NOSB_Atch_19_CITS_ITS_FFP_Amend_0006.xlsm

XLSM spreadsheet 232 KB Posted

Attached to
NETCENTS-2 NETOPS AND INFRASTRUCTURE SOLUTIONS (SMALL BUSINESS COMPANION)
Solicitation number
FA8771-09-R-0019
Issued by

About this file

NOSB Amendment 0006 dated 5 OCT 2012 - Atch 19 Native Doc

View the file

Other files

File Type Posted
NOSB_FBO_Notice.pdf PDF
NOSB_Amend_0009.pdf PDF
NOSB_QandA_3.pdf PDF
NOSB_Amend_0008.pdf PDF
NOSB_Amend_0008_Cover_Letter.pdf PDF
NOSB_QandA_2.pdf PDF
NOSB_Atch_13_PPIS_Amend_0007.doc DOC document
NOSB_Atch_19_CITS_FFP_Amend_0007.xlsm XLSM spreadsheet
NOSB_Atch_21_Price_Workbook_Amend_0007.xlsm XLSM spreadsheet
0007.pdf PDF
Cover_Letter_NOSB_Amend_0007.pdf PDF
NOSB_Section_K.doc DOC document
NOSB_QandA.pdf PDF
Conformed_FA8771-09-R-0019_thru_Amend_0006.pdf PDF
NOSB_Clause_Update_Matrix_Amend_0006.xls XLS spreadsheet
NOSB_Atch_27_Training_Plan_Template_FFP_STO_Amend_0006.docx DOCX document
20121005_NOSB_Amend_0006_Cover_Letter.pdf PDF
NOSB_Atch_12_PP_Cover_Amend_0006.doc DOC document
NOSB_Clause_Update_Matrix_Amend_0006.pdf PDF
NOSB_Amend_0006.pdf PDF
NOSB_Atch_13_PPIS_Amend_0006.doc DOC document
NOSB_QandA_Amend_0006.xls XLS spreadsheet
NOSB_Atch_21_Price_Workbook_Amend_0006.xlsm XLSM spreadsheet
20120925_-_NOSB_FBO_Announcement.pdf PDF
NetCents 2 NetOps SB Update -7 June 2012.doc DOC document
Atch 1_PWS_NetOps SB.doc DOC document
Atch 8_ITO_NetOps SB.doc DOC document
Amendment 0005.pdf PDF
Atch 25_NAICS_Appeal_Decision.pdf PDF
NETCENTS 2_Amend 0004.pdf PDF
Atch 8_ITO_NetOps SB.doc DOC document
Atch 19_CITS_ITS_Pricing_Model_NetOps SB.xls XLS spreadsheet
NetOps SB - Amend 0003.pdf PDF
Atch 24_Order_Extending_Close_Of_Record.pdf PDF
NetOps - SB Amend 0002.pdf PDF
Atch 17_CITS BPD_NetOps SB.doc DOC document
Atch 10_PP Consent_NetOps SB.doc DOC document
Atch 16_CITS Archit_NetOps SB.doc DOC document
Atch 19_CITS Pricing_NetOps SB.xls XLS spreadsheet
Atch 20_NM ND STO_NetOps SB.doc DOC document
Atch 8_ITO_NetOps SB.doc DOC document
Atch 13_PPIS_NetOps SB.doc DOC document
Atch 14_CITS STO_NetOps SB.doc DOC document
Atch 9_Eval Criteria_NetOps SB.doc DOC document
Atch 15_CITS Bldg List_NetOps SB.xls XLS spreadsheet
Atch 18_CITS Install Plan_NetOps SB.doc DOC document
Atch 21_Price Workbook_NetOps SB.xls XLS spreadsheet
Atch 12_PP Cover_NetOps SB.doc DOC document
Atch 11_PP Relevancy_NetOps SB.doc DOC document
Atch 1_PWS_NetOps SB.doc DOC document
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Offeror Cover Page

NETOPS & INFRASTRUCTURE SOLUTIONS

Small Business

FA8771-09-R-0019

Attachment 19

Offeror Name:
Offeror Address:
City:
State:
Zip:
Point of Contact
Phone 1
Phone 2:
Fax 1:
Fax 2:
E-mail 1:
E-mail 2:

NETCENTS-2

Summary

WBS Function Baseline Price Location Adjustment Factor * Proposed Price Remarks

Site Survey & DesignSS&IP$ - 01$ - 0
InstallationInstallation Summary$ - 0$ - 0
Travel$ - 01$ - 0
Distribution System Installation$ - 01$ - 0
Network Labor$ - 01$ - 0
Network Material$ - 01$ - 0
GPS Data$ - 01$ - 0
Training$ - 01$ - 0
Post installation Support$ - 01$ - 0

Total $ - 0 $ - 0

Notes:SUMMARY DISPLAY ONLY - PRICES ARE NOT ENTERED ON THIS SHEET
This sheet automatically calculates prices as pricing data is entered on the other tabs.
* Location Factor is 1 for purposes of evaluation of the Sample Task Order. (In real world, vendors would input Location Factors, and
any Location Factor that does not = 1.000 would be explained in the "Remarks" column)

