Atch 15_CITS Bldg List_NetOps SB.xls
XLS spreadsheet 60 KB Posted
- Solicitation number
- FA8771-09-R-0019
About this file
Atch 15_CITS Bldg List_NetOps SB. NOTE In response to the decommissioning of the Hanscom Electronic Request for Proposals Bulletin (HERBB) the following files pertaining to solicitation FA8771-09-R-0019 Network Operations (NetOps) and Infrastructure Small Business Companion are posted directly on FedBizOps. THIS IS NOT A NEW SOLICITATION AND ALL DOCUMENTS POSTED ARE REPRODUCTIONS OF DOCUMENTS PREVIOUSLY POSTED BUT NO LONGER AVAILABLE ON HERBB .
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUG 07
| Base | Priority # | Is CITS Work Required (X = Yes) | Bldg. No. Prefix | Bldg. No. | Bldg. No. Suffix | Bld. Name | Organization | Category (ITN, Core 1, 2, 3, 4 (non-Core)) | ITN (Bldg #) | 2nd ITN | Existing Fiber (strands) | Number of Cat V Drops | Network Switches | # of Users | Number of Comm Closets | Comments | ||||||||
| Exiting | Required | |||||||||||||||||||||||
| SM | MM | Existing | Required (New Drops Only) | Vendor | Model | Quantity | Uplink Speed (ie 10mb, 100mb, Gigabit) | Quantity | Uplink Speed (ie 10mb, 100mb, Gigabit) | Current | Projected | |||||||||||||
| Yokota | 1 | x | 500 | ITN #1 |
CBPO
Command Post 71 FTW
71 CS
71 MSSQ
71 SPS
CSC-DOM
CSC-MS Core 1 - 36 48 400 400 Cisco 2916M/3570 3548/7206 2950/7507
| 4000 | 15 | Gigabit | Gigabit | 256 | 300 | 5 | Requires replacement end of life Cisco 5000 series swith and non-IPv6 capable switches | |||
| Yokota | 2 | x | 672 | ITN #2 | ||||||
| Simulators | 71OG | Core 1 | 500 | 6 | 336 | 400 | Cisco |
Cisco Cisco Cisco 3548/2950
| 4006 | 11 | Gigabit | Gigabit | 336 | 450 | 5 | Requires replacement end of life Cisco 5000 series swith and non-IPv6 capable switches | |||||||||||||||||||
| Yokota | 3 | x | 292 | ITN #4 | 71CS | Core 1 | 500 | 7 | 84 | Cisco | 6509 | 1 | Gigabit | Gigabit | 0 | 2 | 1 | Requires replacement end of life Cisco 5000 series. | ||||||||
| Yokota | 4 | x | 810 | MME | ||||||||||||||||||||||
| Medical Clinic | 71MDG | Core 1 | 500 | 4 | 48 | 300 | 300 | Cisco | 6509 | 1 | Gigabit | 120 | 150 | 4 | ||||||||||||
| Yokota | 5 | x | 163 | CEBN Control Tower | 71 OSS | Core 1 | 500 | 5 | 18 | 8 | 10 | Cisco | 2924C-XL/3560 | 2 | 100/Gigabit | 8 | 10 | 2 | Replace current network switch with IPv6 capable switch. Also upgrade premise wiring with Cat 5e or better to meet CITS standards | |||||||
| Yokota | 6 | x | 155 | ITN 8 Base Ops/Weather | 71 OG | |||||||||||||||||||||
| 71 OSS | Core 1 | 500 | 12 | 24 | 72 | 80 | Cisco | Catalyst 5000 | 1 | Gigabit | 72 | 80 | 2 | Requires replacement end of life Cisco 5000 series. Also upgrade premise wiring with Cat 5e or better to meet CITS standards | ||||||||||||
| Yokota | 7 | x | 795 | CEBN RAPCON | 71 OSS/DOA | Core 1 | 672 | 12 | 24 | 45 | 50 | Cisco | 2924/3548/3560 | 3 | 100/Gigabit | 68 | 70 | 2 | Requires IPv6 capable switch with 100 mbps | |||||||
| Yokota | 8 | x | 751 | Receiver Site | ||||||||||||||||||||||
| Ground Comm Maintenance | 71 CS/SCMG | Core 1 | 292 | 12 | 18 | 12 | 20 | Bay | 3750 | 1 | Gigabit | 12 | 24 | 1 | Requires IPv6 capable switch with 100 mbps | |||||||||||
| Yokota | 9 | x | 690 | 71 OSS | 71 OSS | |||||||||||||||||||||
| 25 FTS/DO | Core 1 | 672 | 12 | 18 | 90 | 100 | Cisco | 6509 | 1 | Gigabit | 336 | 350 | 4 | Upgrade premise wiring with Cat 5e or better to meet CITS standards | ||||||||||||
