17B0002_-_Attachment_2_-_Addendum_1_-_ULDF_15-0307.pdf
PDF 271 KB Posted
- Attached to
- Expand Controllable Contested Environment (CCE) Federal contract opportunity
- Solicitation number
- FA8751-17-B-0002
About this file
Attachment 2 - Addendum 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 17B0002_-_Attachment_5_-_Site_Visit_Request.pdf | ||
| 17B0002_-_Attachment_1_-_Project_Manual_ULDF_15-0307.pdf | ||
| 17B0002_-_Attachment_4_-_Wage_Determination.pdf | ||
| FA875117B0002.pdf | ||
| 17B0002_-_Attachment_3_-_Project_Drawings_-_ULDF_15-0307.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SERVICES TO EXPAND CCE, STOCKBRIDGE – P1
PAD 30A
PREPARED BY AFRL/RIOC
AIR FORCE RESEARCH LABORATORY
ROME RESEARCH SITE
ROME, NEW YORK
PROJECT NR: ULDF 15-0307P1 A DATED: 12 April 2017
ADDENDUM 1
1. The Following changes have been made to this project.
- Specifications:
a. Section 01 10 01, 1.1 – Scope: The work covered under this Contract consists of furnishing all labor, equipment, devices, and materials and performing all work required to perform the extension of existing site access road and power/communications system for Pad 30A at the Stockbridge Site in accordance with these technical specifications and applicable drawings.
b. Section 01 10 01, 1.4 – Principal Features:
A. The work to be performed includes the following principal features:
1. Infrastructure upgrades consisting of power and communications infrastructure distribution to 1 location.
2. 1 new pad location typically consisting of 20KVA power load and 20 Amp convenience outlet.
3. Roads which connect the existing road system to the 1 new pad location.
c. Section 01 24 00, List of Drawing Sheets:
Drawings No. C-4 & C-5 are excluded due to work not being included in the contract.
- Drawings Changes were made to the Drawings to show that all other work besides the work for Pad 30A and the Pad 30A access road are Not In Contract (NIC). Drawings No. C-4 & C-5 have been omitted.
File details come from the government source that posted it. Updated .