Escalation Calculations

FYPriceInflation RatePrice
2010$ - 01.0000000$ - 0
2011$ - 01.0239794$ - 0
2012$ - 01.0409708$ - 0
2013$ - 01.0586673$ - 0
2014$ - 01.0766646$ - 0
2015$ - 01.0949679$ - 0
2016$ - 01.1135824$ - 0
2017$ - 01.1325133$ - 0
2018$ - 01.1517660$ - 0
2019$ - 01.1713460$ - 0
TOTAL PROPOSED PRICE **$ - 010.8644577

** Transfer Total Proposed Price to Attachment 21, TEP tab, "Information Transport System - CITS Total Price" cell

CITS Pricing Model Summary

&8FA8771-09-R-0019-0006

Section J, Attachment 19 &A Page &P of &N

Price by Fiscal Year

Price20102011201220132014201520162017201820190000000000Cumulative Price by Fiscal Year
Price20102011201220132014201520162017201820190000000000

SS&IP

Total Price Calculation ---->S1(B1+C/2)+ S2*(B2+.2*C)+ S3*K1(B3+B5) +S4*B4 +S5*B6+S6*P1+S7*P2Total Price =$ - 0Offeror enter proposed price* as applicable in Col H. Total price is calculated automatically in Cells F3-G3 (using the formula indicated in Cell E3)
FactorFeatureDescriptionMethod for Determining Quantity
(Government provided values)Model VariableGovernment Provided Value

NielsenA: NielsenA:

Government provided data. Do not alter.Task Element Proposed PriceRemarks
B1# of buildings that need either Network or DS surveyBuildings that the contractor must physically survey to obtain all information required for the DS and/or network design.Any building that the contractor must survey for either Network or DS is counted as 1.S177$ - 0
C# of Extra Equipment LocationsAdditional locations inside a building that contractor must physically survey to obtain all information required for the distribution and network design.Every building is assumed to have one equipment locations. Each additional location in the building is counted as 1.N/A43N/A
B2# of buildings with fiber to be testedEach strand of all existing single mode and multi mode fiber that is a candidate for reuse must have a two way power meter test and a one way OTDR test.All exisitng fiber must be tested during SS&D. Each fiber run between an ITN and either an ITN or EBN is counted as 1 building.S267$ - 0
B3# of buildings that need fiberBuildings that will require complete DS design. Includes cost of rod and mandreling vacant ducts in existing Manhole and Duct system that can be used in this design.Number of buildings that currently have no fiber plant.S344$ - 0
B5# of critical EBNsBuilding will require physically redundant path to two ITNs.Number of buildings that must be connected to two ITNs.7N/A
K1% of buildings needing fiber that use existing Manhole & duct system% of buildings that need fiber that will use the base's existing Manhole & Duct System.SPO Historical estimate.N/A0.56N/A
B4# of buildings that will not be surveyedThese buildings have exisiting Network and OSP that meet requirements. Contractor is only required to verify data provided by government.Number of buildings that do not need to be physically surveyed.S40$ - 0
B6WirelessBuildings which appear to be suitable for wireless implementation where the contractor must survey and design a wireless option".# of EBNs requiring wireless connections to ITNs.S50$ - 0
P1Premise WiringTest/Evaluate existing user drops according toprocedures in TSIP, to determine if existing assets meet user requirements in the building.# of DropsS60$ - 0
P2Premise Wiring# of new Cat 5e, Cat 6 and Fiber optic connections to EBN switch that contractor must survey & design# of DropsS70$ - 0

* NOTE: Contractor proposed prices in Column H must include total cost of labor (Direct & Indirect), site survey equipment/transport , and all other associated costs; fully burdened, including profit.

SS&"Arial,Italic"P

&8FA8771-09-R-0019-0006

Section J, Attachment 19 &A Page &P of &N

Travel Factor Feature Description Method for Determining Quantity Unit Government Provided Quantity Task Element Proposed Price Remarks

B1# of buildings that need either Network or DS survey (B1)See description in SS&D ModelSee description in SS&D ModelEach77
T1Vendor's Base Price per Building (T1)Cost per buildingSee note belowN/A$ - 0
Total =
B1 * T1$ - 0

Notes: NOTE: Value in cell H4 will be the value a bidder assigns to the cost of travel relative to the effort of surveying a bldg. It includes all travel expenses (Transportation, per diem, hotel, miscellaneous, rental cars, etc., fully burdened, including profit), broken down into a per building cost to be multiplied by the number of buildings provided in cell G3.

