Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Fire Suppression Repair and Maintenance, newest first.
File Type Posted
Attachment_4_-_TEP_Calculation_Spreadsheet.xlsx XLSX spreadsheet
Attachment_2_-_Solicitation_-_FA860119QA054.pdf PDF
Combined_Synopsis_Template.docx DOCX document
Attachment_3_-_Wage_Determination_for_Greene_County.pdf PDF
Attachment_1_-_3-Year-Fire-Suppression-System-PWS-19-04-17.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED 17 Apr 2019

REQUIREMENTS DOCUMENT

IN SUPPORT OF

FIRE SUPPRESSION SYSTEM SERVICES

FOR

AEROSPACE SYSTEMS DIRECTORATE

AIR FORCE RESEARCH LABORATORY

WRIGHT PATTERSON AFB, OH

The Aerospace Systems Directorate, Air Force Research Laboratory, is seeking a contract for normal maintenance services, yearly inspections, testing, upgrades, modifications, and emergency maintenance for three (3) high pressure carbon dioxide fire suppression systems and one (1) low pressure carbon dioxide system, consisting of nine (9) low pressure systems, installed between 1940 and 2008 and one (1) Aqueous Fire Fighting Foam (AFFF) system. The Contractor shall furnish all equipment, labor, and materials, and shall perform all operations necessary to complete the work.

Estimated Annual Requirements:

Description BASE

YEAR

OPT YR.

I

OPT

YR. II

Low pressure CO2 system inspection

9 9 9

High pressure CO2 system inspection

3 3 3

AFFF inspection 1 1 1 Backup battery replacement (approximate) 4 4 4

Main tank top off (approximate)

17,000 LB

17,000

LB

17,000

LB

Upgrade low pressure CO2 panel

0 4 4

Replace main CO2 tank 1 0 0 Refill main CO2 tank 34,000 lb 0 0

Install main isolation valve 0 4 4 Install spurt isolation valve 0 2 1 Verify or replace nozzles* 0 22 19

*Based on system analysis

Minimum Requirements:

1. CONTRACTOR QUALIFICATIONS

Contractor shall have a license from the Ohio state fire marshal’s office.

2. ISOLATION VALVES

Isolation valves shall be installed in all low pressure hazard areas per table below.

BLDG 18 B BLDG 18 C BLDG 18 E

ROOM Vault B-51 Vault B-

Vault B-50A Room

Room

Room

Room

Room

MAIN

HEADER

SIZE (IN)

1 1 2 6 4* 6 6 6

SPURT

HEADER

SIZE (IN)

2 2 2

*Size uncertain.

3. UPGRADE SPECIFICATIONS

Equipment replaced in PWS Para. 15a shall be compatible with the equipment listed below.

a. Main bulk CO2 tank. Chemetron, 17 ton capacity minimum; storage of CO2 at 0 degrees F and 300 psi.

b. Low pressure CO2 panels, Chemetron; per table below.

FLOOD

20-30 SECOND DELAY

LOCATION PANEL

TYPE

SPURT MANUAL

DUMP

AUTOMATIC

DUMP

INPUTS ELECTRONIC

OUTPUTS

Bldg 18B, transformer vault B-50

Chemetron

Micro 1

X X • Heat detector

• Manual switch

• Bldg alarm

• Annunciators

• Trouble

Bldg 18B, transformer vault B-51

Chemetron

Micro 1

EV

X X • Heat detector

• Manual switch

• Bldg alarm

• Annunciators

• Trouble

Bldg 18C, Research Cell

Chemetron

Micro 1

X X • Heat detector

• Manual switch

• Bldg alarm

• HVAC

shutdown

• Bay door closure

• Annunciators

• Trouble

Bldg 18C, Research Cell

Chemetron

Micro 1

EV

X X • Heat detector

• Manual switch

• Bldg alarm

• HVAC

shutdown

• Bay door closure

• Annunciators

• Trouble

Bldg 18C, Research Cell

Chemetron

Micro 1

X • Heat

Detector

• Manual switch

• Bldg alarm

• HVAC

shutdown

• Bay door closure

• Annunciators

• Trouble

Bldg 18E, X X • Heat

Detector

• Manual switch

• Bldg alarm

• HVAC

shutdown

• Bay door closure

• Annunciators

• Trouble

Bldg 18E, X • Heat

Detector

• Manual switch

• Bldg alarm

• HVAC

shutdown

• Bay door closure

• Annunciators

• Trouble

Bldg 18B, transformer

Chemetron

Micro 1

EV

X X • Heat

Detector

• Bldg alarm

• Annunciators

• Trouble vault B-50A, Micro 1 EV

• Manual switch