PERFORMANCE-BASED WORK STATEMENT (PWS)

View the file

Other files

File Type Posted
AFMC_FORM_158_PKGRQMT_REPORT.pdf PDF
FA853917R0027.pdf PDF
PWS.pdf PDF
QASP.pdf PDF
CDRL_A001_thru_A009.pdf PDF
DD_FORM_1653_TRNSPDATA_REPORT.pdf PDF
FA853917R0027.pdf PDF
QASP.pdf PDF
CDRL_A001_thru_A009.pdf PDF
AFMC_FORM_158_PKGRQMT_REPORT.pdf PDF
DD_FORM_1653_TRNSPDATA_REPORT.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-16-00962 PWS 1

Distribution Statement: A

Performance-Based Work Statement (PWS) for

Repair of the Fully Integrated Data Link (FIDL)

Purchase Request: FD2060-16-00962

Date: 19 June 2016

Distribution Statement A : “Approved for public release. Distribution is unlimited.”

PR: FD2060-16-00962 PWS 2

1.0 Description of Services:

1.1 Objective(s): This Performance-based Work Statement describes the services required to furnish the services and material necessary for the essential depot level repair. These services include functional testing, inspection, and packaging of the National Stock Numbered (NSN) items listed in Appendix B of this PWS. The contractor shall fault isolate, repair and test unserviceable assets along with track and resolve items affected by Product Quality Deficiency Reports (PQDR) while performing depot level repair, functional testing, inspection, and packaging. The period of performance shall consist of a basic one-year period after contract award plus four (4) one year option/ordering periods. The contract type is a Firm-Fixed Price Requirements for all ordering periods. The Contractor shall repair to serviceable condition within the negotiated repair Turn Around Time (TAT) in each proposal. The Contractor shall provide immediate response to ensure that time for critical item delivery requests are punctual by responding to the Production Management Specialist (PMS) within one business day of the request with the estimated delivery date of the critical item. The Contractor shall deliver monthly status reports on time. The Contractor shall generate and submit to the Government any Class II changes, including all substitute parts changes, through Document Change Notices (DCN) within 30 calendar days. The Contractor shall respond quickly to a Government request for assistance with an initial response to a Government request for assistance within eight business hours. The Contractor shall report production using the Commercial Asset Visibility Air Force (CAVAF) system by maintaining current inputs. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. The Contractor shall provide notification of engineering changes. The Contractor shall submit an Engineering Change Proposal (ECP) for all Class I changes to the baseline configuration.

Additionally, the Contractor Manpower Reporting shall be established and maintained by the contractor.

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by providing continued support for the FIDL. The FIDL replaces monochromatic displays at the rear cockpit crew stations with color multifunctional displays, a streamlining move which will help the crew with weapons assignment and delivery. In addition, this will allow the crew to perform rapid airborne retargeting missions using machine-to-machine data transfers.

1.3 Background: The FIDL was manufactured by Calculex and is installed on all B-1 aircraft.

2.0 Services Summary:

Performance Objective PWS Reference

Performance Threshold

Deliver Monthly Status Report

4.2.2 The Contractor shall make this information

available to the Government monthly and provided electronically. At a minimum the report shall consist of an itemized list of assets on hand at the end of each month to include the NSN, part number, and quantity. There shall be no more than one late submission of data/document(s) per contract year.

PR: FD2060-16-00962 PWS 3

Ensure prompt delivery 4.3.1 TAT for repairs of Line Replaceable Units (LRU) shall be in accordance with the agreed upon TATs within the proposals.

Expedite Critical Item Delivery and Respond quickly to a Government request for assistance.

4.3.1.1 The Contractor shall respond to the PMS within

one business day of the request with the estimated delivery date of the critical item.

Follow-up assistance, if required, shall be provided by a suspense date acceptable to the Government.

Submit Design Change Notices

4.10.1 The Contractor shall notify the Government of

all Class II changes, including all substitute parts changes, through DCN within 30 calendar days.

