Requirements - Single Pump high pressure system

View the file

Other files

File Type Posted
RFQ_CoverSheet.docx DOCX document
Regulation_TO_1-1-691_para_3.5.3.3.pdf PDF
1._Solicitation_Document_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

Wright-Patterson Air Force Base (WPAFB)

Replace Nilfisk Alto Delta booster pump with a New Single Pump System

7 August 2018

OBJECTIVE

Contractor shall remove and dispose of two Nilfisk Alto Delta booster high pressure water pump systems Model # 705202, Make # 9001571; each system consists of 6 pumps. Contractor shall replace them with a new high pressure single pump system capable of supplying pressure of 1,000 to 1,500 PSI to one individual spray system feed for the 445th Aircraft Maintenance Squadron (AMXS), Wright Patterson AFB, Ohio 45433.

1.0 GENERAL

1.1. The contractor shall:

a. Shut down the old system, locking out the electricity and water supply.

b. Remove and disposal of the two existing Nilfisk high pressure systems. The Government will provide dumpster for removal of scrap. The 445 AMXS will direct the contractor as to where to place the removed scrap from old pump systems.

a. Install new high pressure single pump system and reconnect electricity and water supply.

b. Provide a pump system that adheres to Technical Order 1-1-691 para 3.5.3.3 and provides 1,000-1,500 PSI to one plumbing input.

c. Install any ancillary plumbing hookup to ensure proper water connections for new high pressure system.

d. Perform start up, test, and ensure the system is fully operational.

e. Remove all debris and any tools from the job site after each day when work is performed; 445 AMXS shall not be responsible for any lost, missing, or stolen items.

f. Provide preventative maintenance guidance to three operators of the high pressure system within 445 AMXS.

g. Provide a system manual, parts breakdown, and recommended maintenance schedule.

h. Provide, at minimum, a one year warranty on all labor and parts.

i. Include mixing valve to ensure specific temperature when mixing hot and cold water.

j. Follow all instructions provided by 445 AMXS personnel when working in the controlled area.

k. Be escorted by a 445 AMXS person to controlled area where work will be performed.