This performance work statement outlines requirements for a floor maintenance service contract to be performed annually at Wright Patterson Air Force Base in Ohio. The contractor will provide all necessary equipment and supplies to clean and wax floors in Building 70 once per year, totaling 14,800 square feet, for a base year plus four option years. The contractor must have competent personnel trained in floor maintenance and provide a single point of contact available 24/7. The response deadline for information in response to this sources sought notice is February 20, 2024.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
(PWS)
FOR
Floor Maintenance Service
06 February 2024
I. BACKGROUND: The Aerospace Fuels Laboratory has a requirement for a floor maintenance service to be performed one (1) time per year for a period of one (1) base year plus four (4) option years. Services will be performed at Wright Patterson AFB OH Area B, Building 70, 14,800 SqFt.
II. MINIMUM TECHNICAL REQUIREMENTS:
The contractor shall meet the following Technical Requirements:
• The Contractor will supply all necessary equipment and supplies including but not limited to labor, tools, cleaning supplies and other related items to complete a onetime visit for cleaning and waxing of floors. The Contractor shall not be liable for repairs necessitated by abuse, misuse, unauthorized modifications, neglect, accidents, improper operation, or any external causes including, but not limited to, fire, water, power failures, explosions, and acts of God. For the causes listed above, the Contractor has submitted in writing to the Government a description of work required to be performed and request the consent of the Government to perform work.
• Contractor shall provide one visit per year up to a maximum of five days, which shall include but not be limited to the following:
1. Sweep all areas and remove debris.
2. Strip VTC flooring to remove old floor finish.
3. Detail VTC flooring in preparation of new floor finishes.
4. Apply one coat of premium sealer to VTC.
5. Apply three coats of premium floor finish to VTC.
6. Power scrub all concrete/epoxy and stair well floors with neutral cleaner.
7. Finish mop all concrete/epoxy and stair well floors.
8. Power scrub all anti-static flooring using 3M neutral pH cleaner and 3M 5100 pad.
9. Finish mop all anti-static flooring.
10. Dry buff all anti-static flooring with 3M 5100 buff pad.
11. NOTE: Movement of materials and equipment will be moved and returned by others.
III. MINIMUM PERFORMANCE REQUIREMENTS:
The contractor shall meet the following Performance Requirements:
• COMPETENCY OF CONTRACTOR PERSONNEL: All service performed under this contract shall be performed by competent personnel, fully trained to perform the required maintenance in accordance with the best commercial practices without unnecessary delays or interference with the government functions. The maintenance personnel shall have completed applicable maintenance training specified by the original equipment used for the maintenance of the floors.
• SINGLE POINT OF CONTACT: The Contractor shall identify a 24-hour/seven day a week single point of contact (service facility and corresponding telephone number) for Government personnel requesting services to be performed under this contract. If the point of contact is not within the local calling area, the contractor shall provide a toll-free number for such service. The Contractor shall make answering arrangements to enable its maintenance representative to receive notice of a service request or provide an answering service or other telephone coverage to permit the Government to make timely contact through all periods of coverage.
• DAMAGED MATERIALS: The Contractor shall replace any Government-owned materials, which are damaged by malfunction of Contractor-maintained equipment, Contractor-provided equipment, or by Contractor fault, with material of equal or better quality.
• SECURITY CLEARANCE: Requirement for security clearance is not anticipated. If, however, security clearance is determined to be necessary, the Contractor shall ensure that maintenance personnel complete all security forms (personal history, fingerprint card, and other applicable details) within 30 calendar days following notification of the requirement form the Government.
• PROOF OF RESOURCE: Upon request by the Government, the Contractor shall show evidence of proper level or resources to perform tasks under this contract, such as ownership or licensing of spare parts, diagnostic and repair tools, documentation, and employment of personnel.
IV. DELIVERY/PLACE OF PERFORMANCE: The floor maintenance service shall be performed one (1) time per year at the following address:
Bldg. 70, Area B 2430 C. Street
Wright- Patterson AFB, OH 45433
V. INVOICE AND PAYMENT: The contractor shall be paid upon submission of a properly prepared invoice and after final inspection and acceptance has been made. A proper invoice shall cite the contractor’s name and address, invoice number, invoice date, order number, contract line item number (CLIN), description of the supplies or service, unit of issue, unit price and extended price, terms of any prompt payment discount offered, and who to notify in the event the invoice is defective. The invoice shall be submitted to in Wide Area Work Flow (WAWF) in accordance with the terms of the final contract award”
VI. DELIVERY PROCEDURES COMMERCIAL VEHICLES: All vehicles larger than a large pick‐up truck are required to be inspected by the Wright‐ Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation.
1. Vehicles to be inspected include, but are not limited to, the following:
i. Step van/panel truck
ii. Tractor/trailer, box, and flatbed containing cargo
iii. Tanker trucks
iv. Box Trucks
v. Tour buses
vi. Garbage/recycled waste trucks
vii. Concrete trucks/mixers, dump trucks
viii. Cranes, recreational vehicles, petroleum tanker
2. This inspection will be conducted at Gate 16A located off State Route 444. The following are exceptions to vehicles utilizing the CVDG:
i. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.
ii. If a delivery vehicle must exit, and then re‐enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre‐clearance form. The driver shall present the pre‐ clearance form to the entry controller at the next point of installation entry. This reentry can be at any base gate.
iii. Wright Patterson Integrated Defense Plan, paragraph 3.10.12.9.2. All irregular deliveries will be sent to the CVDG for inspection. All visitors, which include contractors and commercial vendors without proper background checks and contractor passes, will not be allowed on WPAFB unless escorted by the receiving agency. This will take place after the individual(s) are issued a pre‐ clearance form at the CVDG. After successful completion of the vehicle inspection, the receiving agency will escort the individual to and from their destination on WPAFB. An inspector at the CVDG will contact the receiving.
agency, informing them to send an escort to the CVDG. Escorts will remain with the vehicle at all times while it is on WPAFB.
3. Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM). Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.
| II. MINIMUM TECHNICAL REQUIREMENTS: |
| The contractor shall meet the following Technical Requirements: |
| The contractor shall meet the following Performance Requirements: |