PWS_Services.docx
DOCX document 30 KB Posted
- Attached to
- Security Camera System & Installation
- Solicitation number
- FA8601-17-R-0032
About this file
Performance Work Statement
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PDS_Solicitation.docx | DOCX document | |
| Attachment_3_-_DFARS_252.209-7991.pdf | ||
| Attachment_1_-_FAR_52.212-3,_Paragraph_(b).pdf | ||
| Attachment_4_-_52.222-22_&_25.docx | DOCX document | |
| Attachment_4_-_52.222-22_&_25.docx | DOCX document | |
| Attachment_1_-_FAR_52.212-3,_Paragraph_(b).pdf | ||
| Attachment_3_-_DFARS_252.209-7991.pdf | ||
| PDS_Solicitation.docx | DOCX document | |
| Attachment_3_-_DFARS_252.209-7991.pdf | ||
| Project_Questions.docx | DOCX document | |
| Attachment_1_-_FAR_52.212-3,_Paragraph_(b).pdf | ||
| PDS_Solicitation.docx | DOCX document | |
| Attachment_4_-_52.222-22_&_25.docx | DOCX document | |
| Attachment_4_-_52.222-22_&_25.docx | DOCX document | |
| PDS_Solicitation.docx | DOCX document | |
| Attachment_1_-_FAR_52.212-3,_Paragraph_(b).pdf | ||
| Attachment_3_-_DFARS_252.209-7991.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
F-15 Monitor/Cameras Solution
AT
Wright-Patterson AFB, OH Building 553
PERFORMANCE-BASED WORK STATEMENT
TABLE OF CONTENTS
SECTION PAGE
| 1 DESCRIPTION OF SERVICES | 3 |
| 2 GENERAL INFORMATION | 3 |
| 3 SERVICES SUMMARY | 5 |
| 4 GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES | 6 |
DESCRIPTION OF SERVICES: The contractor shall provide all management, tools, supplies, equipment, and labor necessary to install an operational system that consists of 2 mini-dome cameras, a 40” or greater LED monitor, and all necessary wiring and components. A Warranty on the equipment is also necessary.
PERIOD OF PERFORMANCE: Performance period for this contract will be no more than 10 days from the date of award, and will run continuously for no more than two weeks, with the provision for a one time extension of this contract for an additional two week period.
SPECIFIC REQUIREMENTS
The contractor shall be responsible for the overall installation of all camera viewing systems equipment.
The contractor shall provide and install two Analog Mini-dome Cameras with 700TVL or above.
The contractor shall provide one quad view adapter.
The contractor shall provide one power supply adapter.
The contractor shall provide one BNC connector – 10 each The contractor shall provide one 40” or greater HD LED monitor.
The contractor shall provide all necessary cables/wires, monitor mount, camera mounts, and any other small parts necessary to make the system fully operational. The work will be completed in building 556, on Wright-Patterson AFB, OH in Area B.
GENERAL INFORMATION:
HOURS OF OPERATION: Contractor Personnel shall be readily available 5 days a week at the site from 0800-1900. Concessions are made for religious holidays, at the discretion of the Government, when it does not interfere with operations.
Emergency Services: On occasion, services may be required to support an activation or exercise of contingency plans outside the normal duty hours described above.
Removing objects from refuse for personal use is unauthorized. Contractor Personnel may request items through unit designee. Violations are grounds for termination.
At no time, without authorization, will a Contractor Personnel purchase any items from the local economy for any US Personnel.
Standards of Conduct: Contractor Personnel must adhere to standards of conduct as established by the Installation Commander.
Security Requirements: Contractor shall adhere to current installation security policies.
The contractor shall provide an interpreter if English is not the primary language of the workers. The interpreter shall be on site at all times.
RECORDS: N/A
SAFETY PLAN: Not applicable
SPECIAL QUALIFICATIONS: None.
SERVICES SUMMARY:
Comment by SMITH, ROBIN A USAF AFMC AFLCMC/PZIOA: The language in this Services Summary Chart does not match the language in the QASP Services Summary chart. They both need to be identical. Please review entire chart to make sure they match.
Objective
| PWS Para | |
| Performance Threshold | |
| Method of | Comment by SMITH, ROBIN A USAF AFMC AFLCMC/PZIOA: Delete these last two columns from the PWS. Only the first three columns as shown go in the PWS. However, all five columns go in the QASP. |
Rationale: The PWS is attached to, and becomes part of the contract. It cannot be changed without agreement from the Contractor; which would require a contract modification. The QASP is a living document; not part of the contract. It can be changed by the COR and PCO at any time as necessary for quality assurance reasons with issuing a contract modification. The QASP is used to inspect the contractor. The COR may decide later on that a better “Method” and/or “Remedy” is required, and not having them included in the PWS makes correcting/changing it easier. This is standard practice.
Assessment Remedy
SS-1 The contractor shall be responsible for the overall installation of all camera viewing systems equipment.
| 1.2.1 |
| 100% Compliance |
| Customer Complaint |
| Re-performance |
| SS-2 The contractor shall provide and install two Analog Mini-dome Cameras with 700TVL or above. |
| 1.2.2 |
| 100% Compliance |
| 100 % Inspection |
| Re-performance |
| SS-3 The contractor shall provide one quad view adapter. |
| 1.2.3 |
| 100% Compliance |
| 100 % Inspection |
| Re-performance |
SS-4 The contractor shall provide one power supply adapter.
| 1.2.4 |
| 100% Compliance |
| 100% Inspection |
| Re-performance |
| SS-5 The contractor shall provide one BNC connector – 10 each |
| 1.2.6 |
| 100% Compliance |
| 100% Inspection |
| Re-performance |
| SS-6 The contractor shall provide one 40” or greater HD LED monitor. |
| 1.2.7 |
| 100% Compliance |
| 100% Inspection |
| Re-performance |
| SS-7 The contractor shall provide all necessary cables/wires, monitor mount, camera mounts, and any other small parts necessary to make the system fully operational. The work will be completed in building 556, on Wright-Patterson AFB, OH in Area B. |
| 1.2.8 |
| 100% Compliance |
| 100% Inspection |
| Re-performance |
GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES: The US Government will not provide any equipment, fuel, personnel, utilities or facilities to the contractor for the execution of this contract. Should an emergency arise, only the necessary basic life-saving and life support measures will be provided during the emergency.
File details come from the government source that posted it. Updated .