Pre-Proposal Conference Talking Paper - Ellsworth AFB - FA8773-11-0027.pdf
PDF 51 KB Posted
- Attached to
- Operations and Maintenance of the Base Telecommunications System (BTS) at Ellsworth AFB SD.
- Solicitation number
- FA8773-11-R-0027
About this file
Pre-Proposal Conference Talking Paper
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 4A - Collective Bargaining Agreement | — | |
| Conformed FA8773-11-R-0027-0002.pdf | ||
| FA8773-11-R-0027-0002.pdf | ||
| Questions and Answers- Ellsworth.pdf | ||
| FA8773-11-R-0027-0001.pdf | ||
| Conformed FA8773-11-R-0027.pdf | ||
| Atch 1 - Pricing Table.xlsx | XLSX spreadsheet | |
| Pre-Proposal Conference Presentation - Ellsworth AFB - FA8773-11-0027.pdf | ||
| Pre-Proposal Conference Sign-In Sheet - Ellsworth AFB - FA8773-11-0027.pdf | ||
| Pre-Proposal Conference Colony WY - Ellsworth AFB - FA8773-11-0027.pdf | ||
| Exhibit A - CDRL.pdf | ||
| Atch 1 - Pricing Table.xlsx | XLSX spreadsheet | |
| Atch 3 - EIPS.docx | DOCX document | |
| Atch 5 -DBA GD.pdf | ||
| Atch 2 - PWS.docx | DOCX document | |
| QASP | — | |
| FA8773-11-R-0027 soliciation.pdf | ||
| Atch 4 - CBA.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Talking Paper
PRE-PROPOSAL CONFERENCE
Solicitation FA8773-11-R-0027 Ellsworth AFB SD
DATE: 25 August 2011
TIME: 0930 - 1230
LOCATION: Building 8225
Ellsworth AFB, SD
Type of Meeting: INFORMATIONAL
Briefer: Ryan Brinkley, Contract Specialist, (405) 734-9708
38 CEG/PKL
4079 Hilltop Rd Tinker AFB, OK 73145-2713 Email: ryan.brinkley@tinker.af.mil
Michael Treanor, Contracting Officer, (405) 734-9640
38 CEG/PKL
4079 Hilltop Rd Tinker AFB, OK 73145-2713 Email: 38CEG.pkl@tinker.af.mil
Attendees: SEE SIGN-IN LIST, ATTACHED
Agenda: Thursday, 25 August 2011
Meeting: 0930-1030 Site Visit: 1030-1230 Dismissal for the day
Introduction/ Welcome: Explain administrative procedures Opportunity to visit the installation and areas to be maintained
Questions: All questions must be submitted electronically (via e-mail) by close of business on 30 August 2011 to Mr. Ryan Brinkley
(ryan.brinkley@tinker.af.mil) AND 38CEG.pkl@tinker.af.mil (This mailbox will be monitored for this purpose only). Questions and Answers will be posted publically on www.fbo.gov.
mailto:ryan.brinkley@tinker.af.mil� mailto:38CEG.pkl@tinker.af.mil� mailto:ryan.brinkley@tinker.af.mil� http://www.fbo.gov/�
General Info:
• Offerors are reminded that nothing stated, either written or verbal, during the conference shall alter the terms and conditions of the solicitation and specifications.
• Each Offeror is responsible for reading the entire solicitation before submitting their proposal.
Contract Review:
• Federal Acquisition Regulation (FAR) Part 15, Non-Commercial Acquisition procedures apply.
• This is a Performance Based Service Contract. The intent is for agencies to describe their needs in terms of what is to be achieved, not how it is to be done. These policies have been incorporated into the PWS IAW FAR Subpart 37.6, Performance Based Contracting.
• Standard Form 33, block 9, offer is due 1:00 PM CST on 09 Sep 2011 to 38 Cyberspace Engineering Group(CEG)/PKL, 4079 Hilltop Rd, Tinker
AFB OK 73145-2713.