| Yokota | 10 | x | 183 | 25th Flying Training Squadron | 25 FTS/CC/DO | Core 1 | 672 | 12 | 12 | 120 | 120 | Cisco | 6509 | 1 | Gigabit | 80 | 80 | 2 | Upgrade premise wiring with Cat 5e or better to meet CITS standards | |||||||
| Yokota | 11 | x | 541 | ITN 932nd Flying Training Squadron | 32 FTS | Core 1 | 672 | 12 | 12 | 120 | 120 | Cisco | 6509 | 1 | Gigabit | 80 | 100 | 1 | Upgrade premise wiring with Cat 5e or better to meet CITS standards | |||||||
| Yokota | 12 | x | 179 | ITN 118th Flying Training Squadron | 8 FTS/CC/DO | Core 1 | 672 | 12 | 12 | 110 | 120 | Cisco | 6509 | 1 | Gigabit | 80 | 80 | 2 | Upgrade premise wiring with Cat 5e or better to meet CITS standards | |||||||
| Yokota | 13 | x | 826 | Aerospace Physiological Trng | 71 MDG/SGT | Core 1 | 810 | 12 | 18 | 0 | 10 | Cisco | 3750 | 2 | Gigabit | 40 | 40 | 1 | Requires IPv6 capable switch with 100 mbps | |||||||
| Yokota | x | 180 | ITN 10 3rd Flying Training Sq | 3rd FTS | Core 1 | 500 | 12 | 0 | 80 | 2 | Cisco | 4506 | 1 | Gigabit | 1 | MILCON - BRAC Scheduled completion FY09 | ||||||||||
| Yokota | 14 | x | 527 | ITN 5 Security Forces | 71 SPS | Core 2 | 500 | 12 | 18 | 31 | 40 | Cisco | 3560 | 1 | Gigabit | 1 | Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||||
| Yokota | 15 | x | 140 | Fire Department | CSC-DOM/FC | Core 2 | 500 | 12 | 18 | 23 | 25 | SynOptic | 2814-04 | 2 | 10 | 2 | 100 Mbps | 16 | 20 | 1 | Requires 100Mbps building switch with IPv6 capable. Also upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||
| Yokota | 16 | x | 248 | 71 Communications Squadron | 71 LS |
LGTT
| CSC-DOM | Core 2 | 292 | 12 | 36 | 45 | 50 | Cisco | 3548/3750 | 3 | 1000 | 64 | 64 | 1 | Upgrade building premise wiring with Cat 5e or better to meet CITS standard | ||||||||||||
| Yokota | 18 | x | 128/129 | Aircraft Component Repair Shop | CSC-DAM | |||||||||||||||||||||
| CSC-STP | Core 2 | 292 | 12 | 18 | 16 | 20 | Cisco, Bay | 3548, 2924, 5500, 3550 | 4 | 100/Gigabit | 24 | 30 | 1 | Replace existing non IPv6 switch with IPv6 and 100mbps switch. Also upgrade building premise wiring with Cat 5e or better to meet CITS standard | ||||||||||||
| Yokota | 19 | x | 154 | Transient Alert Shop | CSC-DAM/SB | Core 2 | 500 | 6 | 12 | 2 | 2 | Bay | 24 Port Hub | 1 | 10 | 1 | 100 Mbps | 4 | 6 | 0 | Requires 100Mbps building switch with IPv6 capable. Also upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||
| Yokota | 20 | x | 170 | Aircraft Maint QAE | CSC-DAM/SB | Core 2 | 500 | 4 | 18 | 32 | 35 | Cisco | 2924C-XL | 2 | 100 | 32 | 50 | 1 | Replace current network switch with IPv6 capable switch. Also upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||
| Yokota | 21 | x | 171 | Aircrew Life Support | 8 FTS/DOOZ | Core 2 | 500 | 4 | 18 | 16 | 20 | Cisco | 3548 | 1 | Gigabit | 16 | 20 | 2 | Replace current network switch with IPv6 capable switch. Also upgrade premise wiring with Cat 5e or better to meet CITS standards | |||||||
| Yokota | 22 | x | 187 | Engine Maintenance J-69 | CSC-DAM/STP | Core 2 | 672 | 4 | 18 | 16 | 20 | Cisco | 3550 | 1 | Gigabit | 1 | 100 Mbps | 24 | 30 | 2 | Replace current network switch with IPv6 capable switch. Also upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||
