DEPARTMENT OF THE AIR FORCE

JUSTIFICATION FOR OTHER THAN

FULL AND OPEN COMPETITION

I. CONTRACTING ACTIVITY

This Justification and Approval to request authority for Other Than Full and Open Competition supports requirements generated for Air Force Life Cycle Management Center, Agile Combat

Support Directorate, Electronic Warfare and Common Avionics Division, Precision Attack

Program Office for International Sales (AFLCMC/WNYBAI). The contracting activity for this requirement is the Air Force Life Cycle Management Center, Agile Combat Support Directorate, Electronic Warfare and Common Avionics Division, Electronic Warfare and Avionics

Contracting Branch (AFLCMC/WNKCB). The purchase request number supporting this contracting action is FD2060-14-30969.

II. NATURE AND/OR DESCRIPTION OF THE ACTION BEING PROCESSED

Due to the circumstances described herein, the activity requests authority to acquire the supplies listed in this document using Other Than Full and Open Competition prescribed by FAR 6.302-

1(a)(2)(ii)(B), Only One Responsible Source and No Other Supplies and Services Will Satisfy

Agency Requirements. This individual Justification and Approval (J&A) authorizes the use of other than full and open competition procedures to award a sole source Firm Fixed Price (FFP) contract to:

Lockheed Martin Missile and Fire Control (LMMFC)

5600 Sand Lake Road

Orlando, Florida, 32819

(CAGE 04939)

Large Business

This acquisition is in support of the largest Foreign Military Sale in U.S. history, under the

RSAF F-15S Fleet Modernization Program (FMP) effort as described in the Defense Security

Cooperation Agency notification to Congress, transmittal No. 10-43, dated October 20, 2010.

This acquisition is for production of Sniper Advanced Targeting Pod (ATP) Line Replaceable

Units (LRU) replenishment spares, Infrared Search and Track (IRST) LRU replenishment spares, and Low-Altitude Navigation & Targeting Infrared for Night (LANTIRN) Navigation Pod (NP)

LRU replenishment spares for the Royal Saudi Air Force (RSAF). LMMFC, also referred to in this document as Lockheed or Lockheed Martin (LM), is the original designer, developer, and manufacturer of these three systems.

III. DESCRIPTION OF THE SUPPLIES/SERVICES REQUIRED TO MEET THE

AGENCY’S NEEDS

A. This J&A covers a Firm Fixed Price Contract award for the production of replenishment

LRU spares for the Sniper ATPs purchased under contracts FA8522-09-C-0006 (14 EA), FA8522-10-C-0003 (21 EA) and FA8540-12-C-0012 (95 EA); the IRST systems purchased under contract FA8540-12-C-0012; and LANTIRN NPs purchased under contract FA8634-

12-C-2651 for the RSAF. Based on all facts known today, this is expected to be the final such spares procurement for the RSAF. Initial spares were purchased with the procurement of the respective systems. This spares contract award value is estimated to be up to

$103,900,000. This estimate is based upon price and availability (P&A) data provided by

LMMFC. The Letter of Offer and Acceptance (LOA), SR-D-SAP (line 035 and 076 A/C

Comp Parts & Accessories Unclassified), between the United States Government (USG) and the Government of Saudi Arabia is the source of funding for this proposed contract action.

B. Normal production lead time is months after receipt of contract for the IRST LRUs and months after receipt of contract for the Sniper ATP and LANTIRN LRU spares.

C. It is essential to contract for more than a single year of spares production. Production lead time on the spares, funding constraints of the FMS customer, and the ability to leverage economies of scale by consolidating the total requirement using one contract effort makes this necessary.

IV. STATUTORY AUTHORITY PERMITTING OTHER THAN FULL AND OPEN

COMPETITION

10 U.S.C. 2304(c) as implemented by FAR 6.302-1(a)(2)(ii)(B), Only One or a Limited Number of Responsible Sources, and No Other Supplies or Services Will Satisfy Agency Requirements.

V. DEMONSTRATION THAT THE CONTRACTOR’S UNIQUE QUALIFICATIONS

OR NATURE OF THE ACQUISITION REQUIRES THE USE OF THE AUTHORITY

CITED ABOVE (APPLICABILITY OF AUTHORITY)

A. Foreign Military Sales

The supplies covered by this J&A are a part of the largest Foreign Military Sale in U.S. history, under the RSAF F-15S Fleet Modernization Program (FMP) effort as described in the Defense

Security Cooperation Agency notification to Congress, transmittal No. 10-43, dated October 20, 2010. While LOA SR-D-SAP source directed the procurement of Sniper ATPs, IRST systems and LANTIRN NP upgrades to Lockheed Martin, the Original Equipment Manufacturer (OEM), the LRU spares for these systems are not source directed in the LOA. The Sniper ATP was competitively acquired as a Non-Developmental Item (NDI) in 2000 and the USG did not purchase the Sniper ATP re-procurement nor repair data and software. Additionally, the new

