SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER

FA8604-08-R-7925

6. SOLICITATION ISSUE DATE

19 MAY 2008

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

DELORIS J. COTTON-SMITH

b. TELEPHONE NUMBER (No collect calls) 937-656-7487

8. OFFER DUE DATE/

LOCAL TIME

19 JUN 2008/1:00 PM

9. ISSUED BY ASC/PKESM CODE FA8604 10. THIS ACQUISITION IS 12. DISCOUNT TERMS

UNRESTRICTED

SET ASIDE: 100% FOR

11. DELIVERY FOR

FOB DESTINATION

UNLESS BLOCK IS

MARKED

SEE SCHEDULE

SMALL BUSINESS

HUBZONE SMALL BUSINESS

EMERGING SMALL BUSINESS

13a. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

8(A) 13b. RATING

SERVICE DISABLED VET SB DO-C9

NAICS: 333999 14. METHOD OF SOLICITATION

DEPARTMENT OF THE AIR FORCE

ASC/PKW, BLDG 16, ROOM 128

2275 D STREET

WRIGHT-PATTERSON AFB OH 45433-7228

DELORIS J. COTTON-SMITH 937-656-7487

deloris.cotton-smith@wpafb.af.mil

SIZE STANDARD: 500 RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

SEE SF1449 Continuation

17a. CONTRACTOR/

OFFEROR

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

OFFER BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See SF1449 Continuation (Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

See SF1449 Continuation 26 TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. OFFER DATED . YOUR OFFER ON

SOLICITATION (BLOCK 5) INCLUDING ANY ADDITIONS OR CHANGES

WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: SEE

CONTINUATION.

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

31c. DATE SIGNED

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED _________________________________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

35.AMT VERIFIED 36. PAYMENT33. SHIP NUMBER

PARTIAL FINAL

34. VOUCHER NUMBER

CORRECT FOR

COMPLETE PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MMM/DD) 42d. TOTAL CONTAINERS

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 4/2002)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212 ConWrite Version 6.10.5 Created 19 May 2008 10:58 AM

SF1449 CONTINUATION

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

Mezzanine System, Travis AFB, CA

0001 1 __________ Lot __________

Noun: MEZZANINE

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

In accordance with the Cover PD, Appendix A, Drawings BTR7B8-01and 02 listed in Section J.

0002 1 __________ Lot __________

Noun: A VERTICAL RECIPROCATING CONVEYOR

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

In accordance with the Cover PD, Appendix B, Drawings BTR7B8-01and 02 listed in Section J.

0003 1 __________ Lot __________

Noun: BIN SHELVING

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

In accordance with the Cover PD, Appendix C, Drawings BTR7B8-01and 02 listed in Section J.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0004 1 __________ Lot __________

Noun: WIDE-SPAN SHELVING

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

In accordance with the Cover PD, Appendix D, Drawings BTR7B8-01and 02 listed in Section J.

0005 1 __________ Lot __________

Noun: DATA (A001-A007)

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

Data to be delivered in accordance with DD Forms 1423-1 and 1664 listed in Section J (Ref also Attachment 1 listed in Section J)

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0001 1 U 150 DARO

Noun: MEZZANINE

ACRN: AA

Descriptive Data:

Site Access: Contractor will have access to base upon award of the contract

Delivery Address:

212 V Street Building 861 Travis AFB, CA 94535-2856

Local City: Fairfield, CA

Note: Add to the shipping label "To be offloaded and opened by the Contractor".

The following information should also be provided: Contractor Name, Contractor Representative and local commercial phone number.

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0002 1 U 150 DARO

Noun: A VERTICAL RECIPROCATING CONVEYOR

ACRN: AA

Descriptive Data:

Site Access: Contractor will have access to base upon award of the contract

Delivery Address:

212 V Street Building 861 Travis AFB, CA 94535-2856

Local City: Fairfield, CA

Note: Add to the shipping label "To be offloaded and opened by the Contractor".

The following information should also be provided: Contractor Name, Contractor Representative and local commercial phone number.

