6.a-L102_Appendix_A__-_MID_SM-2.2_v5_4_Feb_2013.docx

DOCX document 46 KB Posted

Attached to
Launch Services Mission Assurance (LSMA) Federal contract opportunity
Solicitation number
FA8818-13-R-0021
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

FA8818-13-R-0021 L102 Appendix A - Sample Mission 2.2

View the file

Other files for this federal contract opportunity

Other files attached to Launch Services Mission Assurance (LSMA), newest first.
File Type Posted
LSMA_Industry_Q A'sUpdated_Answers.pdf PDF
LSMA_CvrLtr_FBOPost_Industry_Q A'sUpdated_Answers.pdf PDF
The_LSMA_BidderVersion_4.0RELEASE.pdf PDF
LSMA_Industry_QA_4_v2Final27Aug13.pdf PDF
RSLP_WBS.pdf PDF
FBO_Post_Updated_Estimated_RFP_Release_11Jul13.pdf PDF
OCI _SMC_OCI_Mitigation_Plan_Checklist_(May_07).doc DOC document
OCI _SMC_OCI_Mitigation_Plan_Checklist_(May_07).doc DOC document
LSMA_Industry_QA_3_v1_13Jun13.pdf PDF
LSMA_Draft_RFP_No.3_Ltr_to_Offerors.pdf PDF
FA88180-13-R-0021_DRAFT_NO.3_31MAY13.pdf PDF
7-_M101_M102_Rev_0_-_31_May_13.pdf PDF
6.d-L102_Appendix_D_--_Pricing_Tables_Rev_0_31_May_13.xlsx XLSX spreadsheet
Bidders_LibraryVersion_2__RELEASE_20_May13.pdf PDF
LSMA_Industry_Q A_No.2_FBO_Post_20May13.pdf PDF
FA8818-13-R-0021_Draft_Version2_25_Apr13_Post.pdf PDF
23_6.d-L102_Appendix_D_--_Pricing_Tables_v7_22_Apr_13.xlsx XLSX spreadsheet
L101_Rev9_-_22_Apr_13.pdf PDF
LSMA_D_RFP_No_2_25Apr13_Ltr_to_Offerors.pdf PDF
22_7-_M101_M102_Rev_9_-_22_Apr_13.pdf PDF
LSMA_Industry_QA_v7_PKTN_FBO_Post_25Apr13.pdf PDF
Bidders_Library_Vol_I_24Apr13.pdf PDF
Industry_Day_Master_Presentation_v6_15_Apr_13_as-briefed_rr.pdf PDF
FBO_Post_List_of_Industry_Day_Attendance.pdf PDF
LSMA_2013_Industry_DayFBO_Notice.pdf PDF
Building_201_Location.ppt PPT presentation
Reschedule_Industry_Day_and_Bidders_LibraryRequirement_for_Industry.doc DOC document
7-_M101_M102_Rev_9_-_26_Mar_13.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-3.3_v5_4_Feb_2013.docx DOCX document
L_Appendix_C_4--_Past_Performance_Questionnaire.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-2.4_v5_4_Feb_2013.docx DOCX document
LSMA_dRFP__Ltr_to_Offerors_26Mar13.pdf PDF
6.a-L102_Appendix_A__-_MID_SM-2.1_v5_4_Feb_2013.docx DOCX document
6.b-L102_Appendix_B__-_SSRD_4.2_v5_4_Feb_2013.docx DOCX document
L_Appendix_C_2--_Consent_Letter.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-2.3_v5_4_Feb_2013.docx DOCX document
7-_M101_M102_Rev_9_-_26_Mar_13.doc DOC document
L_Appendix_C_1_--_Client_Authorization_Letter.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-3.6_v5_4_Feb_2013.docx DOCX document
6.0_L102_-_Rev_9_26Mar13PKTS.doc DOC document
L_Appendix_C_3--_PPQ_Cover_LetterRev.doc DOC document
6.a-L102_Appendix_A__-_MID_SM-3.7_v5_4_Feb_2013.docx DOCX document
DRAFT_RFP_FA8818-13-R-0021_26MAR13.pdf PDF
6.b-L102_Appendix_B__-_SSRD_4.1_v5.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.2_v5_4_Feb_2013.docx DOCX document
6.e-L102_Appendix_E__-_TASC_MA_Bridge_PWS_Transition_Excerpt.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.8_v5_4_Feb_2013.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.4_v5_4_Feb_2013.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.5_v5_4_Feb_2013.docx DOCX document
6.a-L102_Appendix_A__-_MID_SM-3.1_v5_1_Feb_2013.docx DOCX document
Show all 50

Launch Services Mission Assurance (LSMA) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED// SM-2.2

UNCLASSIFIED

Sample Mission 2.2

Minotaur 6 New Launch System Mission Information Document (MID)

FA8818-13-R-TBD

Draft v5 4 Feb 2013

REVISION HISTORY

REVISION
DATE
SECTION AFFECTED
COMMENTS
0
TBD
All
LSMA Draft RFP
1.0INTRODUCTION4
1.1OVERVIEW4
1.2SCOPE4
2.0MISSION OBJECTIVES5
3.0ROLES AND RESPONSIBILITIES5
3.1Customer:5
3.2SMC/SDL:5
3.3Mission Assurance Contractor (MAC):5
3.4Launch Services Contractor (LSC):6
3.5Agreements6
4.0MISSION MILESTONE SCHEDULE6
5.0MISSION ASSURANCE REQUIREMENTS6
5.1LSMA PWS MA Requirements6
6.0REFERENCES7

