STATEMENT OF WORK FOR
SHIPPING AND STORAGE CONTAINER, ANTENNA, CNU-459/E AND CNU-470/E
27 APRIL 2018
1.0 INTRODUCTION. The Air Force Packaging Technology and Engineering Facility (AFPTEF) has engineering authority for a reusable, long-term shipping and storage containers designed for various APQ-170 assets. The container will provide physical and environmental protection during worldwide transportation and storage for the assets.
2.0 SCOPE. The contractor will be required to:
2.1 Manufacture. The contractor is to manufacture the CNU-459/E and CNU/470/E shipping and storage containers in accordance with:
CNU-459/E:
a. SP8864811 with all associated specifications, standards, and documents.
b. DL8864811 with all associated drawings, parts lists, and documents, respectively.
CNU-470/E:
a. SP8864861 with all associated specifications, standards, and documents.
b. DL8864861 with all associated drawings, parts lists, and documents, respectively.
2.2 Interface. The contractor must provide a point of contact, name, telephone number, email address, and cell phone number if applicable, for interface with AFPTEF. The AFPTEF point of contact will be the program manager. This will insure coordination of actions and requirements are accomplished in a timely and productive manner.
3.0 TASKS.
3.1 General tasks. The contractor shall have in place a management system to provide supplies and services required to fabricate, evaluate, test, produce, and deliver containers in accordance with Prime
Item Product Fabrication Specification SP8864811 and SP8864861 and the contract.
3.1.1 First Article testing and inspection. The contractor shall prepare for and host the first article testing and inspection meeting. One complete set of piece parts and one complete container of each design shall be required for first article testing and inspection to validate the adequacy of the container manufacturing processes and procedures. The contractor shall have all parts laid out in an area of sufficient size to perform the required inspection and measurement. The contractor shall provide measuring instruments sufficient to verify drawing tolerance compliance. These instruments shall be calibrated for accuracy. The contractor shall provide their internal inspection records and material certifications for inspection and comparison of these documents with the items they describe. The contractor shall ensure quality assurance personnel are available during First Article testing and inspection meeting.
3.1.2 Request for Deviation/Waiver and Engineering Change Proposal. No design changes or modifications shall be made without prior approval from the AFPTEF program manager. Proposed changes which effect cost or schedule require formal approval by the government and shall be submitted through the contracting officer. The contractor's request shall state the nature and reasons for the change and the effect of the change on cost and delivery. Engineering change proposals, which have no effect on cost or schedule, may be approved by the AFPTEF program manager/project engineer, and routed through the contracting office.
3.1.3 First Article acceptance and inspection. AFPTEF personnel will perform preliminary (first article) inspection and acceptance of the pre-production units for conformance to the specification, drawings, and contractor inspection records. The contractor shall notify AFPTEF 15 days prior to the date they propose for the inspection, so schedule and travel arrangements may be made.
3.1.4 Production unit acceptance and inspection. The contractor will be notified in writing by the
Contracting Officer within 5 days after first article acceptance to start production of the containers.
AFPTEF will perform final inspection and acceptance of production units.
3.1.5 Rejection of containers. Containers failing to pass the acceptance tests, as outlined in the container fabrication specifications (SP8864811 & SP8864861), may be modified by the contractor and re-tested or another container may be fabricated.
3.1.6 Management and technical meetings. The government or the contractor may call a technical interchange meeting. The location of the meeting will be determined prior to the meeting date or may be accomplished remotely. The contractor shall notify the government 15 days prior to the date they propose for the meeting, so schedule and travel arrangements (if necessary) may be made.
3.2 Detailed Tasks. The contractor shall comply with the following:
3.2.1 Quality assurance. The contractor shall have a quality control plan/system (e.g. SAE-AS 9100 or
ISO 9001) in place for ensuring that the containers meet all specifications and drawing requirements.
3.2.2 Minutes. The contractor shall provide minutes of all meetings, formal reviews, and inspections and present them to the government within 10 days after the event for approval.
3.2.3 Program status reporting. In the event problem areas/slippages are identified/encountered, the contractor shall provide the AFPTEF program manager with a report detailing recovery actions.
3.3 Government Furnished Property (GFP).
3.3.1 Acceptance of GFP. A Ku-Band and X-Band Antenna will be sent to the contractors’ facility for a FA fit check. The contractor is responsible for ensuring the items are not lost or damaged during this time frame.
3.3.2 Disposition of GFP. The contractor will ship the antennas in the containers they were delivered in to the specified address (see section 4.4) after acceptance of FA units.
4.0 Delivery.
4.1 Container First Article/Delivery schedule after contract award.
a. First Article Test and Inspection (Pre-production): Shall be accomplished no later than 12 weeks after contract award.
b. Production: After written authorization to begin production, final delivery shall within 15 weeks.
Accelerated deliveries are possible with approval of the AFPTEF program manager.
4.3 Preservation and packing. Containers must be stored in an indoor area prior to delivery.
Containers shall be shrink wrapped for delivery. All conveyances shall be loaded, blocked and braced in accordance with best commercial practice. It is recommended the humidity indicator litmus paper not be placed in the container until ready for delivery.
4.4 Shipping Address. All containers shall be shipped to the following address:
AFLCMC/EZPAA
5215 Thurlow Street
Suite 5, Bldg. 70, Area A
WPAFB, OH 45433-5540
Attn: Robbin Miller, 937-257-3362