0003 1 U 150 DARO

Noun: BIN SHELVING

ACRN: AA

Descriptive Data:

Site Access: Contractor will have access to base upon award of the contract

Delivery Address:

212 V Street Building 861 Travis AFB, CA 94535-2856

Local City: Fairfield, CA

Note: Add to the shipping label "To be offloaded and opened by the Contractor".

The following information should also be provided: Contractor Name, Contractor Representative and local commercial phone number.

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0004 1 U 150 DARO

Noun: WIDE-SPAN SHELVING

ACRN: AA

Descriptive Data:

Site Access: Contractor will have access to base upon award of the contract

Delivery Address:

212 V Street Building 861 Travis AFB, CA 94535-2856

Local City: Fairfield, CA

Note: Add to the shipping label "To be offloaded and opened by the Contractor".

The following information should also be provided: Contractor Name, Contractor Representative and local commercial phone number.

0005 1 U ASREQ

Noun: DATA (A001-A007)

ACRN: AA

Descriptive Data:

Deliver to addresses in accordance with instructions on DD Form 1423-1

Obligation ACRN Appropriation/Lmt Subhead/Supplemental Accounting Data Amount

AA

57 83080 178 47CW 843050 000000 00000 000000 503000 F03000

PR/MIPR: F4FFCX8087B001

Descriptive data:

WIDE AREA WORK FLOW--RECEIPTS and ACCEPTANCE (WAWF-RA) DoDAAC AND E-MAIL DISTRIBUTION TABLE

WAWF-RA refers to the electronic invoicing, certification and payment system.

Benefits of using the system include reduction of lost or misplaced documents, faster payments when discounts are offered or taken, on-line access for payment status and history, etc.

The following links to several WAWF-RA websites will assist vendors, acceptors and buyers in your efforts.

1. Begin by taking the WAWF Computer Based Training at this site:

<http://wawftraining.com/>

2. An optional site to "practice" at is the WAWF-RA Training Site:

<https://wawftraining.eb.mil/> (Be sure to use the fake codes that they tell you to use…real world codes are not loaded)

3. To create and submit, accept and submit or monitor invoices, go to the WAWF-RA Production Site: <https://wawf.eb.mil/>

4. WAWF will only show that an invoice has been "processed" for payment. To check on an invoice to see that it is in the system "to be paid", go to:

<http://www.dod.mil/dfas> . Then scroll down until you see "Commercial Pay".

Link to the old "VPIS" system, or to the new "my Invoice" system.

Vendor: It is mandatory for vendors to begin using WAWF when the contract is eligible to be put into the system--when clause 252.232-7003 is in the contract.

This will be determined by the buyer for locally administered contracts.

Beginning 1 Jan 06, DFAS will reject paper invoices for IAPS paid contracts and where the contract directs use of WAWF. Follow the coding EXACTLY as set forth below. For more timely payment, please insert the additional emails into WAWF and/or send a manual email to the acceptor when the invoice has been submitted. Please contact Sharon Spencer, ASC/PKWXA, Wright- Patterson AFB, OH at (937) 656-7391 with any WAWF questions you may have regarding this contract.

Inspector: Those individuals who are directed by the contract to INSPECT the supplies/services are inspectors. If you are an inspector for this contract, you MUST obtain WAWF training immediately which can be accessed through on-line computer based training: <http://wawftraining.com> or obtained through Jackie Clay. You MUST register for an account in the system (if you have not already done so). Please email Jackie Clay, who is listed in the global address list, for help with getting a WAWF account. If you are designated in this contract to be the inspector, you MUST follow these instructions.

Acceptor: Those individuals who CERTIFY the invoices are acceptors. You cannot be an acceptor if you are a contractor (notify the buyer if you are). If you are an acceptor for this contract, you MUST obtain WAWF training immediately which can be accessed through on-line computer based training:

<http://wawftraining.com> or obtained through Jackie Clay. You MUST register for an account in the system (if you have not already done so). If you perform both inspection and acceptance on the contract, you may register as only an "acceptor" as both roles can be performed under the acceptor registration.

