Attachment_2_Procurement_Specification_Sheet.pdf

PDF 148 KB Posted

Attached to
Specialized Shipping and Storage Containers
Solicitation number
FA8601-18-Q-0152R1
Issued by

About this file

Attachment 2 Procurement Specification Sheet

View the file

Other files

File Type Posted
F4FD3N8135A102_-_SOW_-_Statement_of_Work_20180914.doc DOC document
pics_Q&A_7_Sep.docx DOCX document
Q&A_7_Sep_2018.pdf PDF
Attachment_7_Clauses_and_Provisions.pdf PDF
Attachment_8_GFP.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment_4_FAR_52.212-3.pdf PDF
Attachment_6_FAR_52.209-11.pdf PDF
Attachment_3_Drawing_Instructions.pdf PDF
Attachment_5_FAR_52.222-22_&_25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification No. SP8864811/61

Code Identification 0B275

27 April 2018

AIR FORCE PACKAGING TECHNOLOGY

AND ENGINEERING FACILITY

PRIME ITEM PRODUCT FABRICATION SPECIFICATION

FOR

CONTAINER, SHIPPING AND STORAGE, ANTENNA, CNU-459/E & CNU-470/E

1. SCOPE.

1.1 Scope. This specification establishes the requirements for manufacture and acceptance of the

Shipping and Storage Containers, Data List (DL) 8864811 for CNU-459/E and DL8864861 for

CNU-470/E.

2. APPLICABLE DOCUMENTS.

2.1 Issue of documents. The following documents of the issue in effect on the date of Request For

Proposal, form a part of this specification to the extent specified herein:

SPECIFICATIONS

Military

MIL-STD-648 Design Criteria for Specialized

10 April 2008 Shipping Containers

DRAWINGS

Air Force, Cage Code 0B275

DL8864811 Container, Shipping and Storage, Antenna CNU-459/E

DL8864861 Container, Shipping and Storage, Antenna CNU-470/E

Copies of specifications, standards, drawings, and publications required by suppliers in connection with this acquisition should be obtained from the Contracting Officer.

2.2 Other publications.

American Welding Society (AWS)

AWS D1.2-2003 Welding Code, Structural Aluminum, Standard

Specification

2.3 Conflicting requirements. Conflicting requirements arising between this specification and any specification, publication or drawing listed herein shall be referred in writing to the Procurement

Contracting Officer for interpretation, clarification, and correction.

3. REQUIREMENTS.

3.1 Item definition. Each item is an aluminum, reusable, long life, shipping and storage container that provides physical and environmental protection for military hardware. The container is designed to accommodate one Antenna. The cover and base assembly are interfaced with a sealing gasket and joined together with cam-over center action latches. Humidity is monitored through the use of a humidity indicator. Pressure within the sealed environment is controlled using a pressure equalizing valve. The container has a cradle system that holds the antenna in place. The cradle system rests on polyethylene foam cushions that provide shock mitigation. Container handling provisions consist of side and end forklift pockets and retractable casters. The cover, when turned upside down, temporarily holds an antenna during a repair exchange process

3.2 Characteristics.

3.2.1 Performance. The containers shall meet the following performance requirements.

3.2.1.1 Inspection. The containers, when examined in accordance with 4.1.1 and 4.2.1 shall comply with the fabrication and assembly requirements of DL8864811 and DL8864861 and associated drawings within the specified tolerances and specifications listed thereon, respectively.

3.2.1.2 Leakage. The containers shall be capable of maintaining pressure, within the allowable leak rate, when tested per 4.1.5. Each contract deliverable container, first article and production, shall be

100% leak tested per 4.1.5.

3.2.1.3 Container interface.

3.2.1.3.1 One Ku-Band Antenna shall be secured in, and removed from the container (CNU-459/E) utilizing only the prescribed handling equipment. The container shall demonstrate proper support of the item without interference or binding. Interference dimensions may be dimensionally inspected to verify conformance. (See 4.1.2.)

3.2.1.3.2 One X-Band Antenna shall be secured in, and removed from the container (CNU-470/E) utilizing only the prescribed handling equipment. The container shall demonstrate proper support of the item without interference or binding. Interference dimensions may be dimensionally inspected to verify conformance. (See 4.1.2.)

3.2.1.4 Gasket Strength. The container gasket joint shall be capable of withstanding a tensile force of 20 pounds, without evidence of damage or separation as specified herein. (See 4.1.4).

3.3 Design and construction.

3.3.1 Production drawings. The containers shall be fabricated and assembled in accordance with all applicable drawings, parts lists, and other documents listed on DL8864811 and DL8864861, respectively.

3.3.2 Standards of manufacture. The detailed requirements for materials, design, and construction of containers to be manufactured in accordance with this specification are provided by the DL of the drawing packages, specifications and standards listed thereon. The standard of workmanship and manufacturing exhibited in approved pre-production samples, shall be the standard of workmanship for all production containers.

