STATEMENT_OF_WORK_FOR_EXTRUSIONS.DOCX
DOCX document 14 KB Posted
- Attached to
- Aluminum Skid, Lid, and Post Extrusions
- Solicitation number
- FA8601-17-T-0239
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20171450.pdf | ||
| Attachment_4_-_52.222-22_&_25.docx | DOCX document | |
| Provisions_and_Clauses.docx | DOCX document | |
| 20171452.pdf | ||
| Attachment_1_-_FAR_52.212-3,_Paragraph_(b).pdf | ||
| 20171451.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR
ALUMINUM SKID AND LID EXTRUSIONS
17 August 2017
1.0 INTRODUCTION.
The Air Force Packaging Technology and Engineering Facility (AFPTEF) uses aluminum extrusions in the design of reusable, long-life shipping and storage containers. The containers provide physical and environmental protection during worldwide transportation and storage.
2.0 SCOPE.
The contractor will be required to extrude Skid, Lid, and post extrusions in accordance with their respective drawings (20171450, 20171451, and 20171452) in 12 foot lengths.
3.0 QUANTITY AND SCHEDULE.
A quantity of the minimum push, as defined by the manufacturer, will be delivered to AFPTEF within 9 weeks of contract award.
4.0 DELIVERY.
4.1 Location. Contractor shall deliver the extrusions to the following address:
| AFLCMC/EZPAA |
| 5215 Thurlow Street |
| Suite 5, Bldg 70, Area A |
| WPAFB, OH 45433-5540 |
| Attn: Brett Baver (937-257-7010) |
4.2 Packing. The contractor shall protect the extrusions for delivery to AFPTEF from scratching due to handling, road debris, and strapping.
File details come from the government source that posted it. Updated .