INTRODUCTION

OVERVIEW

This Mission Information Document (MID) provides the mission assurance information for the Orbital Suborbital Program–3 (OSP-3) Lane 2 contract launch of a satellite on a developmental design (PDR-level) Minotaur 6 launch vehicle. SM-2.2 is a space launch mission being sponsored by SMC. The US Air Force, Space and Missile Systems Center (SMC) Rocket Systems Launch Program (RSLP) office, Space Development and Test Directorate (SD)/Launch Systems Division (SDL), will provide the Launch Vehicle (LV) and launch services for the SM-2.2 mission through the OSP-3 contract. SMC will be responsible for coordination of the Space Vehicle (SV) activities.

The baseline launch location for this mission will be from the Kodiak Launch Complex.

This will be an OSP-3 mission, but the Mission Assurance (MA) Category will not be determined until launch service award. The MAC should provide a single proposal including an MA Cat2 baseline, with a priced option to reduce the MA to Cat1 within 30 days of task order award.

The payload for this mission is UNCLASSIFIED.

PURPOSE

The purpose of this document is to provide mission-specific information for the SM-2.2 mission assurance effort by identifying the Launch Service Mission Assurance (LSMA) contract Performance Work Statement scope specific to this mission, and to provide schedule and other mission information required in order to propose and execute Independent Verification and Validation (IV&V) activities. This MID will:

a. Identify the overall mission objectives.

b. Identify roles and responsibilities and interfaces of which the mission assurance contractor (MAC) should be aware among the various contractors and Government agencies supporting the mission.

c. Identify the baseline mission execution schedule milestones.

d. Identify any mission-unique launch activities.

MISSION OBJECTIVES

The primary goal of the SM-2.2 mission is to launch an 1100 kg SV with a navigational payload into a MEO Transfer Orbit (MTO) with apogee at 20,300 km (objective) and 55 degrees inclination.

The SV will be launched into a transfer orbit by the LV, and will perform its own circularization with onboard systems. The SM-2.2 SV will separate from the LV via a SV provided motorized lightband separation system. Following the separation event, the LV will perform a Collision/Contamination Avoidance Maneuver (C/CAM) to minimize contamination and potential recontact with the SV, and will either move into an allowed orbit or be de-orbited to meet space debris requirements.

ROLES AND RESPONSIBILITIES

The roles and responsibilities among agencies and contractors that will support the SM-2.2 mission are described below.

Customer:

The SV is being provided to RSLP by an SMC SPO. The Customer Space Vehicle Contractor (SVC) is responsible for manufacturing and testing the SV as well as supporting joint LV/SV integration procedures. Additionally, the SV System Program Office (SPO) will provide submissions for the LSC’s Range Safety documentation at the request of SMC/SDL.

SMC/SDL:

SMC/SD, located at Kirtland AFB, NM, is responsible for launch services including range support, LV integration, SV interface and mating, and launch services. Within SMC/SD, SDL is the division for Research and Development (R&D) and Space launch missions and is responsible for the OSP-3 launch systems and launch operations.

Mission Assurance Contractor (MAC):

The MAC provides MA and Independent Verification and Validation support to the mission in accordance with this MID.

Launch Services Contractor (LSC):

SMC/SDL contracted with Orbital Sciences Corp via the OSP-3 contract to provide the LV design, integration, and interface to the SV, vehicle mating, mission planning and launch of the LV.

Agreements The MAC shall ensure that Associate Contractor Agreements are completed for the following associate contractors:

· LSC

· Tecolote Research, Inc

· Aero Thermo Technology, Inc

If necessary, the MAC shall also ensure that Non-Disclosure Agreements are completed for the above contractors.

MISSION MILESTONE SCHEDULE

The following schedule is provided for MAC proposal and planning purposes.

Launch Service Task Order RFP1 Sep 2018
Launch Service Task Order Award1 Jan 2019
LSC SRR10 Mar 2019
LSC MDR-115 Jul 2019
LSC MDR-210 Dec 2019
LSC PSRR15 Apr 2020
SDL MRR30 Apr 2020
SMC FRR5 Jun 2020
ILC15 Jun 2020

MISSION ASSURANCE REQUIREMENTS

LSMA PWS MA Requirements The MAC shall provide Cat2 MA (PWS Section 3.2.2) for this mission in accordance with the PWS.

The mission includes LSC conduct of a booster mechanical pathfinder at Kodiak Launch Complex approximately one year prior to the ILC, and developmental (modal) testing, which require GFE Ground Test Motor processing support (PWS Section 3.2.6).

The MAC shall also provide GFE flight motor processing support (PWS Section 3.2.5) for this mission.

The Period of Performance of this effort is estimated to be Jul 2018 thru Sep 2020.

REFERENCES

The following documents are included by reference for additional requirement details as specified herein.

LSMA Performance Work Statement, dd mmm yyyy.

OSP-3 Lane 2 User’s Guide, dd mmm yyyy.

1 | UNCLASSIFIED// NOT FOR PUBLIC RELEASE

LSMA SM-2.2 – Rev 0 Page 1 of 5

File details come from the government source that posted it. Updated .