Generate Engineering Change Proposal

4.10 The ECPs submitted shall be technically

accurate, complete, clearly written, and systematically account for the proposed configuration changes.

Maintain current CAV-AF Reporting

4.8 The Contractor shall report production using

CAVAF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur.

The following metrics will be monitored:

-GFM In-Transit -Repairable GFM Accountability -Assets Not on Contract

Comply with the quality levels of repair necessary to return assets in serviceable condition.

4.9 There shall be no more than one validated

Product Quality Deficiency Report (PQDR) per contract year.

Establish and maintain Contractor Manpower Reporting.

5.8-5.8.3 Within 30 calendar days of contract/order award, the Contractor shall establish a record for the contract/order in eCMRA including Order Data, Contact Data and Location Data and make the annual report- no later than October 31 of the following fiscal year.

3.0 Government Property and Services

3.1 Government Property: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements including, but not limited to, FAR Part 45, Government Property; FAR 52.245-1, Government Property; and Defense Federal Acquisition Regulation Supplement (DFARS) Part 245, Government Property. The FAR and applicable supplements can be accessed at the site:

http://farsite.hill.af.mil http://farsite.hill.af.mil/

PR: FD2060-16-00962 PWS 4

3.2 Government Property to be Provided: Government property will not be provided.

3.3 Government System(s): Access to Government systems will not be required to perform tasks under the contract/order.

4.0 Technical Requirements

4.1 Period and Place of Performance:

4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order is a one year basic period plus a one year ordering/option period.

4.1.2 Place of Performance: These services will be performed at Las Cruces, New Mexico.

4.2 Contract Data Requirements List (CDRL):

4.2.1 The Contractor shall deliver all data/reports associated with all CDRLs, with no more than one rejection of each deliverable. There shall be no more than one total rejection(s) of deliverables per contract year. The Government will reject a deliverable if one or more technical errors or one or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is defined as a typographical or grammatical error. The rejected deliverable shall be corrected and resubmitted within 2 business days of notification of Government rejection. in accordance with the associated DD Form 1423 instructions/requirements.

4.2.2 The Contractor shall deliver all CDRLs with no more than one late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date.

The data/document shall be delivered by the revised delivery date acceptable to the Government.

• A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF) Report

• A002, DI-MGMT-80368A, Monthly Status Reports

• A003, DI-CMAN-80639C, Engineering Change Proposal

• A004, DI-MISC-80071E, Parts Approval Request

• A005, DI-QCIC-80125B, Alert/Safe Alert

• A006, DI-QCIC-80126B, Response to an Alert/Safe Alert

• A007, DI-MISC-81832, Counterfeit Prevention Plan

• A008, DI-MGMT-81803, IUID Marking Plan

• A009, DI-MGMT-81804, IUID Marking Activity, Validation, and Verification Report

4.3 Repair Details

PR: FD2060-16-00962 PWS 5

4.3.1 Turn Around Time (TAT): TAT is measured from the Contractor’s receipt of the item and funded delivery order, whichever is latest, to the time the asset is shipped back to the Government. TAT for repairs of LRUs shall be in accordance with the agreed upon TATs within the contract.

4.3.1.1 Joint Chief of Staff Surge backorders and Mission Incapable Aircraft Parts (MICAP) requirements will take precedence over the routine schedule and shall be expedited to the extent possible. The Contractor shall respond to the Production Management Specialist (PMS) within one business day of the request with the estimated delivery date of the critical item. In the event that a repairable item is required by the Government on an emergency basis to fill MICAP/Surge backorders, the Government PMS or Program Manager will notify the Contractor in writing (E-mail preferred) as soon as the need is identified. The Contractor shall initially respond to a Government request for assistance within eight business hours. Follow-up assistance, if required, shall be provided by a suspense date acceptable to the Government.

4.3.2 Obsolete Parts

The Contractor shall notify the Government of evolving obsolete part conditions and make recommendations including last-time buy opportunities and any redesign that may ensue.

Requests for funding and all related issues will be directed through the Procurement Contracting Officer (PCO). Replacement parts or redesign will be recommended to minimize impact.

