FA857418R0001_______0007.pdf

PDF 45 KB Posted

Attached to
Contractor Logistics Support for JADSI program Federal contract opportunity
Solicitation number
FA857418R0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Amendment 7

View the file

Other files for this federal contract opportunity

Other files attached to Contractor Logistics Support for JADSI program, newest first.
File Type Posted
Redacted_JA_final_signed.pdf PDF
PWSRev6_15Aug18.pdf PDF
FA8574-18-R-0001-0005.pdf PDF
PWS_Revision_4.pdf PDF
FA857418R0001_______0004.pdf PDF
FA857418R00010003.pdf PDF
PWS_REV_3.pdf PDF
FA857418R0001_______0002.pdf PDF
Revised_CDRLs.pdf PDF
FA8574-18-R-0001-0001.pdf PDF
PWS_Revision_3.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

U

2. AMENDMENT/MODIFICATION NO.

FA8574-18-R-0001-0007

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

N/A

6. ISSUED BY CODE

AVIONICS, AFLCMC/WNKE C31N

235 BYRON ST STE 19A

BLDG 301 CML PHN 478 926 7462

ROBINS AFB GA 31098-1670

BUYER: Carrie J. Comstock, Capt, USAF carrie.comstock@us.af.mil Phone: (478) 926- 1390 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8574

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA857418R0001

9B. DATED (SEE ITEM 11)

14-AUG-2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

Joint Air Defense System Integrator (JADSI)

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to revise the pricing arrangement, add a clause, add a CLIN, and revise the PWS.

A. Change the pricing arrangement, as seen in Section B, of CLINs X004, X005, and X009

FROM: FFP

TO: CPFF, To Be Negotiated

B. Add CLIN X011, Variable Engineering (To Be Negotiated), as seen in Section B.

C. Add Clause DFARS 252.242-7006, Accounting System Administration, as seen in Section I.

D. Incorporate PWS Revision 6, dated 15 August 2018, and supersede all previous versions as seen in Section J.

E. All other terms, conditions, and provisions of the solicitation remain unchanged.

Note: Amendment 0006 was skipped for administrative purposes.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Software Block Cycle Update

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Software Block Cycle Updates IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Tech Order/Manuals

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Tech Order/Manuals IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Tech Order/Manuals

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Testing

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Testing IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Variable Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Variable Engineering IAW PWS Revision 6, dated 15 Aug 18.

Variable Engineering

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Software Block Cycle Update

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Software Block Cycle Updates IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Tech Order/Manuals

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

Tech Order/Manuals

1 LO To be Negotiated

Provide Tech Order/Manuals IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Testing

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Testing IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

Testing

1 LO

Variable Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Variable Engineering IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Software Block Cycle Update

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Software Block Cycle Updates IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders

Software Block Cycle Update

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Tech Order/Manuals

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Tech Order/Manuals IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Testing

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Testing IAW PWS PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

Testing

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Variable Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Variable Engineering IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of

1 LO

Software Block Cycle Update

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Software Block Cycle Updates IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Tech Order/Manuals

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Tech Order/Manuals IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of

1 LO

Testing

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Testing IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Variable Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Variable Engineering IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders

Variable Engineering

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Software Block Cycle Update

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Software Block Cycle Updates IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Tech Order/Manuals

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Tech Order/Manuals IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None

Tech Order/Manuals

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Testing

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated

Provide Testing IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

Variable Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

Variable Engineering

1 LO To be Negotiated

Provide Variable Engineering IAW PWS Revision 6, dated 15 Aug 18.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 LO TBC

Proposed Period of Performance

1 LO

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

252.242-7006 ACCOUNTING SYSTEM ADMINISTRATION (FEB 2012)

(IAW DFARS 242.7503)

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Form Number Description/File Name Date Number of Pages PWS REV 6 PWSRev6_15Aug18.pdf 15AUG2018 19

File details come from the government source that posted it.