BAF 77363 Purchase Description Questionnaire ver C 12092025.docx
DOCX document 39 KB Posted
- Attached to
- Revised - NEW DOOSAN BOBCAT BC30S-7 36V ELECTRIC 6, 000 LB. CAPACITY FORKLIFT Robins AFB
- Solicitation number
- FA857126Q0023
About this file
The document is a Purchase Description Questionnaire for a specific forklift procurement by the 402d Commodities Maintenance Group at Robins Air Force Base. The requirement is for one Doosan Brand Model BC30S-7 36-volt electric forklift with 6,000-pound capacity, featuring detailed specifications including a UL-rated battery, oil-cooled disc brakes, a 2-stage standard wide view mast, integrated sideshifting fork positioner, and various accessories like front/rear LED work lights, amber strobe warning lights, and a back-up alarm. The forklift comes with a standard 2-year/3,000-hour warranty and 3-year/6,000-hour powertrain warranty.
The solicitation (FA857126Q0023) is a combined synopsis/solicitation processed under FAR Part 12, seeking a brand-name forklift with specific requirements. Delivery is expected 180 days after award (ARO), and the procurement is managed by the Department of the Air Force Materiel Command Air Force Sustainment Center. No government-furnished property is required, and the contractor will not need network access or facility security clearance. The primary point of contact is Alan Scarborough, with delivery to be made to Building 169 at Robins Air Force Base in Georgia, with specific delivery instructions provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA857126Q00230001 final.pdf | ||
| BAF 77363 Purchase Description Questionnaire ver B 11192025.docx | DOCX document | |
| Solicitation - FA857126Q0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase Description Questionnaire 6K Electric Forklift – BAF # 77363 November 18, 2025
A. DESCRIPTION: The Contractor shall provide to the 402d Commodities Maintenance Group (CMXG), Robins Air Force Base, all materials, parts, travel, tools, and shipping necessary to provide one (1) Doosan Brand Model BC30S-7 36 volt electric 6000 pound capacity forklift. (State the commodity/service required in this acquisition, along with the organization purchasing the commodity/service. Write in terms of deliverables and specifications of the deliverables therein. Describe your acquisition in a logical, organized manner.)
Included items:
One (1) Doosan Brand Model BC30S-7 36 volt electric 6000 pound capacity forklift with the following configuration/accessories:
| UL Rating | UL Rated Type EE | |||||
| Battery Compartment | 40.0"W x 34.5"L x 21.4"H | |||||
| Battery Connector Type | 350 SB - Gray - 36V | |||||
| Brakes | Oil-Cooled Disc Brakes | |||||
| Environmental | Cold Storage Option Tires Narrow - Smooth Drive / Smooth Steer | |||||
| Mast | 2-Stage Standard Wide View Max Fork Height 127" Overall Lowered Height 83" Free Lift 6" | |||||
| Tilt Cylinders | 6° Forward / 10° Back | |||||
| Sideshifter | Integral Sideshifting Fork Positioner 42" Wide - Class III Carriage | Included with Integral Attachment | ||||
| Forks | Hook Type - Pallet – 2.0" x 5" x 72" | |||||
| Load Backrest | Included with Fork Positioner | |||||
| Overhead Guard | 87" Standard Height | |||||
| Hydraulic Lines | 4-Way For Sideshifting Fork Positioner | |||||
| Hydraulic Control Valve | 4 Section with 4 Levers with Direction Control Switch Mirrors | Large Rear View Mirrors | ||||
| Seat | Vinyl Suspension Seat | |||||
| Grab Bar | Rear Grab Bar with Horn Button | |||||
| Warning Lights | Strobe - Amber - Mounted Below OHG | |||||
| Warning Device | Back-Up Alarm | |||||
| Front Work Lights | (2) Front Flood Lights - LED | |||||
| Rear Work Lights | (1) Rear Flood Light - LED | |||||
| Warranty | Bobcat Assurance - Standard 2 Year / 3,000 Hour, Powertrain 3 Year / 6,000 Hour | |||||
| Battery | 36 Volt, 1190 AH (38.25" x 33.75" x 22.63" / 3,450 lb.) Watering System | Flow-Rite Controls Meets Requirements of ANSI B56.1 |
| Charger | Three Phase, 480V | ||||
| Configured Options | DC/DC Voltage Converter Steering Wheel Knob | Steering | |||
| Wheel Knob | Equipped | ||||
| Operator Restraint System | ELR Type Orange Seat Belt | ||||
| Start / Run Switch | Keyed | ||||
| ANSI / ITSDF B56.1 | Forklift Meets Requirements of ANSI/ITSDF B56.1 Paint | Bobcat High Visibility White Paint | |||
| Manuals | (1) Operators / Maintenance |
1. Does the item(s) have a National Stock Number (NSN) and/or could be sourced through local base supply? If yes, contact base supply. NO
2. Does your requirement require any scheduled preventative/corrective maintenance? Specify? NONE
3. Does your requirement require an ITAP or IT Exemption Letter? (If your requirement is something that has the potential to be connected to the network, then it requires an ITAP.) NO
· Software = ALWAYS YES
· Hardware = Can it be connected to the network? (i.e. Does it have a USB port?)