&12Travel

&8FA8771-09-R-0019-0006

Section J, Attachment 19

DS

FactorFeatureTask DescriptionMethod for Determining Quantity
(Government provided values)UnitGovernment Provided QtyTask Element Proposed Price *Total PriceRemarks
DS1Manholes & HandholesAcquire & Install handhole made of precast concrete and/or concrete composite and having the capability to withstand street traffic loading.Number installedEach23$ - 0
DS2Acquire & Install a 6' x 8' x 7' Manhole made of precast concrete and having the capability to withstand street traffic loading. All new manholes shall have knockouts for ducts in each wall.Number installedEach5$ - 0$ - 0
DS3Acquire & Install a 3' x 5' x 4' Manhole made of precast concrete and having the capability to withstand street traffic loading. All new manholes shall have knockouts for ducts in each wall.Number installedEach11$ - 0$ - 0
DS4Acquire & Install a 8' x 10' x 7' Manhole made of precast concrete and having the capability to withstand street traffic loading. All new manholes shall have knockouts for ducts in each wall.Number installedEach3$ - 0$ - 0
DS5Acquire & Install 3 foot lengths of rack with two cable hooks.4ea (3' sections with 2ea hooks per section) per new manhole + actual # of rack sections (w/2ea hooks per) as necessary to support the new cables installed in existing manholesEach1689$ - 0$ - 0
DS6Trenching (will include bedding with sand as appropriate to the area conditions involved)Hand Dig in any location not suitable for machine trenching for direct bury armored cable, cover trench with select native material (no large rocks) & restore. surface with seed or hydroseed.Actual distanceLF2755$ - 0$ - 0
DS7Hand dig a 18"x42" trench, install & bed 2 each 4" PVC conduit bank, cover trench with select native material (no large rocks) & restore surface with seed or hydroseed.Actual distanceLF2274$ - 0$ - 0
DS8Hand dig a 18"x48" trench, install & bed 4 each 4" PVC conduit bank, cover trench with select native material (no large rocks) & restore surface with seed or hydroseed.Actual distanceLF478$ - 0$ - 0
DS9Hand dig a 20"x 44" trench, install & bed 2 each 6" PVC conduit bank, cover trench with select native material (no large rocks) & restore surface with seed or hydroseed.Actual distanceLF74$ - 0$ - 0
DS10Machine Trench a 6" x 38" slit trench suitable to direct bury cable, cover trench with select native material (no large rocks) & restore surface with seed or hydroseed.Actual distanceLF1750$ - 0$ - 0
DS11Machine dig a 18"x42" trench, install & bed 2 each 4" PVC conduit bank, cover trench with select native material (no large rocks) & restore surface with seed or hydroseed.Actual distanceLF18977$ - 0$ - 0
DS12Machine dig a 18"x48" trench, install & bed 4 each 4" PVC conduit bank, cover trench with select native material (no large rocks) & restore surface with seed or hydroseed.Actual distanceLF0$ - 0$ - 0
DS13Machine dig a 20"x 44" trench, install & bed 2 each 6" PVC conduit bank, cover trench with select native material (no large rocks) & restore surface with seed or hydroseed.Actual distanceLF1780$ - 0$ - 0
DS14Spoils removalRemove all solid waste material to an approved off base location. This element is not for any form of hazardous material.Total removedCY475$ - 0$ - 0
DS15Remove all liquid waste material to an approved off base location. This does not include the handling of bore spoils/mud/gel/fluids associated with either directional or horizontal boring. This element is not for any form of hazardous material.Total removedGallons38019$ - 0$ - 0
DS16Flexible Geotextile fabric innerductAcquire & install one pack (3 cells) in conduit. One pack must have an integrated tracer wire.Actual length installed.LF23000$ - 0$ - 0
DS17Flexible Geotextile fabric innerductAcquire & install three packs (9 cells) in conduit. One pack must have an integrated tracer wire.Actual length installed.LF45000$ - 0$ - 0
DS181" Ribbed InnerductAcquire & install in conduitActual length installed.LF457$ - 0$ - 0
DS191" Ribbed InnerductAcquire & istall 4 each in conduitActual length installed.LF1245$ - 0$ - 0
DS20RollpipeAcquire & istall 1 1/4" SIDR in trenchActual length installed.LF9405$ - 0$ - 0
DS21Metallic Armored Fiber Optic CableAcquire & istall 12 Strand in trenchActual length installed.LF0$ - 0$ - 0
DS22Metallic Armored Fiber Optic CableAcquire & install 24 Strand in trenchActual length installed.LF0$ - 0$ - 0
DS23Metallic Armored Fiber Optic CableAcquire & install 36 Strand in trenchActual length installed.LF0$ - 0$ - 0
DS24Metallic Armored Fiber Optic CableAcquire & install 48 Strand in trenchActual length installed.LF0$ - 0$ - 0
DS25Metallic Armored Fiber Optic CableAcquire and install the necessary grounding materials at each location only where the metallic jacket of the cable is exposed due to splicing and/or building entries.one/exposed locationEach0$ - 0$ - 0
