Attachment_5_Reqirements_Fire_Suppression_System_19-04-17.pdf
PDF 71 KB Posted
- Attached to
- Fire Suppression Repair and Maintenance Federal contract opportunity
- Solicitation number
- FA8601-19-Q-0054
About this file
Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4_-_TEP_Calculation_Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Solicitation_-_FA860119QA054.pdf | ||
| Combined_Synopsis_Template.docx | DOCX document | |
| Attachment_3_-_Wage_Determination_for_Greene_County.pdf | ||
| Attachment_1_-_3-Year-Fire-Suppression-System-PWS-19-04-17.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED 17 Apr 2019
REQUIREMENTS DOCUMENT
IN SUPPORT OF
FIRE SUPPRESSION SYSTEM SERVICES
FOR
AEROSPACE SYSTEMS DIRECTORATE
AIR FORCE RESEARCH LABORATORY
WRIGHT PATTERSON AFB, OH
The Aerospace Systems Directorate, Air Force Research Laboratory, is seeking a contract for normal maintenance services, yearly inspections, testing, upgrades, modifications, and emergency maintenance for three (3) high pressure carbon dioxide fire suppression systems and one (1) low pressure carbon dioxide system, consisting of nine (9) low pressure systems, installed between 1940 and 2008 and one (1) Aqueous Fire Fighting Foam (AFFF) system. The Contractor shall furnish all equipment, labor, and materials, and shall perform all operations necessary to complete the work.
Estimated Annual Requirements:
Description BASE
YEAR
OPT YR.
I
OPT
YR. II
Low pressure CO2 system inspection
9 9 9
High pressure CO2 system inspection
3 3 3
AFFF inspection 1 1 1 Backup battery replacement (approximate) 4 4 4
Main tank top off (approximate)
17,000 LB
17,000
LB
17,000
LB
Upgrade low pressure CO2 panel
0 4 4
Replace main CO2 tank 1 0 0 Refill main CO2 tank 34,000 lb 0 0
Install main isolation valve 0 4 4 Install spurt isolation valve 0 2 1 Verify or replace nozzles* 0 22 19
*Based on system analysis
Minimum Requirements:
1. CONTRACTOR QUALIFICATIONS
Contractor shall have a license from the Ohio state fire marshal’s office.
2. ISOLATION VALVES
Isolation valves shall be installed in all low pressure hazard areas per table below.
BLDG 18 B BLDG 18 C BLDG 18 E
ROOM Vault B-51 Vault B-
Vault B-50A Room
Room
Room
Room
Room
MAIN
HEADER
SIZE (IN)
1 1 2 6 4* 6 6 6
SPURT
HEADER
SIZE (IN)
2 2 2
*Size uncertain.
3. UPGRADE SPECIFICATIONS
Equipment replaced in PWS Para. 15a shall be compatible with the equipment listed below.
a. Main bulk CO2 tank. Chemetron, 17 ton capacity minimum; storage of CO2 at 0 degrees F and 300 psi.
b. Low pressure CO2 panels, Chemetron; per table below.
FLOOD
20-30 SECOND DELAY
LOCATION PANEL
TYPE
SPURT MANUAL
DUMP
AUTOMATIC
DUMP
INPUTS ELECTRONIC
OUTPUTS
Bldg 18B, transformer vault B-50
Chemetron
Micro 1
X X • Heat detector
• Manual switch
• Bldg alarm
• Annunciators
• Trouble
Bldg 18B, transformer vault B-51
Chemetron
Micro 1
EV
X X • Heat detector
• Manual switch
• Bldg alarm
• Annunciators
• Trouble
Bldg 18C, Research Cell
Chemetron
Micro 1
X X • Heat detector
• Manual switch
• Bldg alarm
• HVAC
shutdown
• Bay door closure
• Annunciators
• Trouble
Bldg 18C, Research Cell
Chemetron
Micro 1
EV
X X • Heat detector
• Manual switch
• Bldg alarm
• HVAC
shutdown
• Bay door closure
• Annunciators
• Trouble
Bldg 18C, Research Cell
Chemetron
Micro 1
X • Heat
Detector
• Manual switch
• Bldg alarm
• HVAC
shutdown
• Bay door closure
• Annunciators
• Trouble
Bldg 18E, X X • Heat
Detector
• Manual switch
• Bldg alarm
• HVAC
shutdown
• Bay door closure
• Annunciators
• Trouble
Bldg 18E, X • Heat
Detector
• Manual switch
• Bldg alarm
• HVAC
shutdown
• Bay door closure
• Annunciators
• Trouble
Bldg 18B, transformer
Chemetron
Micro 1
EV
X X • Heat
Detector
• Bldg alarm
• Annunciators
• Trouble vault B-50A, Micro 1 EV
• Manual switch