Section B - Supplies/Services and Prices
• This solicitation was written using the Procurement Desktop-Defense (PD2) Standard Procurement System (SPS) contract writing system.
Offeror’s are required to provide proposal pricing on the Pricing Table spreadsheet provided as Attachment 1 with the solicitation.
• CLIN descriptions remain the same for the base period and all option periods.
Option periods can be identified by changes in CLIN/SLIN numbering as follows:
CLIN 0XXX = Base Period CLIN 1XXX = Option Period 1 CLIN 2XXX = Option Period 2 CLIN 3XXX = Option Period 3 CLIN 4XXX = Option Period 4
• Time and Material CLINs have been removed from the solicitation and Performance Work Statement (PWS).
Section F - Delivery Information
• Base Period 01 Jan 2011 – 30 Sep 2012
• Option Period 1 01 Oct 2012 – 30 Sep 2013
• Option Period 2 01 Oct 2013 – 30 Sep 2014
• Option Period 3 01 Oct 2014 – 30 Sep 2015
• Option Period 4 01 Oct 2015 – 30 Sep 2016
Section H - Special Contract Requirements
• Applicable wage determinations are attached to this solicitation and resulting contract. The wage determinations, incorporated by reference, in the solicitation were current as of the solicitation release date and will be verified prior to FPR.
• The Contractor is the responsible party when determining the appropriate labor category for contract tasks and paying the appropriate prevailing wage to their employees. If a need exists for an additional labor category/wage classification, it is the Contractor’s responsibility to file an SF-1444 and follow the Department of Labor (DOL) conformance process outlined in FAR Clause 52.222-6.
Section I – Contract Clauses:
• FAR Clause 52.222-43 – Fair Labor Standards Act and Service Contract Act – Price Adjustment At the beginning of the contract or after receipt of the contract modification incorporating the revised CBA, if warranted, the contractor will be allowed to request an adjustment to the unit price for Monthly Maintenance only.
• FAR Clause 52.222-30 – Davis-Bacon Act – Price Adjustment (none or
Separately Specified Method) Offeror’s will not be able to request equitable adjustments for increase in DBA DOL wage decisions for the out years.
• FAR Clause 52.249-14 Excusable Delays Except for defaults of subcontractors at any tier, the Contractor shall not be in default because of any failure to perform this contract under its terms if the failure arises from causes beyond the control and without the fault or negligence of the Contractor.
Examples of these causes are:
(1) acts of God or of the public enemy,
(2) acts of the Government in either its sovereign or contractual capacity,
(3) fires,
(4) floods,
(5) epidemics,
(6) quarantine restrictions,
(7) strikes,
(8) freight embargoes, and
(9) unusually severe weather.
Section K – Representations, Certifications and Other Statements of Offerors
• Please review DFARS clause 252.204-7007. Offerors are required to complete Reps and Certs using ORCA (on line) at http://orca.bpn.gov.
Section L – Instructions, Conditions and Notice to Bidders
• Some Solicitation Provisions are incorporated by Reference – Any solicitation provision by reference has the same effect as if it were given in full text. The full text of a clause may be accessed electronically at this address: http://farsite.hill.af.mil
L-1 Proposal Preparation Instructions
• Offerors shall submit their proposal in accordance with the instructions in Section L to include all data and information required by this solicitation.
• Proposals shall be submitted in one binder (multiple copies); various factors identify specific requirements for those areas.
• Page limitations are mandatory. Do not exceed them, as excess pages will not be evaluated and will be destroyed.
• Remember that L correlates to Section M. Review both to ensure full understanding of submission requirements.
Section M – Evaluation Factors for Award
• The Government will evaluate proposals using a competitive best value source selection in which competing Offerors' past performance history will be evaluated on a basis approximately equal to cost or price considerations.