3.3.3 Workmanship. Workmanship shall be of sufficiently high quality to assure the container will comply with all requirements of this specification. Particular attention shall be paid to bonding, welding, marking and freedom of burrs, chips, cracks, sharp edges, dirt, grease, corrosion, and other foreign matter on all parts. The assembled container shall be thoroughly cleaned of all dirt, chips and other foreign matter. Cleaning methods shall not be injurious to any of the parts or assemblies, nor shall the cleaning agent contaminate the parts.

3.3.4 Welder qualification. Welder operators shall be qualified in accordance with ANSI/AWS

D1.2-2008.

4. QUALITY ASSURANCE PROVISIONS.

4.1 First Article acceptance and tests.

4.1.1 Acceptance. Prior to all tests, the first article containers shall be physically examined for compliance with the documents listed on DL8864811 and DL8864861 respectively. Approval shall consist of a visual inspection of the characteristics and measurement of the component parts and complete container to ensure compliance with the drawings. Measuring instruments sufficient to verify drawing tolerances shall be used. Inspection shall include the availability of instruments sufficient to verify drawing tolerances. Approval shall include the examination of inspection records, material certifications and the comparison of these documents with the item(s) they describe. The Government reserves the right to terminate the inspection and reject the first article sample upon failure of any component, assembly, or test specimen in the preproduction sample to comply with any requirement defined in this specification.

4.1.2 Item interface/fit test. This test shall be conducted by bringing together the container and the intended load. The items shall be placed in position in the containers. The container shall be closed in its normal shipping condition, and secured by fastening all latches. Care shall be exercised to assure that both the container and the load are representative of the final configuration and that normal dimensional variations are considered. Interface dimensions may be dimensionally inspected to verify conformance to drawing requirements. The container shall meet the requirements of 3.2.1.3.1 and 3.2.1.3.2. After tests and measurements are complete, the container shall then be unloaded.

4.1.4 Gasket strength. The gasket shall be subjected to a 20-pound force pull perpendicular to the plane of the splice to verify conformance to 3.2.1.4.

4.1.5 Leak test.

4.1.5.1 Pneumatic pressure technique. The air in the container is pressurized and then the container is observed to detect leaks. A leak is defined as any opening in a container that allows air to escape or permits air to enter. When a container is found to leak, submersion in water, a portable ultra-sonic leak detector, or application of soapy water may be used to locate the leak(s). If leaks are detected the container shall be repaired to eliminate the leaks and then re-tested for verification.

4.1.5.2 Apparatus. A supply of compressed air, pressure gage and fittings, and either a vessel in which the specimen can be submerged in water, a quantity of bubble-supporting liquid, or ultra-sonic leak detector are required to perform this test. Pressure measurement devices may include a water manometer or digital manometer with an accuracy not less than 0.005 psig. The digital manometer, when used, shall be calibrated and certified.

4.1.5.3 Conditioning. No special conditioning of the containers is required; the test shall be performed in normal room condition (70 10 F). The pressure test is very sensitive to heat and cold fluctuations; the temperature shall not be allowed to fluctuate more than 2 during the test.

4.1.5.4 Procedure. The container shall be prepared for the test by sealing all breathing devices and inserting suitable pressurizing fittings and gages. The fittings and gages shall not cause adverse effects on the serviceability of the container. The container shall be closed and sealed, as it would be in service. The test shall be conducted by raising the internal pressure so that the desired pressure differential of 1.0 +0.25/-0.0 psig is obtained. After pressurization, the container shall be left undisturbed for not less than 15 minutes for temperature and pressure stabilization. The pressure shall be monitored for not less than 30 minutes after stabilization. Pressure leakage of more than 0.05 psig in 60 minutes shall be cause for rejection. If there is pressure loss of less than

0.025 psig within 30 minutes, after stabilization, the test may be terminated as successful. The container shall meet the requirements of 3.2.1.2

4.2 Production quality conformance inspection and test.

4.2.1 Inspection. The contractor's inspection system shall be sufficient to ensure that parts and materials submitted conform to the requirements of each design’s DL. The contractor is responsible for furnishing articles that meet all the requirements of drawings and specifications included in this contract. Production shall be performed under controlled conditions. The procedures used for process control and inspection are at the option of the contractor, provided objective, documented evidence is maintained and made available upon request by the Government.

5. PREPARATION FOR DELIVERY

5.1 Preservation and Packing. Containers must be stored in an indoor area prior to delivery. The containers shall be prepared for delivery by installing two 8 unit bags of desiccant (Part number

71030020, Cage 08992) in the desiccant hold area and possibly a new humidity indicator litmus paper if the original one is pink (TA356-HC 345S, Cage 08992). Then the containers shall be stretch or shrink wrapped. All conveyances shall be loaded, blocked and braced in accordance with best commercial practice.

5.2 Marking. Container marking shall be IAW the drawing packages, contract or order. Marking for final delivery shipment shall be IAW best commercial practice. Any marking or labels required for final delivery shipment shall not be placed directly on the containers themselves but can be placed on the outside of the container wrap.