E2 Draft RPP Updates_Letter to Industry (20240710) (Unclassified).docx
DOCX document 180 KB Posted
- Solicitation number
- FA8810-RFI-24-0003
- Issued by
-
Department of the Air Force
About this file
This document is a draft Request for Proposal (dRPP) update letter to industry regarding the Space Systems Command (SSC) Resilient Missile Warning/Missile Tracking (MW/MT) Medium Earth Orbit (MEO) Epoch 2 program.
The key details are:
- The draft RPP, including updated attachments and a revised Performance Work Statement/Statement of Objectives, has been released to the Bidder's Library for review. Vendors must have access to the Bidder's Library to receive the documents.
- An Industry Day #2 is scheduled for 17 July 2024 (with a backup date of 18 July) to discuss the changes outlined in the "Epoch 2 Final Industry Day Change Updates 17 July 24" slides.
- The formal RPP and final MBSE Model are expected to be released in the mid-week of 22 July 2024.
- A third Government Reference Architecture (GRA) review may be held after Industry Day #2, or a recorded walkthrough may be provided instead.
- The letter provides points of contact for the RFI and contracting office.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unclassified
Epoch 2 Team Update to Industry (Draft RPP #2)
10 July 2024
Please review the below content carefully as there are several updates.
Document Updates
1. 10 July 2024 Draft RPP Drop #2: All updates are available in the Live Link E2 Bidder’s Library.
0. Please review Lt Col Goff’s “Epoch 2 Final Industry Day Change Updates 17 July 24 (located inside “Industry Day #2” folder) as it summarizes all the changes we made since draft RPP release in May.
1. Attachment 8 (Updated and Available in the Bidder’s Library)
1. Updated instructions on ASSET template packages to use
1. Updated SSGM Scenes and updated instruction on how-to
1. Attachment 8d Parameter Spreadsheet 20240703
1. Software License Agreement (SLA) instructions for Python Software Bundle (PSB)
1. Cyber Requirements
2. Big progress made on our cyber requirements per industry feedback. The changes are available as part of this update.
1. NEBULA and the 3rd Crosslink
1. SOW/SV Solicitation/CRM (Updated and Available in the Bidder’s Library)
4. CRM: E2 Team will continue working on CRM comments after working on other priorities for RPP release.
1. SCG/Classified Comments (Updated and Available in the Classified Bidder’s Library)
1. CN#’s for Classified SRD (Updated and Available in the Classified Bidder’s Library)
1. BMSOC Updates
7. We are completing engineering review boards to scope the back-up SOC.
1. ADRL (Updated and Available in the Bidder’s Library)
1. POMP (Available in the Bidder’s Library)
Schedule/Event Updates
1. Industry Day #2 (Primes Only) –Wednesday, 17 July (18 July as a back-up date)
a. Each Prime will have a 1-hour Teams meeting with E2 Team (No in-person option).
b. Industry Day #2 Pre-Brief – Tuesday, 16 July
c. Due to limited time, there will be no “intro briefing” from the E2 team – Instead, we will host a “Pre-brief” session on 16 July to go over the “Epoch 2 Final Industry Day Change Updates 17 July 24” slides. With that, please closely review Lt Col Goff’s “Epoch 2 Final Industry Day Change Updates 17 July 24” ppt slides in the Bidder’s Library.
d. The 17 July meeting will focus on the topics specified in the “Epoch 2 Final Industry Day Change Updates 17 July 24”.
e. Please reach out to Lt Rachel Jung (rachel.jung@spaceforce.mil) if you are planning on participating in this event and/or “Pre-brief”.
2. E2 Timeline/Schedule
a. The formal RPP/Final MBSE Model release - Mid-week of 22 Jul.
3. GRA Review #3 – Date/Time TBD
a. Updated GRA models available in the Bidder’s Library.
b. The E2 MBSE team is considering hosting another GRA review.
c. The review will be some time after Industry Day #2.
d. The review might be replaced with a recorded walk-thru video, depending on E2 team availability.
e. If we decide to post the video instead of holding the review, we will receive questions/comments via email and post the government feedback to comments on the CRM.
Bidder’s Library Update Folders *Updated/Added items are highlighted. The easiest way to identify updates is to look at “Modified” dates.