Afghan_BT_LL_ICS_SSS_-_final-_20141301.pdf
PDF 291 KB Posted
- Attached to
- Afghan BT/LL Interim Contractor Support
- Solicitation number
- FA8617-14-C-6195
About this file
FA8617-14-C-6195 Amendment 1 Sources Sought Synopsis
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Afghan_BT_LL_ICS_SSS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Afghanistan Basic Trainer / Light Lift ICS program
Solicitation Number: FA8617-14-C-6195 Amendment 1
Agency: Department of the Air Force
Office: Air Force Materiel Command
Location: Wright Patterson Air Force Base
NACIS code: 488190, Other Support Activities for Air Transportation, Size Standard $30.0M
Posted Date: Response Date:
December 24, 2013 January 30, 2014 4:00 PM Eastern
Archiving Policy: Archive Date:
Automatic, 21 days after response date February 14, 2014
Description:
A. The Department of the Air Force, Air Force Material Command, Training Aircraft Division, International Support Branch, Wright Patterson Air Force Base, intends to award Firm Fixed Price 6 month base contract, for Interim Contractor Support (ICS) in support of the Afghanistan Basic Trainer
Light Lift (BT/LL) Program for the Cessna C-208B aircraft (a/c), Cessna T-182T a/c and Aircraft
Training Devices (ATDs). This contract has a base period of performance of 6 months. In order to provide a seamless continuation of operations, requirements must be met in their entirety and be in place in Afghanistan at the specified bases and fully operational to complete all contractual obligations by 1
August 2014. Interested parties that feel they can provide the required Interim Contractor Support may respond by submitting their capability statement via email. Written responses to this synopsis shall contain sufficient documentation to establish a bona fide capability to fulfill this requirement. The intent of this notice is not a request for competitive proposals. Please submit all responses related to this notice, in writing, via email to wendy.hess@us.af.mil or joseph.plessinger@us.af.mil by 4:00 PM (EST)
30 January 2014. Information received as a result of this notice will be considered solely for the purpose of determining the appropriate acquisition decision for the procurement. A determination by the Air
Force not to open the requirement to open competition, based on response to this notice, is solely within the discretion of the Air Force. This notice does not constitute a solicitation for offers. This is not a request for proposal and the Government does not intend to pay for information received.
B. The US government requirement is to provide support and training through the end of the US NATO combat mission which concludes 31 December 2014 without a signed Status of Forces Agreement
(SoFA). In the event a SoFA agreement is signed and upon continuation of the US mission, the information will be disseminated via FedBizOps and requirements will be made available to industry for competition.
C. This ICS bridge contract will consist of the following Period of Performance (PoP): 1 six month base with 2 six month options:
a. Base: 1 August 2014 – 31 January 2015
b. Option 1: 1 February 2015 – 31 July 2015
c. Option 2: 1 August 2015 – 31 January 2016 mailto:wendy.hess@us.af.mil mailto:joseph.plessinger@us.af.mil
D. Interim Contractor Support shall commence on 1 August 2014 with the base requirement lasting 6 months, expiring 31 December 2014. Options will only be exercised if needed. FAR 52.217-8, Option to
Extend Services, will NOT be included. The contractor must have all applicable personnel, spares, and any additional items necessary to perform the requirements stated below at the locations listed
(Shindand, Kabul and Kandahar Air Bases) by or before 1 August 2014. The contractor shall provide a seamless continuation of services whereby all requirements must be in place in Afghanistan at the specified bases and operational at full capacity to complete all contractual obligations at 100% efficiency.
E. Due to the immediacy of the need whereby delays are not acceptable and the exigency generated by the known requirement expiring 31 December 2014, it is necessary for the contractor to meet all contractual obligations and sustain a continuity of operations. All obligations must be met and fully operational by 1
Aug 2014 without exception to include, but not limited to:
a. Contractor shall establish full Interim Contractor Support as a Main Operating Base at each location listed and be fully operational by 1 Aug 2014
b. Contractor shall maintain all aircraft and ATDs In Accordance With (IAW) Original Equipment
Manufacturer and USAF airworthiness requirements for all scheduled and unscheduled maintenance functions alike
c. Contractor shall provide all maintenance personnel, equipment, software, spares, Ground
Support Equipment, special tools, and equipment to meet a fleet-wide Fully Mission Capable
(FMC) rate of eighty percent (80%) and a/c utilization rates.
d. Contractor shall have a flight line operation responsible for a/c servicing, maintenance, pre-flight and post flight inspection, cleaning, ground handling, launch and recovery of each a/c IAW USG
FAA and AAF approved technical manuals and IAW local base procedures.
e. Contractor shall meet all contractor related Standard Operating Procedures (SOPs) applicable for each base. SOPs can be found at the following link: http://afcent.af.mil. For example, the
Kandahar SOP is http://www.afcent.af.mil/shared/media/document/AFD-130502-007.pdf
f. Contractor shall be responsible for changing out current and future C-208B a/c configurations including passenger, cargo and Medevac.
g. Contractor shall provide fully qualified personnel to maintain and repair a/c, engines, ATDs, and supply support at each base.
