Solicitation_Question_and_Answers_Group_One_.pdf

PDF 45 KB Posted

Attached to
LAU-128 and LAU-129 Missile Rail Launchers i
Solicitation number
FA8554-17-R-0004
Issued by

About this file

Solicitation Question and Answers Group One

View the file

Other files

File Type Posted
Solicitation_Question_and_Answers_Group_Two.pdf PDF
FA855417R0004_______0002.pdf PDF
9579776.pdf PDF
9579777.pdf PDF
9626025.pdf PDF
FA855417R0004_______0001.pdf PDF
FA8554-17-R-0004.pdf PDF
Pre-Award_Source_Qual_MRL_Final_12_Oct_2016_(002).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Question and Answers Group One

1. What is the number of 3D models, 2D drawings, and hanging paper that has been completed by the Government and will be provided IAW the SOW? Will these drawings require additional validation?

Answer:

There are 11 drawings that have been updated with new coatings and will not have to be validated. All other drawings in the TDP will have to be edited.

2. What is the anticipated number of drawings that will require validation and revision/update as a part of this effort?

Answer:

All but 11.

3. What is the period of performance for the TDP update effort? Is it anticipated that the TDP update will be in parallel with the First Article unit build and what is the time frame for government approval as the TDP requires approval prior to production? What is the timeframe for the maintenance of the TDP, 12 months after each CLIN is exercised?

Answer:

The TDP will be updated in parallel with the First Article and due at the same time as the FA. Gov will take 45 days to make final judgment following delivery of completed TDP. Updates are to be submitted as accomplished and submitted IAW CDRL A002.

Answer:

4. What 3D model file format/standard is required to produce the CAD models and drawings? Are drawings required to be associated with the models as a part of the SOW? Does the model/drawing require a database management system if model/drawing must be associated and if so, what is required?

Answer:

Solidworks, v17 SP4. Drawings will be associated with the models and specific verbiage is required on each drawing as specified in CDRL A002. No database management system is required but models and drawings must be in specific format and summarized in a meta data file, IAW CDRL A002.

Answer:

5. What level of update is required for test and process specifications such as: 16PR15601 Alternate Mission Equipment Finish Process, DS32050-116, Prime Item Development & Product Fabrication Specification, AIM-120 Parts I & II Launcher,DS32050-550, Critical Item Product Fabrication Specification, Power Supply Part II, PS60602-712 Environmental Stress Screening for AIM-120 Production and APREP FAR and supplements Federal Acquisition Regulation?

Answer:

Update industry and military specifications as well as weights/balances (with CCB approval).

6. Who is the approval authority for specifications that have been canceled without replacement?

Answer:

EBWEM, Launcher Engineering.

7. Is the 3000 Power Supply TDP required to be updated as a part of the

SOW?

Answer:

No.

8. Please provide drawings 9626025 rev G and 9579776 rev M, and 9579777 rev B as referenced within CDRL A002.

Answer:

Attached.