• The Government reserves the right to award without discussions. Best proposal should be submitted up front, as there may be no need to clarify, or otherwise negotiate with Offerors.
• Offerors should understand, however, that “gold plating” or grossly overstating a requirement may result in elimination from the competitive range, or failure to receive an award. Proposals of this nature DO NOT represent the best value to the government and often result in an http://orca.bpn.gov/� http://farsite.hill.af.mil/� unaffordable price. Offerors should seek a balance between offering the best proposal to ensure the contract requirements are met (as a minimum) and still provide the best overall price. BEST VALUE DOES
NOT ALWAYS MEAN LOWEST PRICED OFFER.
• Proposals that are unrealistic in terms of cost or reflect a lack of comprehension of the complexity and risk may be rejected.
• Discussion of Factors
• Factor 1, Technical See individual sub-factor requirements. This is not the place to state how you’ve performed someplace else. This is how you intend meet THIS base’s mission.
• Factor 2, Past Performance This is where you discuss how you’ve performed someplace else. Ensure you adequately convey recent and relevant past performance. The assigned confidence rating is a direct result of demonstration of required experience as defined in the relevancy criteria.
• Factor 3, Price Submittal of prices is only on the Excel spreadsheet attached to the RFP document. Failure to use this specific document or it’s formally changed revision may render your proposal non-responsive. The Government uses electronic and manual tools to verify tampering with formulas contained in the spreadsheet.
• See Sections L&M for a full discussion on how to properly propose prices.
• ADDITIONALLY, and perhaps one of the most important is to review the PWS, all appendices, and especially the EIPS to ensure your prices are adequately covered. For example, several instances have occurred where an offeror failed to understand that prices for manhole installation include more than just the labor to set the manhole. SEE THE EIPS FOR DESCRIPTIONS of what is included.
Attachment 1 – Pricing Table
• This will result in a single award ID/IQ contract. Quantities are estimates representing the Government’s good faith projections. The government reserves the right to exceed estimated quantities to meet mission requirements.
• 1st Tab (Summary Sheet), entry of unit prices for O&M, Other Services, and CDRL A001. – prices for CLINs x004 through x008 are automatically carried forward from the other worksheets (tabs).
Formulas are in place for Special Projects (x009) and Option to Extend Services (x010). Ensure no blank cells or N/A, None, etc are used. Do not change formulas – could result in non-responsive proposal and elimination.
• Remaining Tabs - Unit prices required for every Product Identification
(PID) in the Base Year and all option years. Look for the Dark Yellow highlighted cells; they generally indicate where prices are required.
Contractors may escalate prices as they wish. There is no longer an escalation table/formula within the Pricing Table. Pay close attention to this – this is a Firm Fixed Price (FFP) contract, so when prices go up, there is no price adjustment for this contract.
• ENSURE that prices reflect mixed rates for DBA/CBA work where the offeror believes such is necessary based upon their technical solution.
There are DBA efforts on this contract. However, there is not a DBA adjustment due to escalation. You should account for escalation in your PID prices. CBA does get an adjustment if it applies during the course of the contract.
Attachment 2 – Performance Work Statement (PWS)
• Each Offeror is responsible for reading the entire PWS before submitting their proposal.
• Section 1 – Description of Services overview & Scope. O&M of System (BTS) 24 hours per day, 7 days per week. Overtime premiums are not paid through the contract. However, contractors are responsible for paying employees according to the applicable labor law. Offerors should factor those costs within the prices proposed. Most work will be during normal duty hours, but there may be times when the contractor is required to stay beyond or work weekends to meet mission requirements.
• Section 1.3 covers operation and maintenance responsibilities and is directly related to the price proposed for the same.
• O&M (monthly maintenance) does not include work orders for pre-priced contract line items. Those will be accomplished IAW PWS section 1.4 to include relocates and removals. Note that cable outages/cuts can be confusing. Cut cables are considered an outage, covered by section 1.3 O&M. That is the contractor will provide response, troubleshooting and emergency splicing to bring the affected cable back into service. Final cable repair, however, is covered by Section 1.4 work orders.