h. Contractor shall provide fully qualified personnel responsible for maintenance training, OJT and apprenticeship including interpreters at each base.
i. Contractor shall support all Over and Above work IAW DFARS 252.217-7028 and as directed and approved by AFLCMC/WLZI PCO.
j. Contractor shall staff each performance location to levels sufficient to achieve all maintenance and training operations.
k. Contractor shall include an initial 6 month lay-in of spares and bench stock related items; must be FAA certified from a Cessna certified manufacturer for a/c and ATDs
l. Contractor shall implement and maintain a Technical Library to support training, maintenance and flight operations including updates and have available at each performance location.
m. Contractor shall provide structured skill level training, OJT and apprenticeship for the AAF IAW
NATO Air Training Command- Afghanistan/438 th
Air Expeditionary Wing Operating
Instructions
n. Contractor shall submit a structured training plan IAW MTLs and 438 th
AEW OI no later than 31
May 2014 addressing all areas of training and implementation.
o. Contractor shall have all training aids, course materials and all necessary items to conduct training IAW with MTLs available for dissemination to students.
http://afcent.af.mil/ http://www.afcent.af.mil/shared/media/document/AFD-130502-007.pdf
p. Contractor shall have sufficient training staff to support multiple classes/levels at the 3 locations:
Shindand, Kandahar and Kabul air bases. This staff shall be separate from the mechanics previously identified.
q. Contractor shall provide structured skill level training, OJT and apprenticeship programs for
AAF personnel on a/c maintenance, and supply chain management IAW MTL, and 438 th
AEW
OI.
r. Contractor shall maintain training records IAW the 438 AEW OI per student, including certifications IAW MTLs; certificates shall also be issued to students and will be specified by
PCO.
Additional Program Specifications:
Contractor Maintenance Support:
Sustain and prepare for transition of the Afghan BT/LL program (T-182T and C-208B fleet and Aircraft
Training Devices (ATDs)) by providing responsive logistics, maintenance, and training for the Afghan
Air Force (AAF). This requirement supports continued aircraft flight operations, maintenance, supply chain management, maintenance of aircraft sub-systems, maintenance of aircraft Ground Support
Equipment (GSE), maintenance and calibration of special tools and test equipment, repair of repairables, logistics support, maintenance training, monitoring, and mentoring. Specific requirements are as follows:
a. The Mission Capable Rate (MCR) of aircraft will be maintained at a rate of at least 80%.
b. Maintenance training will take place on aircraft.
c. Maintenance training will include Level 3, Level 2 and Level 1 stages encompassing: formal classroom, skill level training and accompanying apprenticeships.
i. Maintenance training will be six hours per day, six days per week in Afghanistan. All training will be fully documented.
ii. Supply Chain Management (SCM) will be an integral part of maintenance training.
iii. Training documents will be translated from English to Dari to facilitate student understanding and reduce training times.
iv. Student load requirements are subject to change. Initial requirement shall be for up-to 100 students per year, regardless of level.
d. Maintenance operations shall be conducted seven days per week, twelve hours per day with a 2 hour notice to launch on Fridays.
e. Maintenance shall be provided sufficient to support 90 flight hours per month per T-182T aircraft and 75 hours per month per C-208B aircraft.
f. United States Government (USG) will provide security and life support services.
ICS should encompass all launch, recovery, towing and flight line servicing, including actions required for operations and maintenance of aircraft subsystems and support equipment. ICS should include aircraft maintenance and personnel, all materials and inspections, publications; supply of all contractor owned and maintained spares and support equipment, repair and overhaul of all repairable spares, maintenance, repair or replacement of all support equipment, engine repair and engine overhaul. The contractor must use a "Remove/Replace" concept for maintenance for the aircraft and ground equipment supporting the operations of the fleet and must take advantage of the common commercial pool of parts.
All aircraft and equipment are to be maintained in accordance with the manufacturer’s Federal Aviation
Administration (FAA) approved Instructions for Continued Airworthiness (including service bulletins, etc.). Where licensed or certified personnel are required for proper task performance or record entry, they must be provided.
Maintenance Training:
The contractor will provide the necessary technician and organizational level maintenance training, based on data available under this program, developed and presented in accordance with the specific
Afghanistan equipment. Contractor provided training shall be transition-type training intended to enhance the existing skill sets already possessed by the Afghan Air Force (AAF) students in their particular field of expertise. This maintenance training must develop a cadre of maintainers to provide
Afghan maintenance on the T-182T and C-208B aircraft without oversight correction. All maintenance actions must be witnessed and signed off by an FAA Airframe and Powerplant (A&P) certified maintenance technician as long as the aircraft are in USAF ownership. Maintenance training shall also include Supply Chain Management training to allow Afghan maintainers to order aircraft parts for maintenance actions.
Training shall consist of formal classroom training and an accompanying apprenticeship program.
Synopsis:
Afghanistan Basic Trainer/Light Lift (BT/LL) Interim Contractor Support (ICS) Program Sources Sought
Synopsis (SSS). This SSS is for market research purposes only. This is NOT a Request for Proposal (RFP).
