BAF 77363 Purchase Description Questionnaire ver C 12092025.docx

DOCX document 39 KB Posted

Attached to
Revised - NEW DOOSAN BOBCAT BC30S-7 36V ELECTRIC 6, 000 LB. CAPACITY FORKLIFT Robins AFB
Solicitation number
FA857126Q0023
Issued by

About this file

The document is a Purchase Description Questionnaire for a specific forklift procurement by the 402d Commodities Maintenance Group at Robins Air Force Base. The requirement is for one Doosan Brand Model BC30S-7 36-volt electric forklift with 6,000-pound capacity, featuring detailed specifications including a UL-rated battery, oil-cooled disc brakes, a 2-stage standard wide view mast, integrated sideshifting fork positioner, and various accessories like front/rear LED work lights, amber strobe warning lights, and a back-up alarm. The forklift comes with a standard 2-year/3,000-hour warranty and 3-year/6,000-hour powertrain warranty.

The solicitation (FA857126Q0023) is a combined synopsis/solicitation processed under FAR Part 12, seeking a brand-name forklift with specific requirements. Delivery is expected 180 days after award (ARO), and the procurement is managed by the Department of the Air Force Materiel Command Air Force Sustainment Center. No government-furnished property is required, and the contractor will not need network access or facility security clearance. The primary point of contact is Alan Scarborough, with delivery to be made to Building 169 at Robins Air Force Base in Georgia, with specific delivery instructions provided in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchase Description Questionnaire 6K Electric Forklift – BAF # 77363 November 18, 2025

A. DESCRIPTION: The Contractor shall provide to the 402d Commodities Maintenance Group (CMXG), Robins Air Force Base, all materials, parts, travel, tools, and shipping necessary to provide one (1) Doosan Brand Model BC30S-7 36 volt electric 6000 pound capacity forklift. (State the commodity/service required in this acquisition, along with the organization purchasing the commodity/service. Write in terms of deliverables and specifications of the deliverables therein. Describe your acquisition in a logical, organized manner.)

Included items:

One (1) Doosan Brand Model BC30S-7 36 volt electric 6000 pound capacity forklift with the following configuration/accessories:

UL RatingUL Rated Type EE
Battery Compartment40.0"W x 34.5"L x 21.4"H
Battery Connector Type350 SB - Gray - 36V
BrakesOil-Cooled Disc Brakes
EnvironmentalCold Storage Option Tires Narrow - Smooth Drive / Smooth Steer
Mast2-Stage Standard Wide View Max Fork Height 127" Overall Lowered Height 83" Free Lift 6"
Tilt Cylinders6° Forward / 10° Back
SideshifterIntegral Sideshifting Fork Positioner 42" Wide - Class III CarriageIncluded with Integral Attachment
ForksHook Type - Pallet – 2.0" x 5" x 72"
Load BackrestIncluded with Fork Positioner
Overhead Guard87" Standard Height
Hydraulic Lines4-Way For Sideshifting Fork Positioner
Hydraulic Control Valve4 Section with 4 Levers with Direction Control Switch MirrorsLarge Rear View Mirrors
SeatVinyl Suspension Seat
Grab BarRear Grab Bar with Horn Button
Warning LightsStrobe - Amber - Mounted Below OHG
Warning DeviceBack-Up Alarm
Front Work Lights(2) Front Flood Lights - LED
Rear Work Lights(1) Rear Flood Light - LED
WarrantyBobcat Assurance - Standard 2 Year / 3,000 Hour, Powertrain 3 Year / 6,000 Hour
Battery36 Volt, 1190 AH (38.25" x 33.75" x 22.63" / 3,450 lb.) Watering SystemFlow-Rite Controls Meets Requirements of ANSI B56.1
ChargerThree Phase, 480V
Configured OptionsDC/DC Voltage Converter Steering Wheel KnobSteering
Wheel KnobEquipped
Operator Restraint SystemELR Type Orange Seat Belt
Start / Run SwitchKeyed
ANSI / ITSDF B56.1Forklift Meets Requirements of ANSI/ITSDF B56.1 PaintBobcat High Visibility White Paint
Manuals(1) Operators / Maintenance

1. Does the item(s) have a National Stock Number (NSN) and/or could be sourced through local base supply? If yes, contact base supply. NO

2. Does your requirement require any scheduled preventative/corrective maintenance? Specify? NONE

3. Does your requirement require an ITAP or IT Exemption Letter? (If your requirement is something that has the potential to be connected to the network, then it requires an ITAP.) NO

· Software = ALWAYS YES

· Hardware = Can it be connected to the network? (i.e. Does it have a USB port?)