Performance of engineering efforts to resolve, redesign, and replace (not due to failure) obsolete parts are not funded under this contract.

4.3.3 Cannibalization

With written authorization from the PCO and Program Manager (PM), the Contractor shall be authorized to retain all condemned items for use in cannibalization down to the Shop Replaceable Unit (SRU) level for use in the repair process. Removing parts, components, or subassemblies to aid in the repair of other units, shall not be reason for condemnation. Parts, components, or subassemblies used to aid in the repair of other units shall be replaced as they become available.

4.3.4 Condemnation

A repair shall be considered for condemnation if physical damage such as fire, explosion, flood, aircraft crash, enemy combat action substantially destroys the physical and electrical integrity of the unit.

4.3.4.1 The Contractor shall provide notification with a condemnation request to the PCO/PM for approval/disapproval. The Contractor shall document the damage including description and photographs. The Contractor shall submit the package within 30 calendar days after item induction to the PCO/PM. The cognizant Government P M will then make the final determination and provide disposition instruction to the PCO.

4.3.4.2 Condemned items shall be disposed of and demilitarized in accordance with DoD Publication 4160.21-M-1 “Defense Demilitarization Manual”. Written authorization from the PCO and system Program Manager authorizing the Contractor to retain a condemned item(s) for cannibalization and reuse.

PR: FD2060-16-00962 PWS 6

4.3.5 Extraordinary Repair Action (ERA)

If the Contractor believes the repair action will be extraordinary, the Contractor shall provide notification with an ERA explanation through the Administrative Contracting Officer (ACO) to the PCO/PM for approval/disapproval prior to exceeding 75% contracted repair price for that item. Written authorization for repair of recoverable items not listed, or extraordinary repair actions must be received from 407 SCMS through the PCO prior to commencement of required activity. If the Government concurs, the ACO will request a repair proposal including delivery date. Approved ERAs shall be funded via the Over and Above CLIN prior to closing the funded delivery order. TAT shall be halted on any item under consideration for an ERA action. This shall also apply to the next higher assembly, if applicable. Once a determination is made, and if necessary all funding and contract actions are complete, TAT shall resume.

4.3.5.1 The Contractor shall submit a repair proposal within five calendar days through the ACO to the PCO/PM for concurrence approval/disapproval. Written authorization for repair of recoverable items not listed, or beyond economical repair actions must be received from 407 SCMS through the PCO prior to commencement of required activity.

4.4 Item Unique Identification (IUID):

Item Identification and Valuation, unique item identification is a method of marking items with unique item identifiers which have machine-readable data elements. Unique item identification is required for all items to be delivered to the DoD that meet the criteria established in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.

4.4.1 The Contractor shall mark items in accordance contract clauses, and Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S.

Military Property. In accordance with the Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government agent or Contractor representative responsible for causing “life cycle events” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged

– sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update applicable item record(s) in the IUID Registry.

4.5 Government-Industry Data Exchange Program (GIDEP): The Contractor shall participate in GIDEP in accordance with GIDEP Operations Manual S0300-BT-PRO-010, Government- Industry Data Exchange Program. The Contractor shall submit all applicable data to GIDEP, as it is generated, in accordance with the CDRLs.

4.5.1 The Contractor shall review each Alert/Safe-Alert report received from GIDEP to determine if the item or process for which the Alert/Safe Alert report is issued is applicable to the contract/order and take appropriate action. Upon the determination that an Alert/Safe-Alert report is applicable, the Contractor shall inform the impacted organizations and subcontractors in accordance with the CDRLs. The Contractor shall maintain a record of the status and disposition

PR: FD2060-16-00962 PWS 7

of all Alert/Safe-Alert reports in accordance with the CDRLs. [CDRL A005, DI-QCIC-80125B, Alert/Safe Alert; CDRL A006, DI-QCIC-80126B, Response to an Alert/Safe Alert]

4.6 Packaging: The Contractor shall package and mark material in accordance with the contract (basic and/or order, as applicable) in accordance with the attached Air Force Materiel Command (AFMC) Form 158, Packaging Requirements. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with Department of Defense (DoD) 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). ). The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns. The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to electrostatic discharge damage in accordance with MIL-STD-1686C, Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices), and MIL-HDBK-263B, Military Handbook / Electrostatic Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices). In accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.