DS26Dielectric Fiber Optic CableAcquire & install 12 Strand in innerductActual length installed.LF52782$ - 0$ - 0
DS27Dielectric Fiber Optic CableAcquire & install 24 Strand in innerductActual length installed.LF6686$ - 0$ - 0
DS28Dielectric Fiber Optic CableAcquire & install 36 Strand in innerductActual length installed.LF21787$ - 0$ - 0
DS29Dielectric Fiber Optic CableAcquire & install 48 Strand in innerductActual length installed.LF3349$ - 0$ - 0
DS30Dielectric Fiber Optic CableAcquire & install 60 Strand in innerductActual length installed.LF1380$ - 0$ - 0
DS31Dielectric Fiber Optic CableAcquire & install 72 Strand in innerductActual length installed.LF6254$ - 0$ - 0
DS32Dielectric Fiber Optic CableAcquire & install 96 Strand in innerductActual length installed.LF0$ - 0$ - 0
DS33Dielectric Fiber Optic CableAcquire & install 108 Strand in innerductActual length installed.LF0$ - 0$ - 0
DS34Dielectric Fiber Optic CableAcquire & install 144 Strand in innerductActual length installed.LF0$ - 0$ - 0
DS35Splice CasePrepare, install, close, seal & test. Normally ITS will only perform a cable splice operation in a MH (even on a DB cable, as there will normally be no direct bury splice case in ITS) and there currently will be no aerial splicing and therefore no aerial splice cases.Actual length installed.Each67$ - 0$ - 0
DS36Termination or SplicePrep both ends of the cable and terminate each end with a connector or splice the ends of two separate fiber together. Only fusion splicing of cable is allowed, no mechanical splices. No mechanical termination will be allowed.2 X Total number of fiber strandsEach8700$ - 0$ - 0
DS37Tracer WireAcquire & install tracer wire (in accordance with the guidance in the TSIP) in any section of a new installed cable run unless it is an armored direct buried cable. Tracer wire will be installed within the same conduit/innerduct as the cable.Actual length installed.LF99645$ - 0$ - 0
DS38Test FiberConduct OTDR one way and Power Meter test both ways, IAW TSIP guidance.Total number of fiber strandsEach1768$ - 0$ - 0
DS39Cut"T" Cut (36" x4" x length of crossing) asphalt surface, IAW with TSIP guidance. Remove and replace asphalt. Acquire all materials. Any trenching required shall be included in the applicable trenching element described elsewhere.Actual length of cutsLF750$ - 0$ - 0
DS40"S" cut (24"x4"xLF) concrete surface, IAW with TSIP guidance. Remove and replace conrete. Acquire all materials. Any trenching required shall be included in the applicable trenchning element described elsewhere.Actual length of cutsLF0$ - 0$ - 0
DS41Building EntriesCore bore diagonal 5" diameter entry.Number of entries bored.Each51$ - 0$ - 0
DS42Acquire & install 1 ea 4" riser pipe (GIP or Sch 80 UV rated) and metallic exterior weather rated (rust proof and paintable) pullbox on exterior wall of buildingNumber of pullboxes.Each14$ - 0$ - 0
DS43Directional Bores (includes the removal of all bore spoils/mud/gel/fluids associated with the operation).Bore under paved surface, acquire & install 2 each 4" HDPE conduits.Actual length of bore.LF12493$ - 0$ - 0
DS44Bore under paved surface, acquire & install 4 each 4" HDPE conduits.Actual length of bore.LF453$ - 0$ - 0
DS45Bore under paved surface, acquire & install 6 each 4" HDPE conduits.Actual length of bore.LF0$ - 0$ - 0
DS46Bore under SidewalkActual length of bore.LF789$ - 0$ - 0
DS47Manhole coresCore bore a manhole to allow installation of a 4' conduit.Number of boresEach228$ - 0$ - 0
DS48Horizontal Drilling (includes the removal of all bore spoils/mud/gel/fluids associated with the operation).This element is for drilling under runway, taxiway or railroad tracks. Acquire & install 16" diameter steel casing and flood, around the installed ducts, the entire casing with concrete slurry (900psi). Depth of bore will be determined at the time of SS&D. The amount of duct runs through the casing shall be designed using normal ITS requirements and any additional ducts will be determined during SS&D.Actual length.LF0$ - 0$ - 0
DS49FODPAcquire & install 12 fiber panelNumber of panels installed.Each54$ - 0$ - 0
DS50Acquire & install 36 fiber panelNumber of panels installed.Each19$ - 0$ - 0
DS51Acquire & install 72 fiber panelNumber of panels installed.Each0$ - 0$ - 0
DS52Acquire & install 144 fiber panelNumber of panels installed.Each0$ - 0$ - 0
DS53Acquire & install 6 head connector (feed through) panel unit.Number of panels installed.Each2$ - 0$ - 0
DS54Communication closetAcquire all materials (Fire rated walls, sheet rock, steel studs, ceiling, door, lock,surface finish, etc) and construct a communication closet.Square feet of room area.SF110$ - 0$ - 0
