CDRL_A001_Commercial_Asset_Visibility_AF.pdf
PDF 102 KB Posted
- Attached to
- Printed Wiring Assembly Numeric Display Federal contract opportunity
- Solicitation number
- FA8539-16-R-0010
About this file
CDRL A001 Commercial Asset Visibility AF
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL_A004_Test_Inspection_Reports.pdf | ||
| PWS.docx | DOCX document | |
| 1786046_TRNSPDATA_REPORT.pdf | ||
| CDRL_A007_Management_Plan.pdf | ||
| CDRL_A006_Status_Reports.pdf | ||
| FA853916R0010.pdf | ||
| CDRL_A009_Minutes.pdf | ||
| CDRL_A002_Engineering_Change_Proposal.pdf | ||
| 1786049_PKGRQMT_REPORT.pdf | ||
| CDRL_A010_Safety_Assessment_Report.pdf | ||
| CDRL_A005_PRODUCT_DRAWINGSMODELS_AND_ASSOCIATED_LISTS.pdf.docx | DOCX document | |
| QASP.pdf | ||
| CDRL_A003_Test_Plans.pdf | ||
| CDRL_A008_Conference_Agenda.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
APQ-166
E. CONTRACT / PR NO.
FD20601501128
F. CONTRACTOR
1. DATA ITEM NO.
a001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Paragraph 4.18
6. REQUIRING OFFICE
FA8539
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See block 16
12. DATE OF FIRST
SUBMISSION
See block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Branham, Douglas WNAME: 27 OCT 2015DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DoD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
408 SCMS GULB
235 Byron ST Suite 19A 31098
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Adams, Jessica L
407 SCMS / GULBC
478-926-5950
H. DATE
04 NOV 2015
I. APPROVED BY
//DIGITALLY SIGNED//
JORDAN.KELLY.J.1386290730
407 SCMS / GULCB 468-926-3929 / 468-7824
J. DATE
04 NOV 2015
Page 1 of 1DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 27 Jan 2016
PREVIOUS EDITION MAY BE USED.
File details come from the government source that posted it. Updated .