Attachment_2-Statement_of_Work_(SOW).pdf

PDF 14 KB Posted

Attached to
DHRF Wright Line Furniture Federal contract opportunity
Solicitation number
FA8751-18-Q-0497
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to DHRF Wright Line Furniture, newest first.
File Type Posted
Attachment_3-Wright_Line_Drawings.pdf PDF
Attachment_4_-__Sole_Source_(Wrightline).pdf PDF
Attachment_1-_List_of_Materials.pdf PDF
Attachment_5-_Rep_&_Certs.pdf PDF
Attachment_6-_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

MODIFY LAB FURNITURE, IN SUITE C6-C

BUILDING 3

AT

AIR FORCE RESEARCH LABORATORY- ROME, NY

27 July 2018

1.01 SCOPE

A. The scope of this effort consists of furnishing all design services, delivery and labor, equipment, devices, and materials, and to perform all work required to Reconfigure existing Eaton-Wrightline Technical Lab furniture, and provide new components as required for SUITE C6-C, located in Building 3 at the Air Force Research Laboratory.

1.02 PRINCIPAL FEATURES:

A. The work to be performed involves the following principal features:

1. Reconfiguring/install (6) workstations in the Suite C6-C Lab area (See project Drawings)

2. Perform site visits and document accurate field measurements prior to ordering all lab furniture.

3. After AFRL/RIOC approval, order all new parts (see attached Parts List) and deliver new parts and materials to work area site.

4. Install complete furniture system, utilizing new and existing parts and all accessories as shown on plans. NOTE: Remove all packing materials and boxes from the job site.

5. Move existing product in Bldg. 2, warehouse, to installation site to be installed with new product.

6. Building 3 is a one story building, furniture will all be delivered and installed on the same level. There is a loading dock with dock leveler.

7. Building 2 is a one story building, loading zone available, loading dock available upon request.

END OF SOW