DS55Equipment Enclosures (includes all necessary mounting hardware)Reuse/ Relocate existing rack/cabinet. Acquire & install cable management as necessary to correctly dress cables into the rack.Actual number.Each24$ - 0$ - 0
DS56Acquire & install new relay rack & cable management as necessary to correctly dress cables into the rack.Actual number.Each27$ - 0$ - 0
DS57Acquire & install 2 Foot Wall Mount cabinet & cable management as necessary to correctly dress cables into the rack.Actual number.Each14$ - 0$ - 0
DS58Acquire & install 4 Foot Wall or Floor Mount cabinet & cable management as necessary to correctly dress cables into the rack.Actual number.Each8$ - 0$ - 0
DS59Acquire & install 7 Foot Floor Mount rack or cabinet & cable management as necessary to correctly dress cables into the rack.Actual number.Each27$ - 0$ - 0
DS60Acquire & install 8 Foot environmental Smart cabinet & cable management.Actual number.Each3$ - 0$ - 0
DS61Acquire & install Fan in cabinet.One per cabinetEach16$ - 0$ - 0
DS62Acquire & install Blower Pack in cabinet.One per cabinetEach1$ - 0$ - 0
DS63Acquire & install Backboard for wall mounted cabinet (includes 3/4" plywood w/ 2 coats of fire retardant paint) according to codes.One per cabinetEach18$ - 0$ - 0
DS64Electric powerDetermine the required power for ITS equipment and then if building power is sufficient to meet program requirements. Acquire and install one dedicated circuit from building power panel to each communication equipment rack's power strip.Each circuit is counted as 1Each125$ - 0$ - 0
DS65GroundsTest all existing communication rack grounds. For grounds failing to meet requirements and new equipment racks, install ground from equipment location to building electrical service ground.Each newly installed ground is counted as 1Each215$ - 0$ - 0
DS66CoresCore completely through interior concrete and/or metal wall or floor, acquire & install a sleeve and firestop compound.Each internal core counts as 1Each77$ - 0$ - 0
DS67Core completely through interior wood, plaster or sheeetrock wall or floor, acquire & install a sleeve and firestop compound.Each internal core counts as 1Each27$ - 0$ - 0
DS68Internal communication locationsAcquire & install communication cables in conduit, plenum and/or risor rated innerduct.Total length of installed cable.LF476$ - 0$ - 0
DS69Acquire & install new metallic conduit between locations of communications equipment.Total length of installed conduitLF6405$ - 0$ - 0
DS70Acquire & install new plenum or innerduct between locations of communication equipment.Total length of installed plenum and riser rated innerductLF469$ - 0$ - 0
DS71Acquire & Install Open mesh type cable Tray (do not use NEMA box channel (electrical raceway) enclosures as cable tray)Total length of installed cable trayLF235$ - 0$ - 0
DS72Hazardous Materials - Handling SolidsRemoval of lead base paint at wall board mounting hole locations within comm. room. This element should cover the minimal amount of hole drilling for the purpose of mounting Backboards and/or rails for wall mount cabinets/shelves. It is anticipated this is small amount per comm. closet and not intended to be a remediation of entire walls and/or rooms.Priced per sq ftSF0$ - 0$ - 0
DS73Removal of asbestos residue from performing drilling for anchor bolts thru floor or wall tiles.Priced per cubic footCF0$ - 0$ - 0
DS74Hazardous Materials
- Handling LiquidsRemoval of contanimated water for manholes. Conditions for this activity under ITS are outlined in the TSIP. Volumes are considered to be in 100s of gallons per any one action. Work should include all pumping equipment, a containment tank (vehicle or trailer mounted).Priced per 100 GallonsCGal228$ - 0$ - 0
DS75Hazardous Materials
- DisposalRemoval of either wet or dry materials. Efforts should include transportation to a local disposal site and disposal site charges.Priced per tonTN0$ - 0$ - 0
DS76Desktop User Premise Wiring (1st 400')Installation of a single new user drop between the Comm. Closet and the users Desktop. Work to include necessary patch cords at both ends, all cabling, connectors and required installation hardware, full certification testing according to BPD. This element is to be used for a single drop or per drop for groups of drops up to 12.Priced per drop0$ - 0$ - 0
DS77Installation of multiple new user drops between the Comm. Closet and a set of general geographically close user Desktops. Work to include necessary patch cords at both ends, all cabling, connectors and cable tray as well as other required installation hardware, full certification testing for each drop according to BPD. This element is to be used for multiple drops to the same general geographically area for drop counts above 12.Priced per drop0$ - 0$ - 0
DS78Installation of new 24 or 48 port Cat 6 distribution patch Panel.Price per panel0$ - 0$ - 0

