Pre-Proposal RFI 1 Responses.pdf
PDF 142 KB Posted
- Attached to
- RFI # 1&2 Federal contract opportunity
- Solicitation number
- FA8601-11-B-0005
About this file
RFI 1 Response
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Proposal RFI 2 Response .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 Aug 2011
FA8601-11-B-0005
Maintain Finishes, F/34010 / Project Number: 109012
Pre-Proposal RFI W/ Responses
1. There is military equipment in room 132, will this be removed by the owner? GOV TO
RELOCATE.
2. The prints state that a graphic timeline is to be removed, stored and replaced. What about the rest of the memorabilia on the walls throughout the facility? REFER TO GENERAL NOTES ON
SHEET G-O.
3. There is stain on the carpet flooring in the vault that the user commented has been bleeding through from underneath. Is the cause of this stain known? STAIN PRESENCE HAS NOT BEEN CONFIRMED AS ALLEGED. BID PROJECT ACCORIDNG TO PROJECT DOCUMENTS. Are there any special prepping requirements for this particular area? SEE RESPONSE IN QUESTION NO. 3
(ABOVE).
4. Will the safes in the vault be removed and replaced by the owner? GOV TO RELOCATE SAFES.
5. Will all of the asbestos containing debris noted above the ceiling need to be abated or just the areas where the ceiling is going to be disturbed due to other scopes of this project? REFER TO
HAZARDOUS MATERIALS PLAN GENERAL NOTES, HAZARDOUS MATERIALS PLAN,
SPECIFICATIONS, ETC.
6. Is there a hazardous material survey for this project? YES.
7. Are there offsite storage areas available if the rooms planned cannot hold all of the staged furniture? NO.
8. How will abatement of the floor tile be able to be performed in the rooms that will be occupied
100% of the time? REFER TO DEMOLITION PLAN & NOTES ON DRAWING SHEET #I-001 AND
HAZARDOUS MATERIAL PLAN & NOTES DRAWING SHEET #G-3 AS WELL AS SPECIFICATIONS.
9. Shaw carpet tiles are specified and will you accept equals to the carpets. I’m a rep with a mill and we would like you to consider our carpet products. Please let me know what I need to do- SPECIFIED
CARPET IS BASIS OF DESIGN OR APPROVED EQUAL. SUBMIT EQUAL FOR APPROVAL FOLLOWING
CONTRACT DOCUMENTATION GUIDELINES/PROCEDURES.
The following two questions were submitted via email from PK dated 8/3/2011.
10. (Email Question #9.) Are there any coatings in the facility that are known to contain lead? REFER TO CONTRACT DOCUMENTS AND SPECIFICATION SECTION 02 09 00 (REMOVAL AND DISPOSAL OF LEAD
CONTAINING MATERIALS INCLUDING LEAD BASED PAINT)/ PARAGRAPH 1.05.10.
11. (Email Question #10.)If no survey is available, are we to test the areas ourselves for the presence of lead paint? REFER TO CONTRACT DOCUMENTS AND SPECIFICATION SECTION 02 09 00 (REMOVAL AND
DISPOSAL OF LEAD CONTAINING MATERIALS INCLUDING LEAD BASED PAINT).