About this file

This is a Purchase Description Questionnaire for a federal equipment procurement by the 402d Maintenance Group (MXSG) at Robins Air Force Base in Georgia, dated August 11, 2026.

The requirement is for the purchase of three (3) RANGER Crew XP 1000 NorthStar Edition vehicles in Stealth Gray, along with associated accessories including Polaris Ranger-8 Pin Turn Kits (qty 3), K-Beacon Pulse units (qty 3), K-ACCY EXT CREW ZS accessories (qty 3), and Street Tires (3 sets). The government states that market research determined Polaris Ranger is the only solution satisfying technical requirements for enclosed climate stability and durability to transport up to six personnel for the 402 MXSG/MXDE CBR team, replacing an aging Club Car golf cart fleet. The items have no National Stock Numbers and cannot be sourced through base supply. The requirement includes all materials, parts, travel, tools, training, and labor necessary for purchase. No scheduled preventative or corrective maintenance, installation, or training is required. Delivery is required to Robins AFB with a loading dock available; contractor hours of performance are 0600-1400. The warranty is one year from ship date, and no specific deliverables through CDRLs are needed. The realistic need date is 60 days after contract award. No government-furnished property, network access, security clearance, or classified information is involved. Primary point of contact is Eric Smith (478-926-8976; eric.smith.99@us.af.mil) and alternate is Brian Fullington (478-222-6579; brian.fullington@us.af.mil). The delivery address is 402 MXSG/MXDE, Building 321, Suite 100, Robins AFB, Georgia 31098, with DoDAAC F3QCCM. The requirement has been approved by 78 LRS/LGRVM as a non-vehicle equipment item.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchase Description Questionnaire

RANGER Crew XP 1000 NorthStar Edition Premium

08/11/2026

ALL QUESTIONS MUST BE ANSWERED

DESCRIPTION: The Contractor shall provide to the 402d Maintenance Group (MXSG) at Robins Air Force Base all materials, parts, travel, tools, training, and labor necessary for the purchase of RANGER Crew XP 1000 NorthStar Edition Stealth Gray.

Included items:

(List items that must be included such as add-ons/accessories or write NONE if not applicable).

Description Qty. Serial # Part #

• RANGER Crew XP 1000 NorthStar Edition Stealth Gray

3 R27RSU99AH

Polaris Ranger-8 Pin Turn Kit 3 TSK-1908

K-Beacon, Pulse 3 2884609

• K-ACCY, EXT, CREW, ZS 3 2883231

• Street Tires 3 sets utvs0084495

1. Equipment Manager in LRS at 78lrs.lgrm.eao@us.af.mil prior to procuring any equipment items. Yes

2. Does the item(s) have a National Stock Number (NSN) and/or could be sourced through local base supply? If yes, contact base supply at 78lrs.cust.suppt@us.af.mil.

No NSN

We currently possess an aging fleet of Club Car golf carts. The procurement of seven

(9) Polaris Ranger 6-Passenger carts with factory-installed Climate Control (AC/Heat) is required to meet specific mission-critical environmental standards for the transport of Engineering personnel. Polaris Ranger (Brand Name) meets our demand for transporting up to six (6) personnel required for 402 MXSG/MXDE CBR team.

mailto:78lrs.lgrm.eao@us.af.mil mailto:78lrs.cust.suppt@us.af.mil

Market research indicates that the Polaris Ranger is the only solution that satisfies the technical requirements for enclosed climate stability and durability while remaining the most cost-effective option to transport up to six team members. The Polaris Ranger chassis is built for the rigors of base-wide utility work, ensuring a longer service life and reduced maintenance compared to lighter-duty commercial golf carts. Market research has determined that the Polaris solution. While the Club Car alternative was analyzed, it failed to meet the specific technical threshold for carrying up to 6 crew members in an enclosed integrated climate control cart. The installation currently possesses technical expertise, specialized tooling, and parts inventory to maintain Polaris platforms.

3. Does your requirement require any scheduled preventative/corrective maintenance? Specify?

No

4. Does your requirement require an Asset Acquisition Approval (AAA) or IT Exemption Letter?

(If your requirement is something that has the potential to be connected to the network, then it requires an AAA.)