Please email Jackie Clay, who is listed in the global address list, for help with getting a WAWF account. If you are designated in this contract to be the inspector and/or acceptor, you MUST follow these instructions.

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE THE INVOICES

AND ADDITIONAL E-MAILS CORRECTLY THROUGH WAWF-RA.

SELECT THE FOLLOWING Invoice Type:

_______ Invoice (stand alone)

_______ Invoice as 2-In-1 (Services Only)

_______ Construction Payment Invoice

_______ Receiving Report

X Invoice and Receiving Report (Combo)

_______ Cost Voucher (52.216-7, 52.216-13, 52.216-14, 52.232-7)

Contract Number:

Delivery Order:

Issue-by DoDAAC: FA8604 (Vendor-enter the code provided. DO NOT change it.)

Admin DoDAAC: FY1294

Inspected By DoDAAC: Not Needed (Vendor-enter EXACTLY as provided. Do not add or delete numbers from the one given.)

Ship-To Code: FA8604 (Vendor-enter EXACTLY as provided. Do not add or delete numbers from the one given.)

Service Acceptor Code: FA8604 (Vendor-enter EXACTLY as provided. Do not add or delete numbers from the one given.)

Ship-From Code: NOT NEEDED

LPO DoDAAC/Ext: NOT NEEDED

Pay DoDAAC: F03000

ADDITIONAL E-MAIL NOTIFICATIONS: (Vendors: You MUST put these addresses into the designated area in WAWF or the inspector and/or acceptor will not know the invoice is in the WAWF system waiting for action)

1. Acceptors: deloris.cotton-smith@wpafb.af.mil <mailto:deloris.cotton-smith@wpafb.af.mil>

Deloris Cotton-Smith (FA8604)

ASC/PKESM

Bldg 16, Room 28 2275 D Street

WPAFB, OH 45433-7228

Phone: (937) 656-7487

2. tim.madden@wpafb.af.mil <mailto:tim.madden@wpafb.af.mil> Tim Madden (FA8604)

403 SCMS/GUEC

5215 Thurlow Street, Suite 5

WPAFB, OH 45433-5547

Phone: (937) 656-1726

3. Donna.hartman@wpafb.af.mil <mailto:Donna.hartman@wpafb.af.mil> Donna Hartman (FA8604)

403 SCMS/GUEC

5215 Thurlow Street, Suite 5

WPAFB, OH 45433-5547

Phone: (937) 656-1723

4. Carmela Scacca@wpafb.af.mil Carmela Scacca(FA8604)

403 SCMS/GUEC

5215 Thurlow Street, Suite 5

WPAFB, OH 45433-5547

Phone: (937) 257-7365

To access WAWF, go to https://wawf.eb.mil

Payment information may be accessed using the DFAS website at https://www.dod.mil/dfas. Your purchase order/contract number or invoice will be required to check status of your payment.

ADDENDUM

1. FAR 52.212-04 ADDENDUM TO CONTRACT TERMS AND CONDITIONS--COMMERCIAL

ITEMS (Feb 2007)

52.212-4, Contract Terms and Conditions -- Commercial Items is hereby tailored as follows:

(a) The place of inspection, acceptance, and FOB is Travis AFB, CA, (insert place of inspection, acceptance, and FOB).

Subparagraphs are tailored as follows:

(g) See also ASC/PKW-1005 - Contract Administration and Invoicing Data.

(c) Delete Changes; the clause at FAR 52.243-1, Changes--Fixed-Price, is incorporated herein by reference.

(o) Warranty - See FAR 52.246-17.

(s) Order of Preference - See AFMCFARS 5352.215-9005 (more tailoring of 52.212-4)

2. FAR 52.212-05 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (Apr 2008)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C 3553).

(2) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L.

108-77, 108-78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-06, Restrictions on Subcontractor Sales to the Government (Sep 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

(5) (i) 52.219-6, Notice Of Total Small Business Set-Aside (Jun 2003) (15 U.S.C. 644).