· Will the Contractor require access to the Robins AFB network?

4. Does your requirement create or modify real property? Cutting, drilling, digging, major install, involving utilities or equipment involving utilities (power tie-in/water/etc.) NO

· If yes, attach a Tririga to your package

· Who will provide the hookups/HVAC/COMM/IT/electricity/fire suppression system, etc. (Government or Contractor)

5. What is the warranty? (example - standard 12-month parts and labor warranty) Standard 2 year / 3000 hours, 3 year / 6000 hour powertrain

6. Do you need specific deliverables through CDRLs? (Status Report, Calibration Certificate, COTS Manual, etc.) No

7. Do you need a vendor site visit? NO

B. GOVERNMENT FURNISHED PROPERTY (GFP):

1. Will the Government provide Government Furnished Property (GFP)? (If yes, the mandatory GFP Worksheet will need to be completed) None

C. GENERAL INFORMATION:

1. Does your requirement require Delivery? Yes

2. What are your delivery specifications?

· Do you have a loading dock? No

· Stairs that the Contractor will need to use to carry items up? None

· Will an elevator be required to deliver to a certain floor of the building? (Provide detailed delivery instructions.) No

· Are we paying for the shipment through other means like GPC? No, included

· Does the item need to be packed specifically (like in dry ice)? No

3. Does your requirement require Installation, if yes explain? No

4. Does your requirement require Training? No

· How many Government personnel will need training.

· How many days (2-day, 3-day, 1-week, full days, half days, etc.).

5. What are YOUR scheduling requirements? (Contractor’s hours of performance—i.e., 0800-1600)

· Will the Contractor be escorted? Yes

· If yes, what are the core hours that a Government Representative will be able to escort? 0600 - 1430

6. Realistic need date: (When do you need this item –2 weeks or 30 days after contract is awarded? Period of Performance?) 180 days after award

7. Will the Contractor require access to the Robins AFB network? No

8. Does your requirement require the Contractor to have a facility security clearance? If so, what level? None

9. Government POCs:

PRIMARY POC:

Attn.: Alan Scarborough

402 CMXG

450 First Street Bldg 169 Robins AFB, GA 31098 Commercial phone number: 478-222-4405 Email address: alan.scarborough@us.af.mil

ALTERNATE POC:

Mathew Harley

402 CMXG

450 First Street Bldg 169 Robins AFB, GA 31098 Commercial phone number: 478-222-4779 Email address: matthew.harley.2@us.af.mil

10. Delivery Address:

DoDAAC: F3QCCM

402 CMXG

450 1st St.

Bldg. 169, West End Roll up door Robins AFB, GA 31098

11. Place of Performance: NONE

· Bldg. # (What Bldg. is the contractor’s going to be working/installing/etc.? (If they are not coming on base or if item is just being delivered say NONE.)

12. Does your requirement have Controlled Unclassified Information (CUI), Yes or No? No Note: Do not list your classified information on this document, work with the MAPO PM once your requirement has been assigned.

13. Can this be purchased through a weapon system contracting office (i.e. C-5, C-17, C-130, F-15, etc.)? If yes, work with the appropriate office for your requirement. No

14. For Equipment, has 78 LRS/LGRVM ever approved this as a non-vehicle equipment item (Mitch Moody or Jennifer Nesbitt)? Yes

D. APPENDICES:

(Attached any military specifications, maps, drawings, etc. and list them here?) None Last Updated: 15 Jun 2023

File details come from the government source that posted it. Updated .