No

• Software = ALWAYS YES

• Hardware = Can it be connected to the network? (i.e. Does it have a USB po1i?)

• Will the Contractor require access to the Robins AFB network?

5. Does your requirement create or modify real prope1iy? Cutting, drilling, digging, major install, involving utilities or equipment involving utilities (power tie-in/water/etc.)

No If yes, attach a NexGen (formerly Tririga) to your

• Who will provide the hookups/HVAC/COMM/IT/electricity/fire suppression system, etc.

(Government or Contractor)

6. What is the warranty? (example - standard 12-month parts and labor warranty) 1 Year from Ship Date

7. Do you need specific deliverables through CDRLs? (Status Report, Calibration Certificate, COTS Manual, etc.)

No

8. Do you need a vendor site visit? No

• Is the site visit needed before or after contract award?

B. GOVERNMENT FURNISHED PROPERTY (GFP):

NOTE: If an asset will be leaving RAFB property.

1. Will the Government provide Government Furnished Property (GFP)? (If yes, the mandatory GFP Worksheet will need to be completed) No

C. GENERAL INFORMATION:

1. Does your requirement require Delivery? Yes

2. What are your delivery specifications?

• Do you have a loading dock? Yes

• Stairs that the Contractor will need to use to carry items up? N/A

• Will an elevator be required to deliver to a certain floor of the building? (Provide detailed delivery instructions.) N/A

• Are we paying for the shipment through other means like GPC? No

• Does the item need to be packed specifically (like in dry ice)? No

3. Does your requirement require Installation, if yes explain? No

4. Does your requirement require Training? No

• How many Government personnel will need training.

• How many days (2-day, 3-day, 1-week, full days, half days, etc.).

5. What are YOUR scheduling requirements? (Contractor’s hours of performance.(ie., 0600-

1600) 0600-1400

• Will the Contractor be escorted?

• If yes, what are the core hours that a Government Representative will be able to escort?

6. Realistic need date: (When do you need this item –2 weeks or 30 days after contract is awarded?

Period of Performance?) 60 days after contract award.

7. Will the Contractor require access to the Robins AFB network? No

8. Does your requirement require the Contractor to have a facility security clearance? If so, what level? No

9. Does your requirement require a DD 254, Contract Security Classification Specification?

(Required when a contract involves classified info.) No

10. Government POCs:

PRIMARY POC:

Attn.: Eric Smith

402 MXSG/MXDXA

420 Richard Ray Blvd.

Bldg. 321 Suite 100 Robins AFB, GA 31098 Commercial phone number: 478-926-8976 Email address: eric.smith.99@us.af.mil

ALTERNATE POC:

Brian Fullington

402 MXSG/MXDSM

420 Richard Ray Blvd Building 321, Suite 100 Robins AFB, GA 31098 Commercial phone number: 478-222-6579 Email address: brian.fullington@us.af.mil

11. Delivery Address:

DoDAAC: F3QCCM Christopher Garnto

402 MXSG/MXDE

402 Richard Ray Blvd Building 321, Suite 100 Robins AFB, GA 31098

12. Place of Performance:

• Bldg. (What Bldg. is the contractor going to be working/installing/etc.? (If they are not coming on base or if item is just being delivered say NONE.) N/A

13. Does your requirement have Controlled Unclassified Information (CUI), Yes or No?

Note: Do not list your classified information on this document, work with the MAPO PM once your requirement has been assigned. No

14. Can this be purchased through a weapon system contracting office (i.e. C-5, C-17, C-130, F-15, etc.)? If yes, work with the appropriate office for your requirements. No

15. For Equipment, has 78 LRS/LGRVM ever approved this as a non-vehicle equipment item (Mitch Moody or Elizabeth Noblitt)? Yes

D. APPENDICES:

mailto:eric.smith.99@us.af.mil

No NSN
No
No
No
If yes, attach a NexGen (formerly Tririga) to your
1 Year from Ship Date
No
B. GOVERNMENT FURNISHED PROPERTY (GFP):
C. GENERAL INFORMATION:
PRIMARY POC:
ALTERNATE POC:
Note: Do not list your classified information on this document, work with the MAPO PM once your requirement has been assigned. No

D. APPENDICES:

File details come from the government source that posted it. Updated .