This solicitation requests proposals for grounds maintenance and snow removal services at an Air Force research site in Rome, New York. The contractor shall provide all personnel, equipment, tools, and other items necessary to perform grounds maintenance and ensure parking lots and walkways are cleared of snow according to specifications. Services shall be provided on a firm-fixed price basis for an initial period of one year with four optional one-year extensions. Proposals are due by 3PM on an unspecified date and must include pricing using the provided bid schedule as well as past performance information for relevant contracts demonstrating the ability to perform the work. The solicitation is set aside for small businesses with average annual receipts less than $8 million. The award will be made to the responsible offeror with a substantial confidence past performance rating and a reasonable price, or otherwise to the offeror with the best value determined by an integrated assessment of price and satisfactory confidence past performance.

View the file

Other files for this federal contract opportunity

Other files attached to Grounds Maintenance and Snow Removal, newest first.
File Type Posted
20r31 a15 Attachment 3 Bid Schedule 10_8.pdf PDF
20r31 a15 Attachment 6 Wage Determination.pdf PDF
20r31 a15 Attachment 5 RRS Form 31 Request for Visit Authorization.pdf PDF
20r31 a15 Attachment 2 Drawings.pdf PDF
20r31 a15 Attachment 1 PWS 9_9.doc DOC document
20r31 a15 Attachment 4 Reps and Certs 9_23.docx DOCX document
20r31 a15 Attachment 3 Bid Schedule.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grounds Maintenance and Snow Removal

FA875120R0031

Q&A—08 October 2020

Q1. Will there be any implications with this contract when the new perimeter fence is completed?

A1. The anticipated completion date for the fence is August 2021. Once the fence is completed, if any areas within the contract are affected, a contract modification will be issued.

Q2. Are any parking lots closed? Will any parking lots close during fence construction?

A2. Due to COVID-19, some parking lots have currently been restricted for use by employees. However, all parking lots will need to be cleared of snow. During fence construction, if any changes are required to this, a modification will be issued.

Q3. Will the yellow barriers be removed?

A3. If the yellow barriers are still in use at the time of snow removal, the contractor will be required to move them to complete the snow removal of all lots.

Q4. Can salt be left onsite?

A4. Yes, you will be told where the preferred placement will be. Any area where salt will be left must be approved by the Government.

Q5. Can a storage shed be built onsite for salt?

A5. Yes, it would need to be approved prior to installation. Environmental will also need to approve how the salt is contained, what will be placed underneath, etc. Specifications will be provided.

Q6. Will staging areas have electrical output?

A6. Yes.

Q7. Is someone required on site at all times during snowfall?

A7. A physical presence is not required on site 24/7. However, the site is required to be cleared according to the specifications listed in the PWS. Between 6am and 6pm it is expected the site be completely cleared.

Q8. What are the expectations for spring clean up?

A8. One clean up should occur at the end of snow season. Parking lots should be swept and any damages, such as grass, shall be repaired.

Q9. Are there any mulch or flowers required?

A9. No.

Q10. Is the military on site on the weekends?

A10. Yes, there are military personnel on site on the weekends, as well as Security and Police forces. The site will need to be cleared on weekends.

Q11. What sidewalks are included in snow removal?

A11. Refer to the site map contained within Attachment 2- Drawings.

Q12. Can aspects of the contract be subcontracted?

A12. Refer to clause 52.219-14, Limitations on Subcontracting (MAR 2020) (DEVIATION 2020-O0008) for further guidance.