· Will the Contractor require access to the Robins AFB network?
4. Does your requirement create or modify real property? Cutting, drilling, digging, major install, involving utilities or equipment involving utilities (power tie-in/water/etc.) NO
· If yes, attach a Tririga to your package
· Who will provide the hookups/HVAC/COMM/IT/electricity/fire suppression system, etc. (Government or Contractor)
5. What is the warranty? (example - standard 12-month parts and labor warranty) Standard 2 year / 3000 hours, 3 year / 6000 hour powertrain
6. Do you need specific deliverables through CDRLs? (Status Report, Calibration Certificate, COTS Manual, etc.) No
7. Do you need a vendor site visit? NO
B. GOVERNMENT FURNISHED PROPERTY (GFP):
1. Will the Government provide Government Furnished Property (GFP)? (If yes, the mandatory GFP Worksheet will need to be completed) None
C. GENERAL INFORMATION:
1. Does your requirement require Delivery? Yes
2. What are your delivery specifications?
· Do you have a loading dock? No
· Stairs that the Contractor will need to use to carry items up? None
· Will an elevator be required to deliver to a certain floor of the building? (Provide detailed delivery instructions.) No
· Are we paying for the shipment through other means like GPC? No, included
· Does the item need to be packed specifically (like in dry ice)? No
3. Does your requirement require Installation, if yes explain? No
4. Does your requirement require Training? No
· How many Government personnel will need training.
· How many days (2-day, 3-day, 1-week, full days, half days, etc.).
5. What are YOUR scheduling requirements? (Contractor’s hours of performance—i.e., 0800-1600)
· Will the Contractor be escorted? Yes
· If yes, what are the core hours that a Government Representative will be able to escort? 0600 - 1430
6. Realistic need date: (When do you need this item –2 weeks or 30 days after contract is awarded? Period of Performance?) 180 days after award
7. Will the Contractor require access to the Robins AFB network? No
8. Does your requirement require the Contractor to have a facility security clearance? If so, what level? None
9. Government POCs:
PRIMARY POC:
Attn.: Alan Scarborough
402 CMXG
450 First Street Bldg 169 Robins AFB, GA 31098 Commercial phone number: 478-222-4405 Email address: alan.scarborough@us.af.mil
ALTERNATE POC:
Mathew Harley
402 CMXG
450 First Street Bldg 169 Robins AFB, GA 31098 Commercial phone number: 478-222-4779 Email address: matthew.harley.2@us.af.mil
10. Delivery Address:
DoDAAC: F3QCCM
402 CMXG
450 1st St.
Bldg. 169, West End Roll up door Robins AFB, GA 31098
11. Place of Performance: NONE
· Bldg. # (What Bldg. is the contractor’s going to be working/installing/etc.? (If they are not coming on base or if item is just being delivered say NONE.)
12. Does your requirement have Controlled Unclassified Information (CUI), Yes or No? No Note: Do not list your classified information on this document, work with the MAPO PM once your requirement has been assigned.
13. Can this be purchased through a weapon system contracting office (i.e. C-5, C-17, C-130, F-15, etc.)? If yes, work with the appropriate office for your requirement. No
14. For Equipment, has 78 LRS/LGRVM ever approved this as a non-vehicle equipment item (Mitch Moody or Jennifer Nesbitt)? Yes
D. APPENDICES:
(Attached any military specifications, maps, drawings, etc. and list them here?) None Last Updated: 15 Jun 2023
File details come from the government source that posted it. Updated .