| Yokota | x | 0070 | Main Gate | Core 2 | 500 | 4 | 0 | 24 | 24 | Cisco | 3750 | 1 | Gigabit | 1 | ||||||||||||
| Yokota | 23 | x | 192 | Aircraft Corrosion Control | CSC-DAM/FFM | Core 2 | 672 | 4 | 18 | 2 | 4 | Bay | 24 Port Hub | 1 | 10 | 1 | 100 Mbps | 2 | 6 | 1 | Replace current network switch with IPv6 capable switch. Also upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||
| Yokota | 24 | x | 199 | Aircraft Maintenance Hanger T-1 shop | Core 2 | 672 | 4 | 36 | 60 | 0 | Cisco | 3550-48 | 2 | Gigabit | 20 | 30 | 1 | |||||||||
| Yokota | 25 | x | 244 | Procurement | ||||||||||||||||||||||
| Service Store | CSC-STP | Core 2 | 292 | 0 | 12 | 60 | 60 | Cisco | 2924, 16 Port Hub | 1 | 10/100 | 10 | 14 | 1 | Requires single mode fiber. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||||||
| Yokota | x | 200 | Logistics Squadron | 71 LGS | Core 2 | 292 | 12 | 0 | 400 | 400 | Cisco | 4506/3750 | 3 | Gigabit | 3 | |||||||||||
| Yokota | 26 | x | 202 | Main Gate | 71 SPS | Core 3 | 292 | 0 | 0 | 0 | 10 | N/A | N/A | 4 | 4 | 0 | Requires 100 mbps network switch and single fiber cable. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||||
| Yokota | 27 | x | 261 | ITN 6 West Gate | 71 SFS | Core 3 | 292 | 0 | 0 | 0 | 10 | N/A | N/A | 4 | 6 | 0 | Requires single mode fiber and IPv6 capable building switch | |||||||||
| Yokota | 29 | x | 288 | CEBN Civil Engineering Complex | CSC-DOM | Core 3 | 292 | 12 | 36 | 90 | 100 | Cisco | 6509 | 1 | Gigabit | Gigabit | 100 | 100 | 1 | Requires replacement end of life Cisco 5000 series. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | ||||||
| Yokota | 30 | x | 246 | Transportation | 71 LS/LGT | Core 3 | 292 | 12 | 12 | 40 | 40 | Cisco | Catalyst 3000, 24 Port Hub | 4 | 10/100 | 24 | 24 | 1 | Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||
| Yokota | 31 | x | 455 | CEBN Base Safety Office | ||||||||||||||||||||||
| OSI | 71 LS | Core 3 | 500 | 36 | 18 | 32 | 35 | Cisco/Bay | 3550/24 Port Hub | 3 | 10/Gigabit | 1 | 100 Mbps | 20 | 20 | 2 | Requires IPv6 capable switch with 100 mbps. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||||
| Yokota | 32 | x | 293 | Vehicle Maintenance | Core 3 | 292 | 12 | 18 | 17 | 20 | Bay | 12 Port Hub, 8 Port Hub | 1 | 10 | 1 | 100 Mbps | 30 | 30 | 1 | Requires IPv6 capable switch with 100 mbps. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | ||||||
| Yokota | 33 | x | 116 | Fuels Management | CSC-STP/FM | Core 3 | 292 | 12 | 18 | 12 | 12 | Bay/Synop | Bay 12 | 1 | 10 | 1 | 100 Mbps | 12 | 12 | 1 | Requires IPv6 capable switch with 100 mbps. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||
| Yokota | 34 | x | 109 | Petrol Ops Center | CSC-STP | Core 3 | 292 | 0 | 0 | 0 | 2 | Not Available | 1 | 100 Mbps | 1 | 2 | 0 | Requires single mode fiber and IPv6 capable building switch. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | ||||||||
| Yokota | 36 | x | 126 | Vehicle Fuels/Maintenance | CSC-STP/ST | Core 3 | 292 | 12 | 12 | 1 | 1 | FO XVR | FO Xvr | 1 | 10 | 1 | 100 Mbps | 2 | 2 | 1 | Requires 100Mbps building switch with IPv6 capable. Also upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||
| Yokota | 37 | x | 127 | Aircraft Maintenance T-38 Shop | CSC-DAM | Core 3 | 292 | 0 | 0 | 0 | 2 | N/A | N/A | 2 | 4 | 0 | Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||||
