17._RFI_responses_are_to_be_posted_to_FBO.pdf
PDF 37 KB Posted
- Solicitation number
- FA8601-15-R-0049
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FFPAddendum02.pdf | ||
| Amendment_2.pdf | ||
| Addendum_1.pdf | ||
| Wage_Determination_OH20140114_Revised.pdf | ||
| Signed_Amendment_1.pdf | ||
| 16._Rules_of_Engagement.rtf | RTF text file | |
| Site_Visit_Participant_List.pdf | ||
| Specifications.pdf | ||
| FA8601-15-R-0049.pdf | ||
| Drawings.pdf | ||
| General_Decision_Number_OH150114_1_May_15.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) Are we to reuse the existing support structure for the new cooling tower?
Response - Yes.
2) Item #0003 and #0004 are worded exactly the same on the bid form. Please explain the difference in these two items.
Response – Each of these line items represents one month of service.
3) The condenser water filter schedule is based on a granular media type, but the spec (23 65 00,2.7.6.1) talks about centrifugal action separators. What type of separator is required?
Response – The condenser water solids removal system shall be as indicated on the schedule shown on drawing sheet M-601. An addendum will be issued to remove all of section 2.7.6.1 of specification section 23 65 00.
File details come from the government source that posted it. Updated .