No solicitation is being issued at this time and this notice shall not be construed as a commitment by the
Government to issue a solicitation or ultimately award a contract. Any information provided by industry to the
Government as a result of this SSS notice is strictly voluntary. Responses will not be returned. No entitlement exists to payment of direct or indirect costs or charges to the Government incurred as a result of this SSS.
Information obtained from industry’s response to this notice may be used in the development of an acquisition strategy and future RFP.
This document describes an acquisition strategy for an anticipated ICS program for the BT/LL program in
Afghanistan.
Government Furnished Property:
The government will provide 26 Cessna C-208B aircraft, 6 Cessna T-182T Aircraft, 2 T-182T Basic Aircrew
Training Devices (BATD), 2 T-182T Flight Training Devices (FTD), and 2 C-208B FTDs.
Data Rights:
The Government does not own, nor will it purchase, Cessna C-208B or Cessna T-182T technical data rights.
All respondents are to state how work effort will be accomplished without Government provided C-208B and
T-182T technical data.
Additional Information
The presented facts and the unknown factors below, and in light of the continued need for interim contractor support for the Afghanistan BT/LL Program, the unknown security landscape, the timeline of the known requirement, and the continual changing environment in Afghanistan mandate implementing a bridge ICS contract. The changing environment and unknown future requirements include, but are not limited to: the security environment, transition, schedule, training and Bilateral Security Agreement and Status of Forces
Agreement, and basic program requirements (technical, place(s) of performance, duration of performance and
US withdrawal strategy).
The purpose of this contract is to provide a bridge of services and ensure no work stoppage until firm requirements are collated which will result in a competitive source selection. Future efforts will also be continued under normal procedures through Full and Open Competition.
The acquisition strategy has not yet been determined. Market research results will assist the Air Force in determining whether this requirement will be a full and open, a small business set-aside, or a sole source acquisition.
Note that, if there is sufficient demonstrated interested and capability among small business contractors, a key factor in determining if an acquisition will be a small business set-aside is that two or more potential small business prime contractors must be capable of performing at least 50% of the effort, as defined in Federal
Acquisition Regulation (FAR) clause 52.219-14, Limitations on Subcontracting. If it is determined that a small business set-aside is appropriate and your company anticipates submitting a proposal as the prime contractor for a small business set-aside, please provide specific details and rationale as to how compliance with FAR clause
52.219-14 would be achieved, including specific details regarding teaming arrangements, etc. If subcontracts are to be used, provide anticipated percentage of effort to be subcontracted and what type of businesses will be used for subcontracting (other than small business, small business, small disadvantaged business (SDB), woman-owned small business (WOSB), economically disadvantaged women-owned small business
(EDWOSB), 8(a)-certified business, service-disabled veteran-owned small business (SDVOSB), veteran-owned small business (VOSB), or Historically Underutilized Business Zone small business (HUBZone))..
Teaming and/or subcontracting arrangements should be clearly delineated and previous experience in teaming must be provided.
Note that, if this effort is not set-aside for small business, small business utilization will be considered. Request that large and small businesses provide a reasonable expectation for small business utilization as a percent of total contract value. Please provide supporting rationale for the recommended percentage.
Recommendations are also being sought regarding potential effort(s) that may be broken out of this requirement as shown in the draft performance work statement.
This acquisition will fall under NAICS 488190 and its applicable size standard. Responses shall be limited to
15 pages or less. Response package should contain one (1) copy provided in ADOBE ACROBAT (.pdf) format and typographical font of 10 or greater. All response packages should be emailed to the attention of the wendy.hess@us.af.mil or joesph.plessinger@us.af.mil and the Contracting Officer listed below by 4:00 PM
(EST) 30 January 2014.
mailto:wendy.hess@us.af.mil mailto:joesph.plessinger@us.af.mil
Any information submitted by respondents to this SSS is strictly voluntary. This SSS does not constitute a
Request For Proposal or an Invitation for Bid. SSS issuance does not restrict the Government’s ultimate acquisition approach. The Government will neither award a contract solely on the basis of this notice, nor pay for any information that is submitted by respondents to this SSS.
Fair and Reasonable Cost Determination: These items meet the definition of a commercial item per FAR 2.102.
In accordance with FAR 15.403-1(b)(3), the contracting office is exempt from requiring cost and pricing data and price reasonableness will be determined in accordance with FAR 12.209 and FAR 15.402 (a)(2). It is determined that the anticipated cost to the government for this contract action will be fair and reasonable. Prices for this purchase are comparable to the public sources researched through quotes and internet pricing.
Contracting Office Address:
1970 Monahan Way Bldg 11A, WPAFB, Ohio 45433
Places of Performance:
Kabul, Afghanistan
Kandahar, Afghanistan
Shindand, Afghanistan
Primary Point of Contact:
Contracting Officer, Felix Turner, Felix.Turner@wpafb.af.mil, (937) 904-4199 mailto:Felix.Turner@wpafb.af.mil
File details come from the government source that posted it. Updated .