| Yokota | 38 | x | 129 | Aero Repair Hangar | CSC-DAM | Core 3 | 292 | 12 | 18 | 10 | 20 | See 128 | 10 | 20 | 0 | Replace existing non IPv6 switch with IPv6 and 100mbps switch. Also upgrade building premise wiring with Cat 5e or better to meet CITS standard | ||||||||||
| Yokota | 39 | x | 130 | Aircraft X-Ray/NDI Laboratory | CSC-DAM/FFM | Core 3 | 292 | 12 | 18 | 6 | 6 | Nortel | Bay 12 | 1 | 10 | 1 | 100 Mbps | 12 | 12 | 1 | Requires 100Mbps building switch with IPv6 capable. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||
| Yokota | 40 | x | 141 | Aircraft Maintenance T-38 Shop | CSC-DAM | |||||||||||||||||||||
| CSC-STP | Core 3 | 292 | 12 | 24 | 68 | 70 | Cisco | 4000/3550 | 2 | 1000 | 68 | 70 | 3 | |||||||||||||
| Yokota | 49 | x | 409 | CEBN Vehicle Fuel Station | AAFES/SSV | Core 3 | 500 | 0 | 6 | 0 | 2 | Not Available | Not Available | 2 | 2 | 0 | Requires single mode fiber and IPv6 capable building switch. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||||
| Yokota | 52 | x | 750 | Military Working Dogs | 71 SPS/SPTK | Core 3 | 292 | 6 | 6 | 2 | 4 | Bay | 16 Port Hub | 1 | 10 | 1 | 100 Mbps | 2 | 2 | 1 | Requires IPv6 capable switch with 100 mbps. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||
| Yokota | 53 | x | 901 | Small Arms | 71 SPS/CATM | Core 3 | 500 | 12 | 12 | 4 | 4 | Bay | 16 Port Hub | 1 | 10 | 1 | 100 Mbps | 2 | 6 | 1 | Requires IPv6 capable switch with 100 mbps | |||||
| Yokota | 54 | x | 906 | CEBN Munitions Inspection Facility | 71 MSG | Core 3 | 500 | 0 | 0 | 0 | 4 | Cisco | 3560 | Gigabit | 2 | 6 | 0 | Requires single mode fiber and IPv6 capable building switch | ||||||||
| Yokota | 55 | x | 542 | CEBN Parachute and survival equipment Shop | CSC-DAM/DAR | |||||||||||||||||||||
| CSC-DAM/FFM | Core 3 | 500 | 12 | 18 | 5 | 6 | Cisco | 3550 | 1 | Gigabit | 1 | 100 Mbps | 40 | 40 | 1 | Requires IPv6 capable switch with 100 mbps. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | ||||||||||
| Yokota | 56 | x | 122 | T-1 Maint and Flight Shack | 71 OG/OSS | Core 3 | 292 | 12 | 0 | 3 | 0 | Cisco | 3550 | 1 | 1000 | 10 | 10 | 1 | ||||||||
| Yokota | 57 | x | 146 | T-1 Maint and Flight Shack | 71 OG/OSS | Core 3 | 292 | 12 | 12 | 0 | 10 | Bay | 24 Port hub | 10 | 6 | 6 | 1 | Requires 100Mbps building switch with IPv6 capable | ||||||||
| Yokota | 58 | x | 173 | T-1 Maint and Flight Shack | 71 OG/OSS | Core 3 | 500 | 12 | 0 | 3 | 3 | Cisco | 3550 | 1 | 1000 | 6 | 10 | 1 | ||||||||
| Yokota | 59 | x | 196 | T-1 Maint and Flight Shack | 71 OG/OSS | core 3 | 500 | 12 | 0 | 3 | 0 | Cisco | 3550 | 1 | 1000 | 6 | 10 | 1 | Requires 100mbps building switch. This building share the fiber with building 128.Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||
| Yokota | 70 | fiber only | 1050 | Localizer 35C | 71 OG/OSS | Core 3 | 500 | 0 | 0 | 0 | 0 | 1 | ||||||||||||||
| Yokota | 71 | fiber only | 1051 | Glideslope 17 | 71 OG/OSS | Core 3 | 500 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||
| Yokota | 72 | fiber only | 1060 | AN/GMQ 13 Ceilometer | 71 OG/OSS | Core 3 | 500 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||
| Yokota | 73 | fiber only | 1070 | Runway Visual Range | 71 OG/OSS | Core 3 | 500 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||
| Yokota | x | 122 | Flight Line Shack | CSC-MA | Core 3 | 292 | 12 | 0 | 24 | 24 | Cisco | 3550 | 1 | Gigabit | 1 | |||||||||||