(7) 52.219-08, Utilization of Small Business Concerns (May 2004) (15 U.S.C.

637 (d)(2) and (3)).

(9) 52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C.

637(a)(14)).

(15) 52.219-28, Post Award Small Business Program Rerepresentation (June 2007) (15 U.S.C. 632(a)(2)).

(16) 52.222-03, Convict Labor (June 2003)(E.O. 11755).

(17) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Feb 2008) (E.O. 13126).

(18) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

(19) 52.222-26, Equal Opportunity (Mar 2007)(E.O. 11246).

(20) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006)(38 U.S.C. 4212).

(21) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793).

(22) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006) (38 U.S.C. 4212).

(23) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) (E. O. 13201).

(24) 52.222-50 Combating Trafficking In Persons (Aug 2007) (Applies to all contracts).

(24)(i) 52.222-50 Combating Trafficking In Persons (Aug 2007) (Applies to all contracts) - Alternate I (Aug 2007).

(31) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2006) (E.o.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(36) 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration (Oct 2003) (31 U.S.C. 3332).

(38) 52.232-36, Payment by Third Party (May 1999)(31 U.S.C. 3332).

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:

(7) 52.237-11, Accepting and Dispensing of $1 Coin (Aug 2007)(31 U.S.C.5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (i) through (vi) of this paragraph in a subcontract for commercial items.

Unless otherwise indicated below, the extent of the flow down shall be as required by the clause--

(i) 52.219-8, Utilization of Small Business Concerns (May 2004)(15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(ii) 52.222-26, Equal Opportunity (Mar 2007)(E.O. 11246).

(iii) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006)(38 U.S.C. 4212).

(iv) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998)(29 U.S.C. 793).

(v) 52.222-39, Notification of Employee Rights concerning Payment of Union Dues or Fees (Dec 2004)(E.O. 13201).

(vi) 52.222-41, Service Contract Act of 1965 (Nov 2007), flow down required for all subcontracts subject to the Service Contract Act of 1965 (41 U.S.C. 351, et seq.)

(vii) 52.222-50, Combating Trafficking in Persons (Aug 2007)(22 U.S.C.

7104(g)). Flow down required in accordance with paragraph (f) of FAR clause 52.222-50,

(viii) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

(ix) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Nov 2007) (41 U.S.C. 351, et seq.)

(x) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64,

(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

3. FAR 52.228-05 INSURANCE -- WORK ON A GOVERNMENT INSTALLATION (Jan 1997)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

4. FAR 52.229-03 FEDERAL, STATE, AND LOCAL TAXES (Apr 2003)

(a) As used in this clause--

"After-imposed Federal tax," means any new or increased Federal excise tax or duty, or tax that was exempted or excluded on the contract date but whose exemption was later revoked or reduced during the contract period, on the transactions or property covered by this contract that the Contractor is required to pay or bear as the result of legislative, judicial, or administrative action taking effect after the contract date. It does not include social security tax or other employment taxes.

"After-relieved Federal tax," means any amount of Federal excise tax or duty, except social security or other employment taxes, that would otherwise have been payable on the transactions or property covered by this contract, but which the Contractor is not required to pay or bear, or for which the Contractor obtains a refund or drawback, as the result of legislative, judicial, or administrative action taking effect after the contract date.

"All applicable Federal, State, and local taxes and duties," means all taxes and duties, in effect on the contract date, that the taxing authority is imposing and collecting on the transactions or property covered by this contract.

"Contract date," means the date set for bid opening or, if this is a negotiated contract or a modification, the effective date of this contract or modification.

"Local taxes," includes taxes imposed by a possession or territory of the United States, Puerto Rico, or the Northern Mariana Islands, if the contract is performed wholly or partly in any of those areas.

(b) The contract price includes all applicable Federal, State, and local taxes and duties.

(c) The contract price shall be increased by the amount of any after-imposed Federal tax, provided the Contractor warrants in writing that no amount for such newly imposed Federal excise tax or duty or rate increase was included in the contract price, as a contingency reserve or otherwise.

