SHOPDWGS.DOC
DOC document 94 KB Posted
- Attached to
- Storage Aid System at Little Rock AFB, AR
- Solicitation number
- FA8604-10-R-7958
About this file
Shop Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vertical Carousel Product Description.docx | DOCX document | |
| Contractor Information.docx | DOCX document | |
| DI ILSS 81092 T.pdf | ||
| DI MGMT 80909 T.pdf | ||
| NLR0A6-01.pdf | ||
| NLR0A6-01.dwg | DWG drawing | |
| CERT.DOC | DOC document | |
| DI TMSS 80527.pdf | ||
| FA8604-10-R-7958 RFP.pdf | ||
| CHECKOUT.DOC | DOC document | |
| DI MGMT 80227 T.pdf | ||
| STATUS.DOC | DOC document | |
| DI TMSS 80528 T.pdf | ||
| DI DRPR 81003.pdf | ||
| PROGPLAN.DOC | DOC document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP____________ TM______________ OTHER ______________________________________________
D. SYSTEM/ITEM
Vertical Carousels
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Drawings, Engineering and Associated Lists
3. SUBTITLE
Level 2 Shop Drawings
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-DRPR-81003
5. CONTRACT REFERENCE
P.D. Paragraph 3.4
6. REQUIRING OFFICE
403 SCMS/GUEC
18. ESTIMATED
TOTAL PRICE
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
REQUIRED
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
LT
| ONE/R |
| 30 days ARO |
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
| a. ADDRESSEE |
| Draft |
| Final |
AN
See Block 16
| Reg |
| Repro |
16. REMARKS
| Block 4: The Data Item is tailored. See the tailored Data Item. |
| 403 SCMS/GUEC |
| 1 |
| 1 |
| 0 |
| Drawings shall meet the requirements of Level 2 drawings as defined in |
| 5215 Thurlow St. |
| DOD-D-1000B(4), paragraph 3.3. The size and format of the drawings |
| Suite 5 |
| shall be IAW ANSI Y14.1. The Contractor shall submit for review by the |
| WPAFB OH |
| Government a complete set of level 2 shop drawings. Design |
| 45433-5547 |
calculations shall be submitted with the shop drawings. The contract
| and drawing numbers shall be placed in the title block of engineering |
| ASC/PKESM |
| See Blk. 16 |
| drawings and associated lists. An FCSM is not required. Control |
| 2275 D Street |
| drawings need not be prepared. On multi-detail drawings, each detail |
| Bldg. 16, Room 128 |
| shall have its own boxed-off area on the drawing and shall be labeled |
| WPAFB OH |
| with a title and part number. The scale of each detail shall be shown |
| 45433-7228 |
under that detail's title. A parts list, which shall be integral with or
| separate from the engineering drawings, shall be provided per |
| 189 CE |
| 0 |
| 1 |
| 0 |
| DOD-STD-100C (Chapter 200) paragraphs 201.1.2 and 201.1.3, |
| 112 CMS Williams Dr. |
| respectively. The drawing package shall include assembly drawings. |
| Little Rock AFB AR |
| Tabulated detail drawings are acceptable. Microfilm is not required. |
| 72209-4802 |
Separate shop drawing sets shall be submitted for the Vertical
Carousels.
Block 12: Contractor shall deliver the shop drawings no later than
30 day after the completion of the Post Award Conference
Pre-pack storage take-away and drop off
Block 13: (a) The Contractor shall have 15 days to resubmit corrected shop drawings.
(b) All items shall be dated.
Block 14: (a) Contractor shall send transmittal letter with this data item to all addressees, stating who received data item and indicating contract line item number (CLIN) data item is submitted against (copy of letter of transmittal only to ASC/PKESM).
(b) All items shall be dated.
| (5/93) |
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
G. PREPARED BY
Robert O. Burns Senior Industrial Engineer
H.DATE
2-Aug-10
I. APPROVED BY
Timothy L Madden
Supervisory Industrial Engineer
J. DATE
2-Aug-10
DD Form 1423-1, JUN 90 1007/183
Previous editions are obsolete.
Page __3____ of ___7___ Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM-Technical Manual; Other-other category of data, such as "Provisioning," "Configuration Management", etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of-date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4;
Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
ITEM 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group 1. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group 1 are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD Form 1423-1 Reverse, JUN 90
File details come from the government source that posted it. Updated .