| Yokota | x | 0074 | Industrial Gate | Core 3 | 292 | 12 | 0 | 24 | 24 | Cisco | 3750 | 1 | Gigabit | 1 | ||||||||||||
| Yokota | x | 220 | Veternarian Clinic | 71 MDG | Core 3 | 810 | 6 | 0 | 24 | 24 | Cisco | 3750 | 1 | Gigabit | 1 | |||||||||||
| Yokota | x | 1040 | RADAR Facility | 71 CS | Core 3 | 500 | 0 | 0 | 4 | 4 | 6 | 0 | Requires single mode fiber and IPv6 capable building switch | |||||||||||||
| Yokota | x | 903 | CEBN Firing Range | 72 SPS | Core 3 | 500 | 0 | 0 | 0 | 2 | Not Available | 0 | ||||||||||||||
| Yokota | x | 312 | Wellness Center | 71 MDG | Core 3 | 292 | 12 | 12 | 8 | 10 | Bay | 16 port hub | 2 | 10 | 8 | 1 | ||||||||||
| Yokota | x | 314 | Training Office Library |
Education Center
| Family Support | CSC-PS/CL | Core 3 | 292 | 12 | 18 | 30 | 40 | Cisco, Bay | Catalyst 3000, 24 Port Hub | 4 | 100 | 24 | 1 | The training office offers testing for the Career development, Testing for CLEP, and testing and enrollment for Professional Military Education. | ||||||||||||
| Yokota | x | 250 | Hazardous Waste Facility | CSC-DOM | Core 3 | 292 | 0 | 0 | 2 | 2 | Pairgain | Campus T1 | 1 | 1.544 | 1 | |||||||||||
| Yokota | x | 811 | Ambulance | 71 MDG | Core 3 | 500 | 0 | 0 | 0 | 10 | Not Available | 0 | Requires replacement end of life Cisco 5000 series swith and non-IPv6 capable switches | |||||||||||||
| Yokota | x | 824 | Physiological Training | 71 MDG | Core 3 | 500 | 0 | 0 | 0 | 10 | Not Available | 0 | ||||||||||||||
| Yokota | x | 193 | Industrial Pretreatment Waste Facility | CSC-DAM | Core 3 | 672 | 12 | 18 | 0 | 0 | 0 | |||||||||||||||
| Yokota | x | 113 | Refueler Vehicle Maintenance | Core 3 | 292 | 6 | 6 | 3 | 3 | Bay/Synop | 16 Port Hub | 1 | 10 | 2 | 2 | 1 | ||||||||||
| Yokota | x | 258 | Waste Treatment | Core 3 | 0 | 0 | 0 | 0 | N/A | N/A | 1 | Fiber for EMCS needed | ||||||||||||||
| Yokota | x | 907 | Munitions Storage | CSC-STP | Core 3 | 500 | 0 | 0 | 6 | 6 | 0 | Requires single mode fiber and IPv6 capable building switch | ||||||||||||||
| Yokota | x | 814 | MDG Admin | 71 MDG ADMIN | Core 3 | 810 | 6 | 0 | 24 | 24 | Cisco | 3750 | 2 | Gigabit | 1 | |||||||||||
| MILCON | Yokota | 247 | Life Skills | Core 4 | 12 | 36 | 0 | 0 | N/A | N/A | 0 | MILCON in progress to replace. New Building Number 816 | ||||||||||||||
| MILCON | Yokota | x | 816 | MDG Admin | 71 MDG Mental Health | Core 3 | 810 | 6 | 0 | 24 | 24 | Cisco | 3750 | 2 | Gigabit | 1 | MILCON Currently in Construction | |||||||||
| MILCON | Yokota | x | 255 | Entomology | CSC-DOM | Core 3 | 292 | 12 | 18 | 1 | 4 | FO XVR | FO Xvr | 1 | 10 | 1 | MILCON Project projected FY09 | |||||||||
| MILCON | Yokota | x | 208 | Dog Kennel | 71 SFS | Core 3 | 292 | 6 | 0 | 24 | 24 | Cisco | 3750 | 1 | Gigabit | 1 | ||||||||||
| MILCON | Yokota | x | 0072 | Visitor Center | Core 3 | 500 | 12 | 0 | 24 | 80 | Cisco | 3750 | 1 | Gigabit | 1 | |||||||||||
| Yokota | 505 | Base Chapel | 71 FTW/HC | Core 4 | 500 | 12 | 18 | 12 | 12 | Bay | 24 Port Hub | 1 | 12 | 12 | 1 | Requires IPv6 capable switch with 100 mbps. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | ||||||||||
| Yokota | 714 | Main Lodging Office | 606 | Core 4 | 500 | 12 | 18 | 0 | 4 | Bay | 16 Port Hub | 2 | 10 | 1 | 100 Mbps | 4 | 6 | 1 | Requires IPv6 capable switch with 100 mbps. Upgrade building premise wiring with Cat 5e or better to meet CITS standard | |||||||
