SOW_Library Shelving_Rev 25 Oct 24.pdf
PDF 678 KB Posted
- Attached to
- NMUSAF Library Shelving
- Solicitation number
- FA860125Q0009
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to provide new library shelving units for the National Museum of the United States Air Force (NMUSAF) Research Library.
The SOW specifies that the contractor shall provide a Spacesaver brand 4-post shelving system with steel construction, powder coat finish, glass front doors, and adjustable shelves. The shelving system must be between 675-695 linear feet, no taller than 62.75", and installed within 90 days of contract award. The contractor will be responsible for delivering, unpacking, and installing the shelving units during normal business hours. A one-year manufacturer warranty is required. The related federal contract opportunity is a pre-solicitation seeking capabilities packages from all potential sources, including small businesses. Responses are due by November 6, 2024 and should demonstrate the ability to meet the technical requirements outlined in the SOW. The contract will be awarded by the Air Force Life Cycle Management Center at Wright-Patterson Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1: STATEMENT OF WORK
STATEMENT OF WORK
RESEARCH LIBRARY SHELVING
BRAND NAME OR EQUAL
Revised, 25 October 2024
National Museum of the United States Air Force, Wright-Patterson Air Force Base, Ohio
I. SCOPE OF WORK: The National Museum of the United State Air Force (NMUSAF) is a world leader in the museum profession reflecting the Department of the Air Force's (DAF) standards of excellence in performance and technology as a fully accredited military aviation and history museum. NMUSAFs mission is to protect, collect, research, preserve, interpret, and present the DAF’s history, heritage, and traditions. The Research and Archives Division (MUA) supports the mission by managing and preserving the archival collections, developing content for exhibition, and providing historical guidance for exhibit development, aircraft restoration, staff projects, and queries from the public and media. Per Department of the Air Force Instruction 84-103, Department of the Air Force Heritage Program, one of the core missions of NMUSAF and the DAF History and Museum Program is to preserve museum objects and prolong their usefulness to the study of material culture, while using reasonable care to protect rare and historically significant materials from deterioration by following generally accepted library and museum conservation standards.
Our current research library shelving is more than six decades old, and the collection has well outgrown its capacity. Beyond their lack in space, the units are deteriorating and no longer functioning as proper library/archival book storage. Additionally, there are safety concerns due to peeling paint, sharp corners, and broken access points.
II. SCOPE: NMUSAF/MUA requires Spacesaver brand shelving/storage solution for our
Research Library & Reference Book Collection. The appropriate storage will be a 4-post-type shelving system, that will be easy to reconfigure as our space changes and grows.
Units should be made of steel, with a powder coat paint finish in line with American Library Association standards. Each unit should have window (glass) frame-mounted hinge opening doors to promote complete visibility. Units should be adaptable to mobile storage applications. Due to current building limitations, units can be no taller than 62.75” and should provide a minimum 675 linear feet but no more than 695 linear feet.
III. REQUIREMENTS: The contractor shall provide the following Spacesaver solution:
3.1 post type shelving units double-wall steel construction
3.2 Powder coat paint finish (in line with American Library Association standards)
3.3 Doors (Glass front, frame mounted, double-walled, with lift off hinges)
3.4 Shelves (must be adjustable)
3.5 Number of units & dimensions:
3.6 37 units @ 48"Wx 62.75"Hx13"D
3.7 6 units @ 36"Wx 62.75"H x 13"D
3.8 1 unit @ 36"Wx 62.75"H x 13"D
3.9 Height Limitation no taller than 62.75”
3.10 Space Available
3.11 Minimum: 675 linear feet
3.12 Maximum: 695 linear feet
IV. SCHEDULE: The contractor shall work directly with NMUSAF/MUA to ensure timely install shelving system.
4.1 NMUSAF/MUA will provide the contractor access to the facilities from (0700 to 1530) daily.
4.2 Equipment Installation: The contractor shall install all equipment, and the installation shall unload the units and stage them in the MUA Research Library, to include unpacking and installation per approved Project Plan (does not include unloading or loading of books or removal of existing cabinets). All trash/packing materials will be removed. And all work is during normal business hours of the division (0700 to 1530 Monday- Friday, *except federal holidays).
4.3 All contractor personnel shall be U.S. citizens.
V. DELIVERY: Delivery of equipment, installation, integration and testing shall be completed by 90 days after date of contract award. Deliverable items shall be delivered to the following address:
5.1 Delivery Address:
NMUSAF/MUA
2601 E. St.
Bldg 5. Door 17 Wright-Patterson AFB, OH 45433-7102
5.2 DELIVERY POINT OF CONTACT (POC): A Point of Contact (POC) will be identified in the schedule of the final awarded contract who will be responsible for coordinating delivery and installation.
VI. INSPECTION AND ACCEPTANCE: Subject to security regulations, Inspection and
Acceptance of the equipment required under this Statement of Work (SOW) shall be performed on the Delivery Date at the Delivery Location.
6.1 INSPECTION/ACCEPTANCE POC: A POC will be identified in the schedule of the final awarded contract for this requirement. All contractor personnel performing work under this contract shall comply with all applicable Federal and State laws, as well as all Air Force and local regulations.
VII. WARRANTY: At least a one-year manufacturer warranty shall be honored by contractor for all supplies delivered for this requirement.
VIII. QUALIFYING COUNTRY PRODUCTS: All products delivered to satisfy these requirements shall be manufactured in a qualifying country source in accordance with Defense Federal Acquisition Regulation Supplement, DFARS 225.872-1. Products from other than qualifying countries will not be accepted, and any costs associated with products from other than qualifying countries, including shipping, etc., shall be at the contractor’s expense.
IX. INVOICE AND PAYMENT: The contractor shall be paid upon submission of a properly prepared invoice and after final inspection and acceptance has been made. A proper invoice shall cite the contractor’s name and address, invoice number, invoice date, order number, contract line-item number (CLIN), description of the supplies or service, unit of issue, unit price and extended price, terms of any prompt payment discount offered, and who to notify in the event the invoice is defective.
9.1 The invoice shall be submitted to in Wide Area Workflow (WAWF) in accordance with the terms of the final contract award.
X. DELIVERY PROCEDURES COMMERCIAL VEHICLES:
a. The company shall properly ship the system to the Air Force Institute of
Technology at WPAFB, OH. All shipping costs to include insurance will be included in contractor’s proposal. Great care using standard, approved packaging methods shall be taken.
b. All vehicles larger than a large pick-up truck are required to be inspected by the
Wright-
Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation. Vehicles to be inspected include, but are not limited to, the following:
1. Step van/panel truck
2. Tractor/trailer, box and flatbed containing cargo
3. Tanker trucks
4. Box trucks
5. Tour buses
6. Garbage/recycled waste trucks
7. Concrete trucks/mixers, dump trucks
8. Cranes, recreational vehicles, petroleum tanker
This inspection will be conducted at Gate 26A located off State Route 235.
c. The following are exemptions to vehicles utilizing the CVDG:
1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.
2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.
d. Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM.) Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.
File details come from the government source that posted it. Updated .