Total TOTAL PRICE $ - 0

* NOTE: Contractor Unit cost must include total cost of labor (Direct & Indirect), material, equipment (Installation & test), shipping, and all other associated costs; fully burdened, including profit.

&12Distribution System Installation

Section J, Attachment 19

Page &P of &N&10

Network Labor

FactorFeatureTask DescriptionMethod for Determining Quantity
(Government provided values)UnitGovernment Provided QtyTask Element Proposed PriceTotalRemarks
L1# of Equipment LocationsDelivery of equipment to location, coordination for access and down time, time to access area, and set up and clean up of equipment installation area.Each unique equipment location is counted as 1 unitEach130$ - 0$ - 0
L2# of Layer 2 elementsBurn in, set up, installation, cutover, and testing of all new or relocated layer 2 devices in the network.Each new and reuse equipment being re-located; count includes fixed hardware configuration devices (counted as 1) and chassis/slot configuration (each card counts as 1, chassis does not count) devices.Each105$ - 0$ - 0
L3# of Layer 3 elementsBurn in, set up, installation, cutover, and testing of all new or relocated layer 3 devices in the network.Each new and reuse equipment being re-located; count includes fixed hardware configuration devices (counted as 1) and chassis/slot configuration (each card counts as 1, chassis does not count) devices.Each30$ - 0$ - 0
L4# of ATM ElementsBurn in, set up, installation, cutover, and testing of all new or relocated ATM devices in the network.Each new and reuse equipment being re-located; count includes fixed hardware configuration devices (counted as 1) and chassis/slot configuration (each card counts as 1, chassis does not count) devices.Each0$ - 0$ - 0
L5# of Sonet elementsBurn in, set up, installation, cutover, and testing of all new or relocated Sonet devices in the network.Each new and reuse equipment being re-located; count includes fixed hardware configuration devices (counted as 1) and chassis/slot configuration (each card counts as 1, chassis does not count) devices.Each3$ - 0$ - 0
L6# of chassis reused in placeMinor configuration and physical clean ups while not having to physically install, burn in, or make a full cutover of the device.Number of Layer 2, Layer 3 , ATM or Sonet devices reused in their current locationEach39$ - 0$ - 0
L7# of UPS installedBurn in, set up, installation, cutover, and testing of all new or relocated UPS devices in the network.Each new or relocated GFE UPSEach11$ - 0$ - 0
L8# of media convertors installedBurn in, set up, installation, cutover, and testing of all new or relocated media convertors in the network.Each new or relocated GFE Media convertorsEach45$ - 0$ - 0
L9# of NMS platforms installedThis item allows for the installation, configuration, stand up, and test of any computer platforms required by the Network Management solution. Each server or workstation installed by the contractor is counted as 1 in this model element.Each new or GFE reused platform that is configured and installed. If software is to be added to existing Network Management servers or workstations they are considered to require minimal effort and are not counted here.Each1$ - 0$ - 0
L10# of NMS Software packages installedInstallation, configuration, stand up, and test of any software element managers or other software products required by the Network Management solution.Each new Software Package is counted as 1Each1$ - 0$ - 0
L11# of buildings at GSUsIncludes cost of extra staging, transportation, setup time, and test time during installation. Any actions required to burn in, set up, install, cutover, and test the devices is covered the same as main base actions in the other model elements.Each building located at a GSU is counted as 1Each0$ - 0$ - 0
L12# of point to point wireless linksInstallation of any wireless link (Microwave, laser, etc), used in place of OSP fiber, either on base or off base to a GSU, requires additional set up, configuration, installation, cutover, and test efforts.Each point to point wireless connection is counted as 1Each0$ - 0$ - 0
L13# of user wireless linksInstallation & test of an access point used to connect individual users to the network switch. Includes the cost for any physical cabling required to connect the access point to the buildings network switch.Each wireless access point counts as 1Each0$ - 0$ - 0
L14# of users cutoverThe bulk of configuration effort for any network device should be considered under the installation element above for the device. This element should only consider the rare cases where specialized devices or uses of a port require additional configuration and testing.Each workstation, server, printer, network encryption device, wireless network access point, and any other device connected to a network port counts as 1. Users connected to network devices reused in place require a minimal effort to cutover and are not counted.Each11250$ - 0$ - 0
L15# of circuits configuredThis model element is meant to cover efforts required to configure a port on a SONET or ATM device to support a circuit requirement ( DS1, DS3, OC-3, OC-12 and/or others) being implemented at the time of ITS implementation.ITS will only configure a minimum of 1 port per card to test the card if no immediate requirements are identified or the number of ports required to migrate circuits identified for immediate transition. On systems requiring integration of the Ethernet over the ATM or SONET, each Ethernet interface on a SONET or ATM platform would be counted as 1.Each175$ - 0$ - 0

TOTAL PRICE $ - 0

NOTE: Contractor Unit cost must include total fully burdened cost (including profit) of labor (Direct & Indirect); installation and test equipment, shipping, and all other associated costs.