| Yokota | 50 | Hush House | CSC-DAM | Core 4 | 672 | 0 | 0 | 0 | 0 | Not Available | 0 | 0 | 1 | |||||||||||||
| Yokota | 119 | Aircraft Corrosion Control | CSC-DAM | Core 4 | 292 | 0 | 0 | 0 | 0 | N/A | N/A | 0 |
&CCITS ITS SAMPLE TASK ORDER BUILDING LIST
&CSection J, Atch 15
FA8771-09-R-0018
Page &P of 5
Instructions
| Please provide the data requested for each building on base In Spreadsheet TAB "BaseData". | |||
| STEP | Column | How to fill Spreadsheet TAB "BaseData" | |
| 1 | A: Base Name | Fill in with Base Name | |
| 2 | B: Bldg Priority | Number from 1 to n | |
| 3 | C: CITS | Place an "X" in this column if the building requires CITS work. | |
| 4 | D: Bldg # Prefix | Fill in with any Alpha or Alpha Numeric Characters proceeding the Numeric Bldg Number. | |
| 5 | E: Bldg # | List all Core I - Core III and Non Core (Core 4) buildings on base (Numeric Number Only) | |
| 6 | F: Bldg # Suffix | Fill in with any Alpha or Alpha Numeric Characters following the Numeric Bldg Number | |
| Note: | If the End Building Node is not positioned to allow runs of CAT 5(E) of < 100 meters then regionalize the building into regions A, B, etc around a communications closet that will service the region. Each of these regions should be considered a separate EBN for the purpose of this list and reported as separate buildings in this list. | ||
| 7 | G: Bldg Name | Facility Description | |
| 8 | H: Organization | Organizational Unit(s) in building | |
| 9 | I: Category | If the building is an ITN then place "ITN" in this column. If not an ITN then place the core category number in this column. 1, 2, 3, or 4 | |
| 10 | J: ITN (Bldg #) | If the building is an ITN provide the primary ITN building number this building has or is planned to have fiber connectivity to. If not an ITN, place the ITN building number this building will have fiber connectivity to. | |
| 11 | K: 2nd ITN | If the building is an ITN provide the 2nd or additional ITN building numbers this building has or is planned to have fiber connectivity to. If not an ITN, place the 2nd ITN building number this building will have fiber connectivity to. | |
| 12 | L: Available Fiber (strands) SM | Provide the number of Single Mode Fiber Optic Strands to this building. | |
| 13 | M: Available Fiber (strands) MM | Provide the number of Multi Mode Fiber Optic Strands to this building. | |
| 14 | N: Current Network Equipment | Insert network equipment nomenclature (ie Cisco 2924) | |
| 15 | O: Current Network Uplink | Insert Speed of current device (ie 100mbs) | |
| 16 | P: # of Users Current | Number of Current Computer and Telephone Users. One desk top is one User. | |
| 17 | Q: # of Users Projected | Projected number of Computer and Telephone Users in the future. One desktop is one User. | |
| 18 | R: Number of Comm Closets. | Provide the number of communications closets in the building. A comm closet is defined as a location that hubs, switches and routers are located. Example: A 4 port hub sitting on a filing cabinet would be considered a comm closet. | |
| 19 | S: # of Cat 5 Drops required | List the number of user drops that need to be upgraded to CAT 5(E) cable | |
| 20 | T: POC | Bldg Custodians Name | |
| 21 | U: DSN # | Bldg Custodians DSN # |
&CSection J, Atch 15
FA8771-09-R-0018
&P of 5
File details come from the government source that posted it. Updated .