• Work Center Records – Contractor shall develop and maintain work center records IAW PWS Section 1.3.15. These records shall remain on site and be readily available for review by the COR and CA and other personnel (authorized in writing by the CO).
• Section 1.4 covers work orders. Read and understand the process of issuing work orders and the difference between tasks performed under O&M instead of work orders.
• Please note – Section 1.4 has been reduced due to language being moved to EIPS. PWS is a description of services to be performed and we felt some of the language in 1.4 originally was more definition/specifications for guidance for performance.
• DBA work orders require additional steps. Ensure you understand the law and the process for accomplishing these efforts.
• DBA is important to understand as you will need to ensure your accounting system adequately supports segregation of expenses and hours.
• Special projects are Firm Fixed Price (FFP) negotiated requirements.
They must be in scope. See PWS 1.5. The CO will request a proposal from the Contractor for special projects. The Government may negotiate a special project into the contract when an effort is needed that is not covered by current line items on the contract. These are one-time efforts that are within the scope of the contract. Special projects will not cumulatively total more than 25% of the total price of CLINs X001- X008 for the Base Period and all Option Periods.
Note: PWS section 1.5 details all items to be included in contractor proposals (i.e. identifying CLIN/PID items, direct and indirect costs, etc.) please review.
• Attachment 4 – Collective Bargaining Agreement (CBA)
All offerors need to be aware of the CBA which applies to the solicitation, and the influences it has on the solicitation.
• Appendix 5.2 Items to be maintained by the contractor – This section identifies the items, equipment, material, and facilities to be maintained by the contractor under monthly maintenance and is updated annually by the contractor to include changes occurring as a result of the work order process. Everything listed in 5.2 is contractor’s responsibility. If equipment/items are not listed in 5.2, then the contractor is not responsible.
• Appendix 5.3 covers glossary and acronyms. Don’t use your own definitions, use the ones provided. If you don’t understand any – submit the questions to Mr. Ryan Brinkley in writing via e-mail by 30 August 2011. (ryan.brinkley@tinker.af.mil AND 38CEG.pkl@tinker.af.mil)
• Appendix 5.4 – VSS support information. Covers everything under
Appendix 5.2.3.
• Appendix 5.5 – Applicable documents. Make sure you read and understand all guidance in relation to this contract. Understand this list is not all inclusive.
• Appendix 5.6 – GPS. Make sure you read and understand.
Attachment 3 – Equipment and Installation Performance Specification
(EIPS)
• Defines and provides contractor guidance and instruction related to the purchase and installation of items under this contract. The EIPS contains critical information (full description of job) necessary to properly price the various items on the Pricing Table. Failure to read and understand the EIPS may result in unrealistic, unreasonable, or unbalanced pricing and failure to receive an award.
Exhibit A – Contract Data Requirement List (CDRL) A001
• This CDRL is an USAF manpower reporting requirement. There will be two CDRL submissions in the base period and one submission per year thereafter.
Quality Assurance Surveillance Plan (QASP)
• This is a living document that will be revised thru the course of the contract. Not incorporated as an attachment, but explains team member roles and responsibilities during the course of the contract. Important to contractors, because it explains assessment methods used by the QAP.
Amendments: Any/all changes to the solicitation shall be identified via formal amendment.
Closing Posting to Federal Business Opportunity – Electronic Posting System (EPS) website http://fbo.gov
1. Copy of (Talking Paper)
2. List of Attendees mailto:@tinker.af.mil� http://fbo.gov/�
Site Visit: Dial Central Office (DCO): Bldg 4307 Remote Switching Terminals: Bldg 8225, Bldg 4307, Bldg 7925
Type of
File details come from the government source that posted it. Updated .