17B0002_-_Attachment_2_-_Addendum_1_-_ULDF_15-0307.pdf

PDF 271 KB Posted

Attached to
Expand Controllable Contested Environment (CCE) Federal contract opportunity
Solicitation number
FA8751-17-B-0002
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Attachment 2 - Addendum 1

View the file

Other files for this federal contract opportunity

Other files attached to Expand Controllable Contested Environment (CCE), newest first.
File Type Posted
17B0002_-_Attachment_5_-_Site_Visit_Request.pdf PDF
17B0002_-_Attachment_1_-_Project_Manual_ULDF_15-0307.pdf PDF
17B0002_-_Attachment_4_-_Wage_Determination.pdf PDF
FA875117B0002.pdf PDF
17B0002_-_Attachment_3_-_Project_Drawings_-_ULDF_15-0307.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICES TO EXPAND CCE, STOCKBRIDGE – P1

PAD 30A

PREPARED BY AFRL/RIOC

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NEW YORK

PROJECT NR: ULDF 15-0307P1 A DATED: 12 April 2017

ADDENDUM 1

1. The Following changes have been made to this project.

- Specifications:

a. Section 01 10 01, 1.1 – Scope: The work covered under this Contract consists of furnishing all labor, equipment, devices, and materials and performing all work required to perform the extension of existing site access road and power/communications system for Pad 30A at the Stockbridge Site in accordance with these technical specifications and applicable drawings.

b. Section 01 10 01, 1.4 – Principal Features:

A. The work to be performed includes the following principal features:

1. Infrastructure upgrades consisting of power and communications infrastructure distribution to 1 location.

2. 1 new pad location typically consisting of 20KVA power load and 20 Amp convenience outlet.

3. Roads which connect the existing road system to the 1 new pad location.

c. Section 01 24 00, List of Drawing Sheets:

Drawings No. C-4 & C-5 are excluded due to work not being included in the contract.

- Drawings Changes were made to the Drawings to show that all other work besides the work for Pad 30A and the Pad 30A access road are Not In Contract (NIC). Drawings No. C-4 & C-5 have been omitted.