4.7 Counterfeit Electronic Parts: The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronics parts being installed in end items or otherwise entering the USAF/DoD inventory.

The system shall incorporate processes/procedures to address the requirements listed in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The Government's review of the Contractor’s system will be accomplished as part of the evaluation of the Contractor’s purchasing system in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.

4.7.1 Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI- MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI- MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted AS5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. (CDRL A007, DI-MISC-81832, Counterfeit Prevention Plan)

PR: FD2060-16-00962 PWS 8

4.7.2 At a minimum, the CPP shall address:

4.7.2.1 Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.

4.7.2.2 Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency.

Any contractor-derived definitions must be included in an appropriate CPP appendix or annex.

(Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)

4.7.2.3 Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)

4.7.2.4 Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, which shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

4.7.2.5 Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)

4.7.2.6 Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such

PR: FD2060-16-00962 PWS 9

requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E)

4.7.2.7 Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, paragraph 4.1.4, appendix E)

4.7.2.8 Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government.

(Ref. AS5553, paragraph 4.1.6, appendix F)

4.7.2.9 Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, paragraph 4.1.7, appendix G)

4.7.2.10 Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said

PR: FD2060-16-00962 PWS 10

training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.

4.8 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. The following metrics will be monitored: GFM In-Transit, Repairable GFM Accountability and Assets Not on Contract. If CAV-AF training is required, Contractor personnel may send an email to: 406scms.cav.af.ar@us.af.mil. [CDRL A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report]

4.9 Workmanship shall be in accordance with the Contractor’s standard repair procedures and acceptance criteria in accordance with best industry practice. The Contractor shall ensure that best commercial practices are implemented to maintain as a minimum, ISO 9001:2008, or equivalent, quality control standards. The Contractor shall maintain a system to ensure each item is inspected, repaired, and tested in accordance with the engineering data currently being used or developed and approved under this contract. There shall be no more than one (1) validated Product Quality Deficeincy Report (PQDR) per contract year.

4.9.1 Corrective Action for Defects Reported: When requested, the Contractor shall assist the cognizant contract administering organization in evaluation of Deficiency Report (DR) exhibits to determine root cause of deficiencies reported from the depot organizations. Timely correction and reporting of defects found and corrective action to prevent repeated discrepancies shall be an integral part of the contractor’s quality procedures. All deficiencies discovered by the contractor that potentially affect safety, shall be identified to the Administrative Contracting Officer (ACO), within 72 hours of discovery. Such notifications indicate potential safety implications and may result in a CAT I PQDR, and will be processed according to service PQDR policy and procedures. In the event the exhibit is tested and shows no sign of malfunction, i.e.

retest OK (Retok), the Contractor shall annotate this and return it to the Government with no additional charge. If corrective action is required, it will also extend to the performance of all sub-contractors and will be responsive to data and product forwarded from users. The complete processing of Material Deficiency Report (MDR)/Quality Deficiency Report (QDR) shall be at no additional cost to the Government. No more than one validated Product Quality Deficiency Report (PQDR) may be allowed per quarter. Guidance for resolution is provided in T.O. 00- 35D-54, USAF Deficiency Reporting and DLAR 4155.24, Product Quality Deficiency Report Program.

4.10 Engineering Change Proposal (ECP): The Contractor shall submit a Class I ECP for all changes to the baseline configuration. The ECPs submitted shall be technically accurate, complete, clearly written, and systematically account for the proposed configuration changes.

