Questions and Answers 1 - Off Base Lease 2 - 2nd Floor Furniture.pdf

PDF 230 KB Posted

Attached to
Off Base Lease 2, Second Floor Furniture
Solicitation number
FA860125Q0100
Issued by

About this file

This document is a Questions and Answers (Q&A) file for a federal contract opportunity for furniture procurement at Wright-Patterson Air Force Base. The solicitation (FA8601-25-Q-0100) seeks furniture for the Off Base Lease 2, Second Floor, with installation beginning in December 2025. The Q&A document addresses 17 specific vendor inquiries about technical specifications, including acceptable configurations for panel segments, electrical outlets, work surfaces, storage units, and installation requirements.

Key details include clarification that the construction contractor is responsible for electrical connections, stackable panels are preferred, laminate storage fronts are required, and a prevailing wage labor quote is expected. The proposal must be submitted electronically by 11 August 2025 at 11:00 AM EST to the Contracting Officer Candice Snow and Contracting Specialist Brian Algeo. The contract will be firm-fixed price, awarded to the lowest-priced offeror meeting technical requirements, with no specific manufacturer mandated, but products must meet specified requirements.

View the file

Other files

File Type Posted
OBL 2 SOW - 24 July 2025.pdf PDF
Solicitation - FA860125Q0100.pdf PDF
OBL 2 SOW - 14July2025.pdf PDF
Attachment 2 -RepsandCerts.pdf PDF
Attachment 3 - Solicitation - FA860125Q0100.pdf PDF
OBL 2 I-1.pdf PDF
Attachment 1 -OBL 2 SOW - 14July2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFLCMC) WRIGHT-

PATTERSON AIR FORCE BASE OHIO

24 July 2025

FROM: AFLCMC/PZIBA

2275 D Street, Building 16, Room 128 Wright-Patterson AFB, OH 45433

SUBJECT: Response to Inquiries regarding FA8601-25-Q-0100, Off Base Lease 2, 2nd Floor Furniture

– Document 1

QUESTIONS

1. QUESTION: Would it be ok to do a 2-segment tile as shown below in the second image for cost saving as well as continuity because the beltline tile requires a 16”H and it would differ visually from the other panels.

ANSWER: 2-segment tiles are acceptable.

2. QUESTION: For the power, out system uses triplex receptacles. Would it be approved to use (2) triplex at the belt and (1) triplex at the base which would equate to 9 outlets total?

ANSWER: That is acceptable.

3. QUESTION: For the work surface, can we do a freestanding post leg nearest the pantry for support? Spec states cantilever support.

ANSWER: Freestanding post for support is acceptable.

4. QUESTION: The mobile ped has one file drawer and one pencil drawer. Is that what you mean by “pencil drawer” in the SOW, or are you looking for extra items to go inside of the pencil drawer.

ANSWER: Extra item inside of pencil drawer.

5. QUESTION: In order to have three wireway notches in the surface it would require two surfaces. This could result in multiple wood grain directions:

ANSWER: Is it possible to have another notch added on the one piece top, above the mobile ped?

6. QUESTION: Is APG or the Construction Contractor responsible for the Electrician? I saw it written both ways in the 1.0 Scope section.

ANSWER: Construction contractor is responsible for making the connections. Furniture contractor is only to provide furniture electrical in order for the construction contractor to tie in the facility to the furniture.

7. QUESTION: The Scope says to reference section 3.2.11 for updated power harness requirements, but I can’t find that section. Can we confirm 8-wire as shown in section 2.2.11.1 is still correct?

ANSWER: Section 2.2.11.1 is correct.

8. QUESTION: 2.5.13 – “The contractor shall ensure that all communication outlet faceplates are provided with the furniture, based on the unique specification on the IT requirements.” Is this something APG will need to source or the Construction Contractor? Data faceplates aren’t part of our systems and if we need to provide them, we need to know the specs of the IT requirements so we can find the correct ones.

ANSWER: We only require a blank cover.

9. QUESTION: I would like to confirm this project should be quoted for prevailing wage labor quote?

ANSWER: Yes

10. QUESTION: Windows: We noticed that the layout seems to show windows behind both the WS.1 workstations and the PO.1 private offices. To ensure we propose the correct panel heights and avoid interfering with windows openings or natural light, could you please confirm the heights – off the floor – at which those windows begin?

ANSWER: Per the SOW, the correct panel heights are specified as to not interfere with the windows. PO.1 will not interfere with the windows.

11. QUESTION: Demountable Walls: Section 3.1.4 refers to demountable walls. We noticed that the demountable walls are shown in the floor plan, but there is no product specific call-out in the 14 July 2025 SOW. However, there is this 3.1.4 Statement, which leaves us wondering. Could you please confirm if these walls already exist, or if they are part of the scope and need to be supplied?

ANSWER: There are no demountable wall typicals for this project.

12. QUESTION: Panels: Section 3.1.1 and 3.1.2 refer to both monolithic and stackable panels. Based on the photographic image included, it appears that stackable (or segmented) panels are shown, however the written description mentions monolithic panels. Could you please clarify which panels is required for this project? This distinction affects both the design and overall cost proposal.

ANSWER: Reference cutsheets, not section 3.1.1. Stackable to resemble image provided on WS.1.

13. QUESTION: Laminate Storage: The 41 units of WS.1 show wood grain Laminated storage units. Can these be painted metallic instead?

ANSWER: Per typical WS.1, storage fronts to be laminate.

14. QUESTION: We saw that the proposal due date has been extended. Could you please confirm whether the deadline for submitting questions has also been extended, or if July 23rd is still the final date for inquiries?

ANSWER: Today, July 23rd is the last day for inquiries.

15. QUESTION: Is 24”W an acceptable width as long as all other requirements are met? Dimensions would be 24W x 24D x 74H.

ANSWER: Yes, 24” is acceptable.

16. QUESTION: Regarding a previous question, In order to have three wireway notches in the surface it would require two surfaces. This could result in multiple wood grain directions. The answer received was:

Is it possible to have another notch added on the one piece top, above the mobile ped? The follow-up question is: Can we do a grommet? Or is a notch required?

ANSWER: Grommet is fine.

17. QUESTION: Who is the manufacturer that you are referencing in the SOW?

ANSWER: There is no basis of design manufacturer. Products need to meet the requirements.

CANDICE L. SNOW

Contracting Officer

AFLCMC/PZIBA

2025-07-24T10:25:27-0400
SNOW.CANDICE.LYNN.1423542060