STATEMENT OF WORK (SOW)

For

AN/APM-424(V)3/5

For Poland Air Force C-130E Aircraft

FOREIGN MILITARY SALES (FMS) CASE PL-D-QAH

PR: FD2060-15-93643

04/30/2015

Prepared by:

Warner Robins Air Logistics Complex

Robins Air Force Base, Georgia

FMS Program Manager Paul Matusiak

AFLCMC/WLNIB

Robins AFB, GA 31098-1670

Phone: (478) 222-1305

Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 01-11-27). Other requests for this document shall be referenced to AFLCMC/WLNIB, Robins AFB, GA 31098.

SECTION I: SCOPE

1.1 Purpose. This Statement of Work (SOW) establishes the requirements for procuring three (3) AN/APM-424(V)5 part number 91067, and upgrade one (1) AN/APM(V)3 to (V)5 to include the required adapters, manuals and modified software in support of Poland Air Force (PLAF) C-130E program. The PLAF chose the APM-424 test set for their fleet of C-130E aircraft to support the upgrade to APX-119 system upgrade to the Identifier, Friend or Foe (IFF) system.

1.2 Scope. The Aeroflex shall deliver four complete APM-424(V)5 test sets (three new purchases, one upgrade of GFE) loaded with the unique software developed to support CNS/ATM requirements to meet international Global Air-Traffic Management (GATM) requirements. The sets also include adapters and manuals that support the kit.

SECTION II: TECHNICAL DOCUMENTS

2.1 Technical Data. Aeroflex shall follow the production drawing and specifications for the An/APM-424(V)5 and the unique modified software developed to support APX- 119 Mode 5 Upgrade.

SECTION III: GENERAL INFORMATION

3.0 General Information

3.1 Inspection/Acceptance. Contract Terms and Conditions –Inspection of Supplies Clause from Federal Acquisition Regulation (FAR) Subpart 52.246-2 gives the right to inspect contractor performance so long as it does not cause undue delay to delivery of those services.

3.2 Reports: The contractor shall provide the following reports: Bench Utility Software will require a Software Version Description (CDRL A001, DI-IPSC-81443A), and a Software User Manual (CDRL A002, DI-IPSC-81442A). The APM-424 Test Set will require Commercial of the Shelf (COTS) equipment user’s manual (CDRL A004, DI- TMSS-81815). The Contractor shall provide a Certificate of Calibration for the APM-424 Test Set. (CDRL A003, DI-QCIC-80798B).

3.3 Green Procurement Program. (GPP). FMS Exemption: The GPP requirement applies only to the acquisitions using appropriated U.S. Government funds, therefore, the GPP requirement does not apply.

3.4 Warranty. The Test Sets shall be warranted for at least two (2) years for materials and workmanship.

3.5 Shipping. The Contractor shall ensure all required markings, labeling, and documentation affixed to shipping packages are legible for onward processing to Poland’s Freight Forwarder (FF). The Contractor shall be responsible for all material being shipped to Poland’s FF. The Contractor shall ensure that the clear-text (street) address of the consignee is correct and that there is an address posted both on the outside and inside of the packaged shipment. Also, the Letter of Offer and Acceptance (LOA) FMS Case PL-D-QAH Line 705 and DCN DPLE5N551216600 shall be visible posted along with the FF address.

3.6 Freight Fowarder.

(1) Ship To: DPL002 TAC 2

UTI United States Inc 230-39 Intl Aprt Blvd Door 3 Springfield Gardens, NY 11413-4104

ATTN: FOR FMS CASE PL-D-QAH

Ph: 1-718-244-2151 FAX: 1-718-244-2180 ATTN: Marlene Franciso

(2) Mark For: DPLE00 TAC M

ARMAMENT INSPECTORATE

ATTN: FOREIGN SERVICES DIVISION

TEL: 48226879515/09752 FAX: 48226873147

UL. KROLEWSKA 1/7

00-909 WARSZAWA POLAND

3.7 Place of Performance. Work shall be performed at the Contractor’s facility or associated sub-contractor facility.

3.8 Travel. No contractor travel is required to meet the requirements of this SOW.