feb 2014
SRP-3 Demo Task Order Award15 May 2014
Demo SRR10 Jul 2014
Demo PDR15 Sep 2014
Demo CDR10 Dec 2015
Special Study Mid-term31 Mar 2016
Demo PSRR15 Sep 2016
SDL MRR30 Sep 2016
SMC FRR1 Dec 2016
ILC15 Dec 2016
Special Study Outbrief28 Jan 2017

REFERENCES

The following documents are included by reference for additional requirement details as specified herein.

LSMA Performance Work Statement, dd mmm yyyy.

SRP-3 Contracts, dd mmm yyyy.

1 | UNCLASSIFIED// NOT FOR PUBLIC RELEASE

LSMA SSRD-4.1 – Rev 0 – 3 Jan 2012 Page 6 of 9