IRST sensor system was procured for the first time by the USG under the Wright-Patterson Air

Force Base F-15SA aircraft production contract. No re-procurement or repair data and software for the IRST sensor system was purchased under this acquisition either. While the USG previously procured re-procurement data and software for the older LANTIRN system, the USG does not own the data and software for the upgraded LANTIRN NPs being procured for the

RSAF. There has been a Request for Information (RFI) seeking any sources that may possess the expertise, capabilities, and experience to meet the requirements, to include in-country field service technical support, for the Sniper ATP, LANTIRN NP, and IRST systems sold to FMS countries through Foreign Military Sales. The RFI was posted to the Federal Business

Opportunity website May 12, 2014, Solicitation Number FA8540-14-R-99989. No responses were received for this posting. Previous RFI’s for the same system associated with specific FMS cases and requirements have been posted with no response to any of them as well. All LRUs in the package are either made by LM or LM owns the data and software to the LRUs and procures the LRUs from individual companies (see listing of repair candidates identified in “Attachment

A”). LM remains the only source that possesses the proprietary drawings, design and manufacturing technical data and specific software test programs required to manufacture and support Sniper ATPs, IRST and LANTIRN. In accordance with the LOA, RSAF has requested the procurement of Sniper ATPs, LANTIRN NPs and IRST Systems, with the associated spare

LRUs.

B. Follow-On Contract

LM is the original designer, developer and manufacturer of the Sniper ATP, LANTIRN NP, and

IRST systems and is currently the sole provider of the supplies described in Section III of this

J&A. The Sniper ATP, LANTIRN NPs and IRST systems as well as associated test equipment are specialized military unique hardware that have been customized to the point that they could not be reengineered by an unqualified source or bought commercially off-the-shelf. There are no other contract vehicles in place to deliver these requirements. As such, this individual J&A requests approval to enter into the final follow-on, sole source acquisition with LM for the manufacturing of LRU replenishment spares, where an award to any other source would result in duplication of costs that would not be recovered through competition. The RSAF would experience duplication of cost if these sustainment supplies were competed through one of two ways: 1) If a winning contractor other than LM were awarded the contract, that contractor would have to subcontract to LM for production of the LRU replenishment spares, engineering support and testing, as the USG could not provide technical data and software for the three systems to the awarded contractor. 2) If a winning contractor other than LM were to attempt to reengineer the technical data and software for the three systems in order to fulfill the instant spares, the customer would realize a duplication of cost in excess of $1B in life cycle costs. This estimate is based on the independent cost analysis performed on 18 June 2010 prior to award of the USAF

Sniper Sustainment Contract (FA8523-12-D-0004). In 2010, the Precision Attack Office requested a ROM from LMMFC for Sniper ATP data rights. Although the total ROM cost was approximately million, the Contractor acknowledged in the 29 April 2010 response that: 1) this value excluded supplier owned data (some of the most critical elements of the Sniper ATP design); 2) rights in data would be Government Purpose only; and 3) the Contractor provided the

ROM "for planning purposes only and should not be construed as a firm offer to sell." On 24

July 2013 and on 17 June 2014, the USG queried LMMFC again for a ROM on data rights only to be told the data rights were, again, not for saleand that the data will not be made available to the government for competition. Reverse engineering is also hindered in an acquisition of this non-developmental item/system and subsystems as all data rights are proprietary to LMMFC.

The USAF decided 13 years ago to not acquire the data rights. The Government has use rights only.

The purpose of this requirement is to prevent reverse engineering. With the unavailability of procurement data, and complexity incorporated into the systems design, reverse engineering efforts for future acquisitions are hindered even if the FMS customer authorizes funding under an LOA amendment or new case. The $1B is comprised of the technical data package (TDP) for the three systems, first article and related tests, associated equipment and other capital investments. Likewise, additional “pass through” costs would be added to the total contract value when another layer of contracting is required. This generates increased costs to the USG. Additionally, the Sniper ATP Depot Source of Repair (DSOR), accomplished

November 2011, approved a workload split of 18% organic repair at Warner Robins Air

Logistics Complex (WR-ALC) and 82% contract repair for the sustainment of the USAF Sniper

ATP fleet and all Foreign Military Sales Sniper repairs.