&12Network Labor

&7FA8771-09-R-0019-0006

Section J, Attachment 19

Page &P of &N&8

GIS

Task DescriptionMethod for Determining Quantity
(Government provided values)UnitGovernment Calculated QtyTask Element Proposed PriceTotal PriceRemarks
Locate surface featuresAll surface features encountered in the installation of new fiber. Includes new or existing manhole/handhole, pavement (each end) cut, building entry, etc. Each counts as one data point.Each data point2043$ - 0$ - 0
Collect sufficient data points to locate new fiber.Total length of ( new direct buried fiber + tonable innerduct + tracer wire)LF122645$ - 0$ - 0
TOTAL PRICE$ - 0
NOTE: KR unit costs includes all costs of labor and equipment required to make measurements
Surface Features = Sum of:Total = KD2ASum of DS1 to DS5
Total = KD16/KD1Existing Manhole & Duct System / Average distance between hand/man holes
Total =2*(DS39 +DS40)/40
Total = DS41
Data Points =DS16
DS21
DS22
DS23
DS24
DS37

&12GIS

&8FA8771-09-R-0019-0006

Section J, Attachment 19

Training

Task DescriptionMethod for Determining Quantity
(Government provided values)UnitGovernment Provided QtyTask Element Proposed PriceTotal PriceRemarks
Training provided by prime contractorAll costs associated with developing and implementing prime training requirements described in Training Plan Template.Each1$ - 0$ - 0
Training provided or purchased from OEM contratorAll costs associated with developing and implementing OEM requirements described in Training Plan Template.Each1$ - 0$ - 0
TOTAL PRICE$ - 0
NOTE:Do not include travel costs of government trainees.

&12Training

&8FA8771-09-R-0019-0006

Section J, Attachment 19

Post Install support Feature Task Description Method of Determining Quantity Unit Government Provided Qty Task Element Proposed Price Total Price Remarks

Leave Behind Support All costs associated with providing the post installation engineering support described in the TRN. Number of calander months. Month 2 $ - 0 $ - 0

&12Post Install Support

&8FA8771-09-R-0019-0006

Section J, Attachment 19

NW MAT LOM

DescriptionGov't Provided Price
NielsenA: Assume this is the price at which vendor sells item to offeror.Quantity
NielsenA: Quantity based on your solution to problemPrice
ITS Generic SONET( Large Chassis)
17 Slot Chassis$ 45,0000$0.00
DS1, Card 12 Ports$ 17,5000$0.00
DS3, Card 8 Ports$ 19,5500$0.00
OC12,Card 1 Port$ 8,9950$0.00
OC48 Card 1 Port$ 11,2000$0.00
OC-12/ Card 4 Ports$ 10,5000$0.00
OC-192 Line Card, 1 Port$ 8,0000$0.00
Timing, Communication, and Control Card$ 9,2690$0.00
24X7XNBD SVC, 1 year$ 12,0000$0.00
8X5XNBD SVC, 1 year$ 7,2000$0.00
ITS Generic SONET (Small Chassis)$0.00
SONET Edge switch 4 slot chassis$ 22,0000$0.00
Timing, Communication, and Control Card$ 8,5000$0.00
DS1,Card 14 Ports$ 17,5000$0.00
DS3 Card 12 Ports$ 19,5500$0.00
OC-3 Card 4-ports$ 10,5000$0.00
OC-12 Card 2 ports$ 9,5500$0.00
OC-48 Card 2 ports$ 10,8500$0.00
24X7XNBD SVC, 1 year$ 11,1500$0.00
8X5XNBD SVC, 1 year$ 7,0000$0.00
ITS Generic Ethernet (Large Chassis)$0.00
18 Slot Chassis layer 2/3$ 20,0500$0.00
Layer 3 Processor card$ 8,5500$0.00
Gigabit Ethernet Module,12-Ports (GBIC)$ 9,5000$0.00
1000BASE-LX/LH GBIC (singlemode or multimode)$ 2,2500$0.00
10/100 Auto Module, 48-Ports (RJ-45)$ 8,9500$0.00
Gigabit Ethernet Module, 6-Ports (GBIC)$ 8,5000$0.00
24X7XNBD SVC, 1 year$ 11,1500$0.00
8x5xNBD SVC, 1 year$ 7,0000$0.00
ITS Generic Ethernet (Medium Chassis)$0.00
6 Slot Chassis layer 2/3$ 13,5000$0.00
Layer 3 Processor card$ 7,5000$0.00
10/100 Auto Module, 48-Ports (RJ-45)$ 6,0000$0.00
GE Module 2 Ports GE(GBIC),32 Ports 10/100 (RJ-45)$ 7,5000$0.00
1000BASE-LX/LH (singlemode or multimode)$ 1,1500$0.00
10 Meg Ethernet, 24 ports RJ-45$ 9500$0.00
8x5xNBD SVC, 1 year$ 1,6500$0.00
24x7xNBD SVC, 1 year$ 5,5000$0.00
ITS Generic Ethernet (Small Switch)$0.00
12 Port Switch Layer 2 w/2 GigE GBIC ports$ 2,4000$0.00
24 Port Switch Layer 3 w/2 GigE GBIC ports$ 3,5500$0.00
24 Port Switch Layer 2 w/2 GigE GBIC ports$ 3,1000$0.00
48 Port Switch Layer3 w/2 GigE GBIC ports$ 7,5950$0.00
48 Port Switch Layer2 w/2 GigE GBIC ports$ 5,2500$0.00
8x5xNBD SVC, 1 year$ 3,2000$0.00
24x7xNBD SVC, 1 year$ 3,6000$0.00
ITS Generic Microwave Package with Tower and Antenna$0.00
Radio Set$ 72,5450$0.00
Tower/Antenna$ 22,2400$0.00
Ancillary Equipment$ 7,4690$0.00