(d) The contract price shall be decreased by the amount of any after-relieved Federal tax.

(e) The contract price shall be decreased by the amount of any Federal excise tax or duty, except social security or other employment taxes, that the Contractor is required to pay or bear, or does not obtain a refund of, through the Contractor's fault, negligence, or failure to follow instructions of the Contracting Officer.

(f) No adjustment shall be made in the contract price under this clause unless the amount of the adjustment exceeds $250.

(g) The Contractor shall promptly notify the Contracting Officer of all matters relating to any Federal excise tax or duty that reasonably may be expected to result in either an increase or decrease in the contract price and shall take appropriate action as the Contracting Officer directs.

(h) The Government shall, without liability, furnish evidence appropriate to establish exemption from any Federal, State, or local tax when the Contractor requests such evidence and a reasonable basis exists to sustain the exemption.

5. FAR 52.232-32 PERFORMANCE-BASED PAYMENTS (Feb 2002)

(a) Amount of payments and limitations on payments. Subject to such other limitations and conditions as are specified in this contract and this clause, the amount of payments and limitations on payments shall be specified in the contract's description of the basis for payment.

(b) Contractor request for performance-based payment. The Contractor may submit requests for payment of performance-based payments not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the Contracting Officer, all performance-based payments in any period for which payment is being requested shall be included in a single request, appropriately itemized and totaled. The Contractor's request shall contain the information and certification detailed in paragraphs (l) and

(m) of this clause.

(c) Approval and payment of requests.

(1) The Contractor shall not be entitled to payment of a request for performance-based payment prior to successful accomplishment of the event or performance criterion for which payment is requested. The Contracting Officer shall determine whether the event or performance criterion for which payment is requested has been successfully accomplished in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the successful performance of any event or performance criterion which has been or is represented as being payable.

(2) A payment under this performance-based payment clause is a contract financing payment under the Prompt Payment clause of this contract and not subject to the interest penalty provisions of the Prompt Payment Act. The designated payment office will pay approved requests on the 30th day after receipt of the request for performance-based payment.

However, the designated payment office is not required to provide payment if the Contracting Officer requires substantiation as provided in paragraph (c)(1) of this clause, or inquires into the status of an event or performance criterion, or into any of the conditions listed in paragraph (e) of this clause, or into the Contractor certification. The payment period will not begin until the Contracting Officer approves the request.

(3) The approval by the Contracting Officer of a request for performance-based payment does not constitute an acceptance by the Government and does not excuse the Contractor from performance of obligations under this contract.

(d) Liquidation of performance-based payments.

(1) Performance-based finance amounts paid prior to payment for delivery of an item shall be liquidated by deducting a percentage or a designated dollar amount from the delivery payment. If the performance-based finance payments are on a delivery item basis, the liquidation amount for each such line item shall be the percent of that delivery item price that was previously paid under performance-based finance payments or the designated dollar amount. If the performance-based finance payments are on a whole contract basis, liquidation shall be by either predesignated liquidation amounts or a liquidation percentage.

(2) If at any time the amount of payments under this contract exceeds any limitation in this contract, the Contractor shall repay to the Government the excess. Unless otherwise determined by the Contracting Officer, such excess shall be credited as a reduction in the unliquidated performance-based payment balance(s), after adjustment of invoice payments and balances for any retroactive price adjustments.

(e) Reduction or suspension of performance-based payments. The Contracting Officer may reduce or suspend performance-based payments, liquidate performance-based payments by deduction from any payment under the contract, or take a combination of these actions after finding upon substantial evidence any of the following conditions:

(1) The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (h) and (i) of this clause).

(2) Performance of this contract is endangered by the Contractor's --

(i) Failure to make progress; or

(ii) Unsatisfactory financial condition.

(3) The Contractor is delinquent in payment of any subcontractor or supplier under this contract in the ordinary course of business.

(f) Title.