C. Highly Specialized Equipment

LM possesses the specialized capabilities including the proprietary data, proprietary software, engineering personnel, data, and equipment necessary to manufacture the Sniper ATP, IRST and

LANTIRN fleets. As the original system designer and builder, LM has retained the engineering expertise to address all the customer’s technical requirements. Although data and software is available for a limited number of LRUs, LM is the only contractor that possesses gerber files (software) and TPSs for LRU verification. This is accomplished through a core team of software engineers familiar with the proprietary Operational Flight Program (OFP) software for all three systems. The FMS program office intends to capitalize upon its investment in LM’s support infrastructure to continue the existing two-level maintenance concept and relationships, and to furnish field support for its operational customers.

D. Unacceptable Delays

As failures occur, pod availability and the pipeline for parts would be harmed without spares for the Sniper, LANTIRN, and IRST systems in the accepted timeframe. Pod availability is crucial to F-15SA mission success. A potential impact on international relations between Saudi Arabia and the United States Government (USG) could occur if the U.S. fails in meeting the contract schedule as agreed with the FMS customer. Sniper systems supported by this contract began delivery in March 2013, and the LANTIRN Navigation pods began delivery in January 2015. To address the lack of a full TDP, ASC/Combat Electronics Division requested a cost estimate

ROM from LM for Sniper ATP data rights and software. The ROM was provided to the

Government on 29 April 2010. Although the total ROM cost was approximately the government re-engaged the contractor in an email dated 24 July 2013, and revalidated that this value excluded supplier owned data and software (some of the most critical elements of the

Sniper ATP design) and the contractor provided the ROM “for planning purposes only and should not be construed as a firm offer to sell.” As a complement of this query, the Government

Cost Comparison Analysis (CCA) established a TDP cost of $703.2 million to support the full range of anticipated Sniper post production support requirements. A breakout of the TDP costs between re-procurement data, technical repair data and recoupment of developmental costs was not provided. Lacking this data and software, the USG would still be dependent upon LM for any future parts supply and technical support, which constitutes a substantial portion of contract costs. The Precision Attack System Program Office, Robins AFB, finds LM’s ROM to be a credible representation of the value of the total TDP and software costs considering the above

CCA results. Based on this information, the USG does not find the purchase of the TDP and software to be economically feasible or a sound business case and therefore does not intend to purchase the TDP and software. Additionally, LOA SR-D-SAP does not include funding or a requirement to purchase re-procurement data and software for the three systems. The LOA has met the ceiling value established by Congress; hence the customer cannot buy the data and software until the RSAF deems re-procurement data/software a higher priority than the weapons systems and vehicles currently required by the LOA. The required time to conduct the BCA, establish a valid requirement, source funding, compete for source selection, award the contract, have another source develop the Technical Data Package and software, deliver the TDP and software, procure Depot level Support Equipment and more, would be between three to four years. This is an unacceptable delay the customer cannot accept.

VI. DESCRIPTION OF EFFORTS MADE TO ENSURE THAT OFFERS ARE

SOLICITED FROM AS MANY POTENTIAL SOURCES AS DEEMED PRACTICABLE

This requirement has been synopsized in the Federal Business Opportunities web page as required by FAR 5.201. Air Force Life Cycle Management Center, Agile Combat Support

Directorate, Electronic Warfare and Avionics Division, Contracting Branch, posted a Request for

Information (RFI) seeking any sources that may possess the expertise, capabilities, and experience to meet the requirements for manufacture, test, delivery of LRU spares, depot level repairs and total logistics support, to include in-country field service technical support, for the

Sniper ATP, LANTIRN NP, and IRST systems sold to the RSAF through Foreign Military Sales.

The RFI was posted to the Federal Business Opportunities website on 13 February, 2014. No responses were received for this posting.

VII. DETERMINATION BY THE CONTRACTING OFFICER THAT THE

ANTICIPATED COST TO THE GOVERNMENT WILL BE FAIR AND REASONABLE

The price of this acquisition will be fair and reasonable to the government. The contractor will be required to provide certified cost or pricing data to be used to support the USG’s evaluation of the proposed cost. Unit prices will be negotiated by the USG based on recommendations from the Defense Contract Audit Agency (DCAA) and Defense Contract Management Agency

(DCMA). The contract price will be negotiated in accordance with the procedures in FAR Part

15 to ensure that the ultimate cost to the government is fair and reasonable.

