Purchase_Description.pdf
PDF 42 KB Posted
- Attached to
- FliteScene Software, Integration and Training
- Solicitation number
- FA8571-15-T-0006
About this file
Purchase Description
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRODUCT DESCRIPTION
FLITESCENE SOFTWARE AND INTEGRATION
12 NOVEMBER 2014
1. DESCRIPTION:
The 580th Software Maintenance Squadron (SMXS) requires the acquisition, integration, and training of FliteScene software. FliteScene will be integrated onto the MC-130J SMP at Robins AFB to develop a standard tactical moving map application for the MC-130J, AC-130J, ACC HC-130J and USMC KC-130J. FliteScene will additionally enable 580th SMXS the capability to change software scripts, modify configuration files, and update and modify NGA product database.
1.1. The Contractor shall provide 1 ea. copy of FliteScene version 2.7 software; compatible with the operating systems and processing platforms of Spiral 2.1 and Spiral 3.1, listed in 1.1.1 and 1.1.2.
1.1.1. Spiral 2.1 avionics architecture: this architecture uses the Dell XFR 6420 militarized laptop PC (running Microsoft Windows 7 Enterprise 64-bit PCOS) and its display of 1366 x 768 HD landscape (12.2” x 6.9”and 14” diagonal), and using the Esterline CMC TacView militarized tablet PC (running Microsoft Windows 7 Professional 64-bit PCOS) and its display of 768 x 1024 XGA portrait (5” x 7” and 8.4” diagonal).
1.1.2. Spiral 3.1 avionics architecture: this architecture uses the Special Mission
Processor (SMP) and the Curtiss-Wright DMV-1908 x86 cards (running Microsoft Windows 7 Embedded 64-bit PCOS) and the Lockheed Martin Owego GP-103A+ PowerPC graphics cards (running Green Hills Integrity 178 RTOS).
Video output as both a 768 x 1024 XGA portrait (6“ x 8” and 10” diagonal), and a 1024 x 768 XGA landscape 12” x 9” and 15” diagonal), and a demo on 1920 x 1080 Full HD landscape (15.0” x 8.3” and 17” diagonal) showing HD landscape and split screen showing side by side the previously defined 768 x 1024 XGA portrait (6” x 8” and 10” diagonal).
1.2. The Contractor shall provide the following executable software files:
1.2.1. NGA product demo database.
1.2.2. FliteScene map demo and editable files for portraying a subset of C-130J “look and feel” Human Machine Interface (HMI).
1.3. The Contractor shall provide on-site and remote technical support for aircraft-specific interfaces. 200 hours total (80 hours of two blocks of 40 hours on site, and 120 hours remote) support for the period After Receipt of Order (ARO) to 31 Dec 2015.
1.3.1. The on-site support shall include integration of the FliteScene Software onto the MC-130J SMP, located in BLDG 229 at Robins AFB, and training of Robins
AFB personnel.
1.3.1.1. The Contractor shall provide soft and hard copies of the training materials including technical references (CDRL A001, Training Materials, DI-
ILSS-80872/T)
1.4 The Contractor shall provide the Government access to update and modify the NGA Product Database.
2.0 General Information
2.1 Duty Hours and Government POC. The Contractor’s activities at Robins AFB will be performed between the hours of 6:30 am and 3:00 pm (EST), Monday through Friday, excluding Federal holidays. Any work performed at Robins AFB, outside this timeframe shall be coordinated with the POC and approved by the Contracting Officer. The Government POCs are listed below.
Primary Alternate Kenneth Swanger Christopher Puckett
580 SMXS/FLT D 580 SMXS/FLT D
Kenneth.Swanger@us.af.mil Christopher.Puckett@us.af.mil 478-926-0716 478-926-0660
2.2 Place of Performance. Integration and training of FliteScene software into the MC-130J
SMP shall be performed in BLDG 229E of Robins AFB. All other activities shall be performed at the Contractor’s facility.
2.3 Government Furnished Property and Services: None.
2.4 Requirements for Contractor Credentials. The Air Force has mandated visitors, to include all non-DOD card holders, to consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off of Watson Boulevard.
2.4.1 Unescorted visitors will need their driver’s license or state-issued ID, and a social security card, which will be checked by name, dates of birth and social security number. Contractor personnel who wish to drive on base must present a valid driver’s license and vehicle registration.
2.4.2 For Contractor personnel not requiring access to computer networks on Robins
AFB, a Government Badging Agent will work with the Contracting Officer’s Representatives or Government POCs and contractor personnel to submit required documentation to the VCC. The contractor ID card/badge authorizes unescorted entry to Robins AFB for the bearer only The Government Badging Agent for this contract can be reached at (478) 926-4672.
2.5 SAFETY REQUIREMENTS: The Contractor shall be responsible for the safety and health of all contractor employees.
2.5.1 Contractor Safety & Health Plan and Program. The Contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan tailored to this contract. This plan shall address the requirements established in Appendix C (Industrial Safety and Health Requirements). The Contractor shall notify the cognizant safety office of any revisions made to its safety and health plan after contract award. All changes to the plan must also be submitted in writing and approved by the cognizant Government safety office.
(CDRL A002, Contractor’s Standard Operating Procedures – Company Safety Plan, DI- MGMT-81580/T).
2.5.2 Mishap/Incident Reporting. The Contractor shall report all mishaps/incidents in accordance with the contract Appendix C. The Contractor shall immediately secure the mishap scene and damaged property and impound pertinent maintenance and training records until released by the Government’s Safety Office (WR-ALC/SE). Such release shall be accomplished through the CO. The Contractor shall cooperate and assist Government personnel in the investigation of the incident and submit an Accident/Incident Report within 24 hours of the accident/incident. The Contractor shall require all subcontractors to comply with required safety, health and fire standards. (CDRL A003, Accident/Incident Report, DI-SAFT-81563/T).
2.6 Green Procurement Program (GPP). The products or services for this requirement are not listed on a mandatory environmental purchasing list.
File details come from the government source that posted it. Updated .