Total Network Material $0.00

&12NW MAT LOM

Section J, Attachment 19

Consolidation Sheet

SS&IPB1$ - 0
B2$ - 0
B3$ - 0
TravelT1$ - 0
DSDS1$ - 0
DS2$ - 0
DS3$ - 0
DS4$ - 0
DS5$ - 0
DS6$ - 0
DS7$ - 0
DS8$ - 0
DS9$ - 0
DS10$ - 0
DS11$ - 0
DS12$ - 0
DS13$ - 0
DS14$ - 0
DS15$ - 0
DS16$ - 0
DS17$ - 0
DS18$ - 0
DS19$ - 0
DS20$ - 0
DS21$ - 0
DS22$ - 0
DS23$ - 0
DS24$ - 0
DS25$ - 0
DS26$ - 0
DS27$ - 0
DS28$ - 0
DS29$ - 0
DS30$ - 0
DS31$ - 0
DS32$ - 0
DS33$ - 0
DS34$ - 0
DS35$ - 0
DS36$ - 0
DS37$ - 0
DS38$ - 0
DS39$ - 0
DS40$ - 0
DS41$ - 0
DS42$ - 0
DS43$ - 0
DS44$ - 0
DS45$ - 0
DS46$ - 0
DS47$ - 0
DS48$ - 0
DS49$ - 0
DS50$ - 0
DS51$ - 0
DS52$ - 0
DS53$ - 0
DS54$ - 0
DS55$ - 0
DS56$ - 0
DS57$ - 0
DS58$ - 0
DS59$ - 0
DS60$ - 0
DS61$ - 0
DS62$ - 0
DS63$ - 0
DS64$ - 0
DS65$ - 0
DS66$ - 0
DS67$ - 0
DS68$ - 0
DS69$ - 0
DS70$ - 0
DS71$ - 0
DS72$ - 0
DS73$ - 0
DS74$ - 0
DS75$ - 0
DS76$ - 0
DS77$ - 0
DS78$ - 0
Network LaborL1$ - 0
L2$ - 0
L3$ - 0
L4$ - 0
L5$ - 0
L6$ - 0
L7$ - 0
L8$ - 0
L9$ - 0
L10$ - 0
L11$ - 0
L12$ - 0
L13$ - 0
L14$ - 0
L15$ - 0
GISLocate surface features$ - 0
Collect sufficient data points to locate new fiber.$ - 0
TrainingTraining provided by prime contractor$ - 0
Training provided or purchased from OEM contrator$ - 0
Post Install SupportLeave Behind Support$ - 0
NW MAT LOM17 Slot Chassis0
DS1, Card 12 Ports0
DS3, Card 8 Ports0
OC12,Card 1 Port0
OC48 Card 1 Port0
OC-12/ Card 4 Ports0
OC-192 Line Card, 1 Port0
Timing, Communication, and Control Card0
24X7XNBD SVC, 1 year0
8X5XNBD SVC, 1 year0
ITS Generic SONET (Small Chassis)0
SONET Edge switch 4 slot chassis0
Timing, Communication, and Control Card0
DS1,Card 14 Ports0
DS3 Card 12 Ports0
OC-3 Card 4-ports0
OC-12 Card 2 ports0
OC-48 Card 2 ports0
24X7XNBD SVC, 1 year0
8X5XNBD SVC, 1 year0
ITS Generic Ethernet (Large Chassis)0
18 Slot Chassis layer 2/30
Layer 3 Processor card0
Gigabit Ethernet Module,12-Ports (GBIC)0
1000BASE-LX/LH GBIC (singlemode or multimode)0
10/100 Auto Module, 48-Ports (RJ-45)0
Gigabit Ethernet Module, 6-Ports (GBIC)0
24X7XNBD SVC, 1 year0
8x5xNBD SVC, 1 year0
ITS Generic Ethernet (Medium Chassis)0
6 Slot Chassis layer 2/30
Layer 3 Processor card0
10/100 Auto Module, 48-Ports (RJ-45)0
GE Module 2 Ports GE(GBIC),32 Ports 10/100 (RJ-45)0
1000BASE-LX/LH (singlemode or multimode)0
10 Meg Ethernet, 24 ports RJ-450
8x5xNBD SVC, 1 year0
24x7xNBD SVC, 1 year0
ITS Generic Ethernet (Small Switch)0
12 Port Switch Layer 2 w/2 GigE GBIC ports0
24 Port Switch Layer 3 w/2 GigE GBIC ports0
24 Port Switch Layer 2 w/2 GigE GBIC ports0
48 Port Switch Layer3 w/2 GigE GBIC ports0
48 Port Switch Layer2 w/2 GigE GBIC ports0
8x5xNBD SVC, 1 year0
24x7xNBD SVC, 1 year0
ITS Generic Microwave Package with Tower and Antenna0
Radio Set0
Tower/Antenna0
Ancillary Equipment0

image1.png

File details come from the government source that posted it. Updated .