VIII. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED AND THE

RESULTS, OR A STATEMENT OF THE REASONS MARKET RESEARCH WAS NOT

CONDUCTED

A. Market research was conducted in February 2014 pursuant to FAR Part 10.001 and 10.002 and consisted of: (1) A review of the USAF Operational Requirements Documents, the

Advanced Targeting Pod System Specification and participation in the operational requirements assessment of the USAF source selection for ATP, and (2) Using generic criteria to identify additional sources on the World Wide Web (WWW). No sources with Sniper ATP, LANTIRN

NP, or IRST experience were identified other than the prime, LM. This is logical for several reasons. No other source has manufactured or repaired the Sniper ATP spares or IRST spares included in this requirement and would require a full qualification on the item. As the Sniper

ATP and IRST are non-developmental items, there is insufficient data and software available that would allow another source to qualify. The items covered under this requirement are LM manufactured/ specification controlled items. There is no alternate manufacturing source

LM is the only qualified source capable of meeting the requirement as described by the RSAF LOA. Internet searches on the Thomas Register and

Google search using keywords “Sniper,” “LANTIRN,” “IRST,” and “Terminator” pods did result in identification of additional targeting pods manufactured and supported by various sources such as Northrop Grumman and Raytheon, who manufacture Litening III, Litening IV, Litening AT, and Terminator. However, only the Sniper ATP, IRST system and LANTIRN NPs meet the requirements as called out by the FMS customer in the RSAF LOA.

B. Research for this effort was based on internet searches, past experience with similar contracts, and discussions with USG personnel leading similar efforts. Additional information was gathered during the negotiations of data rights between the USG and LM on the first USAF

Sniper ATP contract, reviewing data rights assertions on FMS contracts involving Lockheed

Martin and Northrop Grumman, reviewing and editing LANTIRN drawings for LM and for the

USG, and participating in three Department of Defense (DoD) source selections for precision attack systems. As this request is for spares supporting "Sniper ATP", “IRST” and “LANTIRN

Navigation Pod” systems, internet searches were accomplished using keywords "Sniper ATP", “IRST” and “LANTIRN Navigation Pod”. Internet searches show only one source.

C. There are three DoD contractors that specialize in precision attack sensor systems. They are

Northrop Grumman Corporation, Raytheon Company, and Lockheed Martin Corporation. The three companies offer competing targeting systems for which they each maintain exclusive data rights. LM and Raytheon have a vendor sub-vendor relationship on the LANTIRN NP. The proprietary nature of these products means there is only one supplier of the Sniper ATP Systems, IRST, and LANTIRN NP. LMMFC is the only manufacturer of Sniper, IRST, and LANTIRN systems and owns all the technical data. As described within the RSAF LOA, LM is the only qualified source capable of meeting the requirement.

IX. ANY OTHER FACTS SUPPORTING THE USE OF OTHER THAN FULL AND

OPEN COMPETITION

None.

X. LIST OF SOURCES, IF ANY, THAT EXPRESSED INTEREST IN THE

ACQUISITION

See Section VI above.

XI. A STATEMENT OF THE ACTIONS, IF ANY, THE AGENCY MAY TAKE TO

REMOVE OR OVERCOME ANY BARRIERS TO COMPETITION BEFORE MAKING

SUBSEQUENT ACQUISITIONS FOR THE SUPPLIES OR SERVICES REQUIRED

This FMS case entails a period of performance through the end of CY Despite the long period of performance for this FMS case, the likelihood of follow-on buys is doubtful as this effort is designed to be a last spares buy for the RSAF. This acquisition effort ensures spares availability of assets to cover all the customer foreseen requirements relating to the entire life of

Sniper ATPs, IRST systems and LANTIRN NPs owned by the customer. There is currently only one qualified source with all the equipment and data and software necessary to manufacture and support these three systems; that source is LMMFC. To address the lack of a full TDP and software, ASC/Combat Electronics Division requested a cost estimate ROM from LMMFC for

Sniper ATP data rights. The contractor’s response was received in an email dated 24 July 2013.

The contractor advised the USG that they do not intend to offer the technical data package and software for sale at this time. The Precision Attack System Program Office supports FMS customers based on the USAF existing support infrastructure. Should the USAF reconsider purchasing the TDP and software to make competition practical, the Precision Attack System

Program Office would follow suit. Additionally, the RSAF LOA SR-D-SAP does not provide a requirement or funding to procure a re-procurement data and software package for the three systems. The Precision Attack System Program Office will engage the FMS customer to discuss the need for an established requirement to procure the TDP and software at the next scheduled program review. At this point, the customer would conduct a business case analysis to determine the need to fund the requirement. If the customer establishes a valid requirement, the government will solicit the contractor again for the TDP.

XII. CONTRACTING OFFICER’S CERTIFICATION

The signature of the Contracting Officer on the Coordination and Approval Document evidences that he has determined this document to be both accurate and complete to the best of his knowledge and belief. (FAR 6.303-2(b)(12)).

XIII. TECHNICAL/REQUIREMENTS PERSONNEL’S CERTIFICATION

As evidenced by their signatures on the Coordination and Approval Document, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete. (FAR 6.303-2(c)).

File details come from the government source that posted it. Updated .