(1) Title to the property described in this paragraph (f) shall vest in the Government. Vestiture shall be immediately upon the date of the first performance-based payment under this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract

(2) "Property," as used in this clause, includes all of the following described items acquired or produced by the Contractor that are or should be allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices:

(i) Parts, materials, inventories, and work in process;

(ii) Special tooling and special test equipment to which the Government is to acquire title under any other clause of this contract;

(iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment and other similar manufacturing aids, title to which would not be obtained as special tooling under subparagraph (f)(2)(ii) of this clause; and

(iv) Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other clauses of this contract.

(3) Although title to property is in the Government under this clause, other applicable clauses of this contract (e.g., the termination or special tooling clauses) shall determine the handling and disposition of the property.

(4) The Contractor may sell any scrap resulting from production under this contract, without requesting the Contracting Officer's approval, provided that any significant reduction in the value of the property to which the Government has title under this clause is reported in writing to the Contracting Officer.

(5) In order to acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor must obtain the Contracting Officer's advance approval of the action and the terms. If approved, the basis for payment (the events or performance criteria) to which the property is related shall be deemed to be not in compliance with the terms of the contract and not payable (if the property is part of or needed for performance), and the Contractor shall refund the related performance-based payments in accordance with paragraph (d) of this clause.

(6) When the Contractor completes all of the obligations under this contract, including liquidation of all performance-based payments, title shall vest in the Contractor for all property (or the proceeds thereof) not --

(i) Delivered to, and accepted by, the Government under this contract; or

(ii) Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the Government under this clause.

(7) The terms of this contract concerning liability for Government-furnished property shall not apply to property to which the Government acquired title solely under this clause.

(g) Risk of loss. Before delivery to and acceptance by the Government, the Contractor shall bear the risk of loss for property, the title to which vests in the Government under this clause, except to the extent the Government expressly assumes the risk. If any property is damaged, lost, stolen, or destroyed, the basis of payment (the events or performance criteria) to which the property is related shall be deemed to be not in compliance with the terms of the contract and not payable (if the property is part of or needed for performance), and the Contractor shall refund the related performance-based payments in accordance with paragraph (d) of this clause.

(h) Records and controls. The Contractor shall maintain records and controls adequate for administration of this clause. The Contractor shall have no entitlement to performance-based payments during any time the Contractor's records or controls are determined by the Contracting Officer to be inadequate for administration of this clause.

(i) Reports and Government access. The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent information requested by the Contracting Officer for the administration of this clause and to determine that an event or other criterion prompting a financing payment has been successfully accomplished. The Contractor shall give the Government reasonable opportunity to examine and verify the Contractor's records and to examine and verify the Contractor's performance of this contract for administration of this clause.

(j) Special terms regarding default. If this contract is terminated under the Default clause,

(1) the Contractor shall, on demand, repay to the Government the amount of unliquidated performance-based payments, and

(2) title shall vest in the Contractor, on full liquidation of all performance-based payments, for all property for which the Government elects not to require delivery under the Default clause of this contract. The Government shall be liable for no payment except as provided by the Default clause.

(k) Reservation of rights.

(1) No payment or vesting of title under this clause shall --

(i) Excuse the Contractor from performance of obligations under this contract; or

(ii) Constitute a waiver of any of the rights or remedies of the parties under the contract.

(2) The Government's rights and remedies under this clause --

(i) Shall not be exclusive, but rather shall be in addition to any other rights and remedies provided by law or this contract; and

(ii) Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.

(l) Content of Contractor's request for performance-based payment. The Contractor's request for performance-based payment shall contain the following:

(1) The name and address of the Contractor;

(2) The date of the request for performance-based payment;

(3) The contract number and/or other identifier of the contract or order under which the request is made;

(4) Such information and documentation as is required by the contract's description of the basis for payment; and

(5) A certification by a Contractor official authorized to bind the Contractor, as specified in paragraph (m) of this clause.