The Contractor shall notify the Government of all Class II changes, including all substitute parts changes, through Document Change Notices (DCN) within 30 calendar days. (CDRL A003, DI-CMAN-80639C, Engineering Change Proposal) mailto:406scms.cav.af.ar@us.af.mil

PR: FD2060-16-00962 PWS 11

4.10.1 Neither design nor functional capabilities shall be changed, modified or altered except when an ECP is submitted and approved in accordance with EIA 649-B. The Contractor shall submit to 407 SCMS any change notice, design change notice, engineering order, engineering change order, engineering change notice, specification change notice or that which would affect the configuration of the item. The ECPs submitted shall be technically accurate, complete, clearly written, and systematically account for the proposed configuration changes.

Any changes made without written approval from the contracting agency shall require removal at the Contractor’s expense. ECPs generated and approved under a formal retrofit program may be implemented under this contract. However, costs associated with implementation shall be funded by the retrofit program.

4.10.2 Changes to the configuration shall be made only when identified by an approved change.

Examples of such changes are ECPs generated as the result of diminishing sources and preferred spares. Records shall be maintained which readily and systematically account for configuration changes from the baseline configuration.

4.11 Repairs performed under this work specification include all actions necessary to return the items to a serviceable condition. The extent of repair required to assure a serviceable end item efficiently serves its intended purpose shall be determined by the inspection, test, bench check, and required disassembly. A repair is considered successful and an item serviceable when the end item operates and efficiently serves its intended operational purpose in accordance with its system specification, interface control document, and technical data package as tested through an acceptance test procedure. All repairs and procedures shall be complete before returning the item to the Government.

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and services will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Security Regulations: The Contractor shall ensure personnel, information, systems, property, facility and security requirements are met. The Contractor shall comply with all applicable security regulations and clauses listed in the contract.

5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall ensure compliance with DoDD 5205.02E, DoD Directive for Operations Security (OPSEC) and DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual to protect United States (U.S.) Government interests.

5.2.3 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or CUI in accordance with DoD 5220.22-M, National Industry Security

PR: FD2060-16-00962 PWS 12

Program. Applicable equipment shall be safeguarded, maintained and operated in accordance with DoD 5220.22-M.

5.2.4 Security Clearance: The Contractor shall ensure applicable Contractor personnel have security clearances at the Secret level for proper accomplishment of contract/order requirements.

The security clearance shall be obtained in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification. Contractor personnel whose clearances have been suspended or revoked shall immediately be denied access to classified information and/or CUI and classified items.

5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified information and/or CUI.

5.3 Environmental Management System (EMS):

5.3.1 Executive Order (E.O.) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and E.O. 13514, Federal Leadership in Environment, Energy, and Economic Performance, establish the requirement for an EMS.

5.3.2 In accordance with the Assistant Secretary of the Air Force (SAF) Policy Letter, Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations, dated 11 Dec 06, and the Air Force Materiel Command/Vice Commander (AFMC/CV) Policy Letter, Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations, dated 1 Aug 07, Contractor personnel who perform work on any USAF installation shall comply with the EMS requirements established by the installation.

5.3.3 These services shall be performed only at the Contractor’s facility in Las Cruces, New Mexico.

5.4. Affirmative Procurement Programs (APP): In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [http://www.epa.gov/cpg/products.htm] and/or United States Department of Agriculture (USDA)-designated products included in the biobased product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or biobased content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price. In accordance with FAR 23.404(a)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated biobased products. In accordance with the Robins Air Force Base, Georgia / Green Procurement Program (GPP) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.

5.5 Safety Requirements:

http://www.epa.gov/cpg/products.htm http://www.biopreferred.gov/

PR: FD2060-16-00962 PWS 13

5.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoDD 4715.1E, Environmental, Safety, and Occupational Health (ESOH). OSHA and ESOH requirements shall be incorporated into the Contractor’s safety program. While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. In accordance with AFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to the USAF. The contractor shall make required notification of all mishaps, and if requested by the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

5.5.3 Mishap Notification/Investigation: In accordance with AFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF interests.

The Contractor shall ensure the USAF is notified of mishaps. The Contractor shall contact the Contracting Officer’s Representative (COR), if available, or another MFT member by telephone within 16 business hours and the Contractor shall cooperate with USAF safety investigations.

