Defense Acquisition University – Midwest Region 3100 Research Blvd. (Pod 3)

Kettering, OH 45420 11 July 2016

Scope of Work: The Contractor shall supply all tools, labor, materials, transportation, and supervision to complete the requirements in this Statement of Work (SOW). The SOW is broken down by room / area and what is to be done in that space. The list for each space should be all inclusive. All exterior room (202, 206, 218, 219, 220, 222, 224, 225, 226, 227) blinds will be inspected, cleaned, repaired and replaced as needed. Large custom white boards in classrooms will not be removed. All exposed columns in rooms 220, 221, 222, 223, 224, 225 will be protected from chairs chipping the paint. The method of protection for the columns is not specified to allow various methods to be presented. All room identification and wayfinding signage will be replaced to match the new finishes with ASI Modulex Pacific Interior wall mounted modular signage system.

Rooms:

202 – Storage Room

‐ Install new VCT tile over the current concrete floor.

‐ Install vinyl base ‐ Move items from storage area and back to storage area after work is complete.

206 – Break Room ‐ Remove the L partition and install a new straight partition to make this one area.

‐ Maintain all electrical and data that is in the L partition.

‐ Remove old tile ‐ Install new VCT tile ‐ Remove old cabinets ‐ Install new cabinets (same dimensions)

218-219 – Offices

‐ Remove Floor Electric Boxes ‐ Fill Core Holes

220 & 225 – Classrooms

‐ Install some form of protection for round columns from chairs

‐ Add Coat Racks for up to 40 people

222 & 224 – Classrooms ‐ Install some form of protection for round columns from chairs

221 & 223 – Classrooms

‐ Electrical – Existing core holes filled, 7 new core drills in each room with 6 outlets each.

226 – Classroom ‐ Move Projection Screen to

Opposite end of Room

Finishes:

Code Material Description F-2 VCT Manufacturer: Armstrong – Excelon Stonetex

No./Color: TBD Product Details: 12”x12”

B-1 Vinyl Base

Manufacturer: Johnsonite No./Color: #283 Toast Product Details: 4” Cove-Rubber

PL-1 Cabinets Interior: White Melamine Exterior: Nevamar #W-8-325T Sovereign Cherry Pulls: 4” Brushed Chrome Wire Pulls

PL-2 Counters P. Laminate: Formica #3445-RD Mineral Ochre DS-1 Signs Manufacturer: ASI-Modulex

Style: Pacific Interior Size: 3.5” x 6” ADA Panel w/1”HM number 3.5” x 6” window Color: SC-904 Dark Grey Lettering: SC-806 Lt. Beige

DS-2 Signs Manufacturer: ASI-Modulex Style: Pacific Interior Size: 6” x 6” ADA Panel (Restrooms) 2” x 6” w/ 5/8” HM (Men / Women) Color: SC-904 Dark Grey Lettering: SC-806 Lt. Beige

DS-3 Signs Manufacturer: ASI-Modulex Style: Pacific Interior Size: 6” x 6” ADA Panel (Stairs) 2” x 6” w/ 5/8” HM (“Stair 1” / “Stair 2”) Color: SC-904 Dark Grey Lettering: SC-806 Lt. Beige

DS-4 Signs Manufacturer: ASI-Modulex Style: Pacific Interior Size: 2” x 12” Panel (Wayfinding) Color: SC-904 Dark Grey Lettering: SC-806 Lt. Beige

CR-1 Coat Rack

Manufacturer: Magnuson Group Style: DS-6H Powder Coat Hanger Style Wall Rack Size: 72” W x 6.5” H x 11.5” D Color: Black PWC

Other Instructions:

a. Expected Completion Date: 1 October 2016

b. Work Schedule: Majority of work can be done during normal operating hours, M-F 6:00 A.M. to 6:00 P.M. excluding federal holidays. Coordination will be required for schedule after award of contract to ensure that work will not interfere with operations.

c. Primary entrance to the building for contractor use will be through the loading dock area. The loading dock is on the same level of the building as the work to be completed.

d. All construction debris and waste is to be removed by the contractor. Any excess paint, tile, vinyl base or other material that could be used will be left with the building management for their maintenance use in the future.

e. DS-1 Signs required: 20 sets (202, 206, 212, 213, 214, 215, 216, 217, 218, 219, 220, 221, 222, 223, 224, 225, 226, 227, 229, 231)

f. DS-2 Signs required: 4 sets (2 Men’s & 2 Women’s)

g. DS-3 Signs required: 2 sets (Stairs)

h. DS-4 Signs required: 3 each (< 215 – 222, > 223 – 227, > 212 – 214) on a single wall mount.

i. CR-1 Coat Rack: 2 each (These hanging garment rack units are all powder coated steel with nickel chrome plated 1" hanger bar and this DS-6H model is 6 feet in length.)