Calibration Kit Technical Requirements Document.pdf
PDF 135 KB Posted
- Solicitation number
- FA860925PB001
About this file
This Technical Requirements Document from Wright-Patterson Air Force Base outlines specifications for radar warning receiver test calibration equipment and perpetual site licenses to be delivered to Tinker Air Force Base, Oklahoma.
The government seeks to purchase specific Textron radar simulator calibration kits and licenses including: one Model 627 Perpetual Lifetime Site License for Calibration & Recertification, one Model 627 Calibration Kit, one Model 527 Calibration Kit (39300-41010-10), one Programmed PCMCIA Card (FPCI-64MB-2132), and one Model 527 Perpetual Exclusive Lifetime Site License. Delivery must occur within 90 days after contract date. The contractor must include shipping and installation in their quote, provide all necessary peripherals for proper calibration kit function, outline software update frequency and delivery methods, and ensure site license terms comply with DFARS 252.227-7014.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract - FA860925PB001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Requirements Document Wright-Patterson Air Force Base
Radar Warning Receiver Test Calibration Equipment and Perpetual Site License 6 February 2025
1. GENERAL: The Government intends to purchase radar simulators and perpetual site licenses for calibration and recertification.
2. REQUIREMENTS: The Government intends to purchase Textron radar simulator calibration kits and site licenses in the following quantities and descriptions:
a. Model 627 Perpetual Lifetime Site License for Calibration & Recertification, Qty 1
b. Model 627 Calibration Kit, Qty 1
c. Model 527 Calibration Kit, 39300-41010-10, Qty 1
d. Programmed PCMCIA Card, FPCI-64MB-2132, Qty 1
e. Model 527 Perpetual Exclusive Lifetime Site License, Qty 1
3. SPECIFICS:
3.1. Shipping and installation (if necessary) must be included in the quotation.
3.1.1. Contractor shall deliver to Tinker Air Force Base, Oklahoma. Exact address on Tinker
Air Force Base to be given prior to delivery.
3.1.2. Delivery shall be no later than 90 days after date of contract (ADC).
3.1.3. Contractor shall outline expected software update frequency and its method of delivery.
3.1.4. Contractor shall deliver any and all necessary peripherals necessary for proper function and use for calibration kits.
3.1.5. The Government expects site license terms to be in accordance with DFARS 252.227-
7014.
File details come from the government source that posted it. Updated .