5.5.4 Safety and Health Plan: The Contractor has submitted a Safety and Health Plan under the basic contract, FA8539-11-D-0002. In accordance with Air Force Pamphlet (AFPAM) 91-210, Contract Safety, paragraph 6.4, the Safety and Health Plan has been reviewed by the Safety Office. The Contractor has established and shall maintain a safety program in accordance with OSHA, ESOH, the basic contract Appendix C (Industrial Safety Requirements), and the Safety and Health Plan.

5.6 Inspection of Services: Inspection of Services will be accomplished in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The Government reserves the right to inspect Contractor performance.

5.7 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

5.8 Contractor Manpower Reporting:

5.8.1 In accordance with the Contractor Manpower Reporting / Contractor Quick Reference Guide, the Contractor shall establish a record for the contract/order in the Enterprise-wide Contractor Manpower Reporting Application (eCMRA) no later than 30 calendar days after contract/order award. In accordance with the Contractor Manpower Reporting / Contractor User Guide, the Contractor shall enter Order Data, Contact Data and Location Data.

5.8.2 In accordance with the Secretary of the Air Force for Acquisition (SAF/AQ) Memorandum, Implementation of FY11 National Defense Authorization Act (NDAA) Section http://www.state.gov/j/tip

PR: FD2060-16-00962 PWS 14

8108 of Public Law 112-10 of the Department of Defense and Full-Year Continuing Appropriations Act, 2011, Contractor Inventory, dated Nov 13 2012, the Contractor shall provide an annual count of Contractor/subcontractor personnel performing work if the DoD is the requiring activity, if the acquisition is using U.S. Government appropriated funds, and if the acquisition is equal to or greater than the Simplified Acquisition Threshold (SAT).

5.8.3 In accordance with the Office of the Secretary of Defense (OSD) Memorandum, Enterprise-wide Contractor Manpower Reporting Application, dated Nov 28, 2012, the Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract at the eCMRA site below. Reporting shall be conducted for each fiscal year, which extends October 1 through September 30. While inputs may be made any time during the fiscal year, all data shall be reported no later than October 31 of the following fiscal year. The Contractor may direct questions to the help desk at the eCMRA site. http://www.ecmra.mil

5.9 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area WorkFlow e-Business Suite / Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) in accordance with all applicable clauses located in the basic contract.

6.0 Appendices

6.1 Appendix A: References

Publication Title of Publication

Date of Publication Section(s) that Apply

AFI 91-204 Safety Investigations and Reports

9 August 2012 reissued 8 April 2013 http://www.e-publishing.af.mil/

Paragraphs 1.3.1.1, 2.4.6.1.1- 2.4.6.1.2

AFMC/CV Policy Letter

Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations

1 August 2007 Entire

Assistant Secretary of the Air Force Policy Letter

Conformance with Air Force Environmental Management System (EMS)

11 December 2006 Entire http://www.ecmra.mil/ http://www.e-publishing.af.mil/

PR: FD2060-16-00962 PWS 15

Requirements for Contracts Performed on Air Force Installations

Ike Skelton National Defense Authorization Act for Fiscal Year 2011

(Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note).

2011 Entire

ODASD Memo “Overarching DoD Counterfeit Prevention Guidance”

16 March 2012 Entire

DoDD 5205.02E DoD Operations Security (OPSEC) Program

20 June 2012 http://www.dtic.mil/whs/directives/corres/pub 1.html

Entire

DoD Manual 5205.02-M

DoD Operations Security (OPSEC) Program Manual

3 November 2008 http://www.dtic.mil/whs/directives/corres/pub 1.html

E.O. 13423 Strengthening Federal Environmental, Energy, and Transportation Management