(m) Content of Contractor's certification. As required in paragraph (l)(5) of this clause, the Contractor shall make the following certification in each request for performance-based payment:

I certify to the best of my knowledge and belief that --

(1) This request for performance-based payment is true and correct; this request (and attachments) has been prepared from the books and records of the Contractor, in accordance with the contract and the instructions of the Contracting Officer;

(2) (Except as reported in writing on ___, all payments to subcontractors and suppliers under this contract have been paid, or will be paid, currently, when due in the ordinary course of business;

(3) There are no encumbrances (except as reported in writing on ___) against the property acquired or produced for, and allocated or properly chargeable to, the contract which would affect or impair the Government's title;

(4) There has been no materially adverse change in the financial condition of the Contractor since the submission by the Contractor to the Government of the most recent written information dated ___; and

(5) After the making of this requested performance-based payment, the amount of all payments for each deliverable item for which performance-based payments have been requested will not exceed any limitation in the contract, and the amount of all payments under the contract will not exceed any limitation in the contract.

6. FAR 52.233-03 PROTEST AFTER AWARD (Aug 1996)

(a) Upon receipt of a notice of protest (as defined in FAR 33.101) or a determination that a protest is likely (see FAR 33.102(d)), the Contracting Officer may, by written order to the Contractor, direct the Contractor to stop performance of the work called for by this contract. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Upon receipt of the final decision in the protest, the Contracting Officer shall either--

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled either before or after a final decision in the protest, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--

(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to an adjustment within 30 days after the end of the period of work stoppage; provided, that if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon a proposal at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(e) The Government's rights to terminate this contract at any time are not affected by action taken under this clause.

(f) If, as the result of the Contractor's intentional or negligent misstatement, misrepresentation, or miscertification, a protest related to this contract is sustained, and the Government pays costs, as provided in FAR 33.102(b)(2) or 33.104(h)(1), the Government may require the Contractor to reimburse the Government the amount of such costs. In addition to any other remedy available, and pursuant to the requirements of Subpart 32.6, the Government may collect this debt by offsetting the amount against any payment due the Contractor under any contract between the Contractor and the Government.

7. FAR 52.236-02 DIFFERING SITE CONDITIONS (Apr 1984)

(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of

(1) subsurface or latent physical conditions at the site which differ materially from those indicated in this contract, or

(2) unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.

(b) The Contracting Officer shall investigate the site conditions promptly after receiving the notice. If the conditions do materially so differ and cause an increase or decrease in the Contractor's cost of, or the time required for, performing any part of the work under this contract, whether or not changed as a result of the conditions, an equitable adjustment shall be made under this clause and the contract modified in writing accordingly.

(c) No request by the Contractor for an equitable adjustment to the contract under this clause shall be allowed, unless the Contractor has given the written notice required; provided, that the time prescribed in paragraph (a) of this clause for giving written notice may be extended by the Contracting Officer.

(d) No request by the Contractor for an equitable adjustment to the contract for differing site conditions shall be allowed if made after final payment under this contract.

8. FAR 52.236-03 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (Apr 1984)

(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to

(1) conditions bearing upon transportation, disposal, handling, and storage of materials;

(2) the availability of labor, water, electric power, and roads;

(3) uncertainties of weather, river stages, tides, or similar physical conditions at the site;

(4) the conformation and conditions of the ground; and

(5) the character of equipment and facilities needed preliminary to and during work performance. The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.

(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

9. FAR 52.236-05 MATERIAL AND WORKMANSHIP (Apr 1984)

(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.

(b) The Contractor shall obtain the Contracting Officer's approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

(c) All work under this contract shall be performed in a skillful and workmanlike manner.

The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

10. FAR 52.236-06 SUPERINTENDENCE BY THE CONTRACTOR (Apr 1984)

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the work site a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

11. FAR 52.236-07 PERMITS AND RESPONSIBILITIES (Nov 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

12. FAR 52.236-08 OTHER CONTRACTS (Apr 1984)

The Government may undertake or award other contracts for additional work at or near the site of the work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.

13. FAR 52.236-09 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (Apr 1984)

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

14. FAR 52.236-10 OPERATIONS AND STORAGE AREAS (Apr 1984)

(a) The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

(b) Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

(c) The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

15. FAR 52.236-11 USE AND POSSESSION PRIOR…