24 January 2007 http://www.gpo.gov/fdsys/pkg/FR-2007-01- 26/pdf/07-374.pdf

E.O. 13514 Federal Leadership in Environment, Energy, and Economic Performance

5 October 2009 http://www.whitehouse.gov/assets/documents/ 2009fedleader_eo_rel.pdf

DoD Directive 4715.1E

Environment, Safety and Occupational Health

19 March 2005 Entire

DoD Manual 5220.22-M

National Industrial Security Program

28 February 2006 Entire http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.gpo.gov/fdsys/pkg/FR-2007-01-26/pdf/07-374.pdf http://www.gpo.gov/fdsys/pkg/FR-2007-01-26/pdf/07-374.pdf http://www.whitehouse.gov/assets/documents/2009fedleader_eo_rel.pdf http://www.whitehouse.gov/assets/documents/2009fedleader_eo_rel.pdf

PR: FD2060-16-00962 PWS 16

FAR and supplements

Federal Acquisition Regulation http://farsite.hill.af.mil

Sections applicable to contract and

PWS

OSD

Memorandum

Enterprise-wide Contractor Manpower Reporting Application

28 November 2012 http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memoran dum.pdf

SAF/AQ

Memorandum

Implementation of

FY11 NDAA

Section 8108, Contractor Inventory

13 November 2012 https://cs.eis.af.mil/airforcecontracting/knowledge _center/Documents/AFFARS_Library/5337/2012- 11-13_saf-aq-memo.pdf

USD

Memorandum

Establishment of the DoD Green Procurement Program

27 August 2004 http://www.wbdg.org/pdfs/dod_gpp_082704.pdf

TO 00-35D-34

USAF Deficiency Reporting and Investigating System

15 March 2006 chg. 1 Entire none Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, Version 2.5

September 15, 2012 www.acq.osd.mil/dpap/UID/attachments/DoD UIDGuideVer2_5.pdf

GIDEP

Operations Manual S0300-

BT-PRO-010

Government- Industry Data Exchange Program

September 2009 http://www.gidep.org/

Chapter 2, Participation Requirements

MIL-STD-130N Department of Defense / Standard Practice / Identification Marking of U.S.

Military Property

17 December 2007 Change 1 – 16 November 2012 http://www.acq.osd.mil/dpap/pdi/uid/docs/MI L-Std130N_Ch1.pdf http://farsite.hill.af.mil/ http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf http://www.wbdg.org/pdfs/dod_gpp_082704.pdf http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.gidep.org/ http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf

PR: FD2060-16-00962 PWS 17

MIL-STD-2073-

1E

Department of Defense / Standard Practice for Military Packaging

15 December 1999, Notice 1, 10 May 2002

EIA 649-B Configuration Management Standard

Apr 2011 Entire

MIL-HDBK 263-

B

Electrostatic Discharge Control Handbook for Protection of Electrical Equipment and Electronic Parts, Assemblies and Equipment

Jan 2007 (July 94) Entire

MIL-STD-1686C Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)

25 Oct 1995

Publication 4160.21-M-1

Department of Defense Demilitarization Manual

18 August 1997 Entire

AS5553A Fraudulent/Counte rfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition

Revision A 2013-01-21

DLAR 4155.24

Product Quality Deficiency Report

Entire

AFPAM 91-210 Contract Safety 6 January 2012 Entire Public Law 91-

Occupational Safety and

1970 Entire

PR: FD2060-16-00962 PWS 18

Appendix B: Repair Candidates

NSN Part Number Noun FY 17 FY 18 FY 19 FY 20 FY 21 7045-01- 615-9683

1200003-

DDR

Cartridge

1 1 1 2 2

7025-01- 615-8968

1100001-

DDR 2 2 3 3 3

5836-01- 615-8516

0300032-

DDR 2 2 3 7 5

7045-01- 615-9684

0510004-

DDR

Cartridge

5 5 5 5 5

Health Act of

4.3.1 Turn Around Time (TAT): TAT is measured from the Contractor’s receipt of the item and funded delivery order, whichever is latest, to the time the asset is shipped back to the Government. TAT for repairs of LRUs shall be in accordance with the a...
4.3.2 Obsolete Parts
4.3.4 Condemnation

File details come from the government source that posted it. Updated .