CDRL_A001-A005.pdf

PDF 118 KB Posted

Attached to
Repair of the Air Speed Indicator
Solicitation number
FA8538-19-R-0005
Issued by

About this file

ATTACHMENT #3 CDRL A001-A005

View the file

Other files

File Type Posted
Packaging_requirements.pdf PDF
DD2875_blank_SAAR.pdf PDF
FA8538-19-R-0005_Solicitation.pdf PDF
CAVAF_Reporting_Requirement_SOW.pdf PDF
PWS.pdf PDF
Wage_Determination_Report.pdf PDF
GFP_Attachment.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

C-130 Air Speed Indicator

E. CONTRACT / PR NO.

FD20601900192

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility Air Force (CAV) Reporting

3. SUBTITLE

CFM End Item Reporting

4. AUTHORITY

di-mgmt-81838

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

SEE BLK 16 FOR REFERENCE

6. REQUIRING OFFICE

409 SCMS/GUMBB

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

SEE BLK 16

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Arnold, Melissa ANAME: 29 OCT 2018DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 5: Contract Reference: PWS Paragraph 4.3.3 and CAV AF Reporting Requirements Document

2. Block 4: All reporting shall be submitted in the English Language.

3. Blocks 10, 11, 12, 13:

a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.

b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.

c. Data shall be current within 24 hours of the last End Item maintenance occurrence.

4. Blocks 7, 8, 14:

a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.

b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8538. MARK FOR: Address in block 14A.

c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address:

larry.miller.24@us.af.mil

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 14 NOV 2018

409 SCMS/GUMBB

460 Richard Ray Blvd Bldg 301, Ste 19A Robins AFB, GA 31098

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Miller, Larry T

409 SCMS / GUMBB

478-327-3605

H. DATE

15 NOV 2018

I. APPROVED BY

//DIGITALLY SIGNED//

CLARK.JOSEPH.K.1172896452

409 SCMS / GUMCC 478-926-7277 / 468-7277

J. DATE

15 NOV 2018

Page 1 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Nov 2018

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

C-130 Air Speed Indicator

E. CONTRACT / PR NO.

FD20601900192

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM Production Monthly Status Report

4. AUTHORITY

di-psss-81995/t

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Paragraph: 4.6

6. REQUIRING OFFICE

409 SCMS/GUMBB

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLK 16

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Arnold, Melissa ANAME: 16 OCT 2018DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reporting shall be submitted in the English Language.

b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

2. Blocks 10, 11, 12, 13:

a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.

b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the (Requiring Office), Program Manager (PM) or the Production Management Specialist (PMS).

c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".

3. Block 9:

a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Reason for Use). (Date of Determination). Other requests for this document shall be referred to (DoD Controlling Office)

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.

2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:

409 SCMS/GUMBB

460 Richard Ray Blvd Bldg 301, Ste 19A Robins AFB, GA 31098

0 1 0

0 1 015. TOTAL

Page 2 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Nov 2018 larry.miller.24@us.af.mil

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 14 NOV 2018

G. PREPARED BY

Miller, Larry T

409 SCMS / GUMBB

478-327-3605

H. DATE

15 NOV 2018

I. APPROVED BY

//DIGITALLY SIGNED//

CLARK.JOSEPH.K.1172896452

409 SCMS / GUMCC 478-926-7277 / 468-7277

J. DATE

15 NOV 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

C-130 Air Speed Indicator

E. CONTRACT / PR NO.

FD20601900192

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

Annual Government Property Physical Inventory Report

4. AUTHORITY

di-mgmt-80441c

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Paragraph 4.7

6. REQUIRING OFFICE

409 SCMS/GUMBB

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

E

10. FREQUENCY

ANNLY

11. AS OF DATE

See Blk 16

12. DATE OF FIRST

SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Arnold, Melissa ANAME: 16 OCT 2018DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reports shall be submitted in the English Language.

2. Blocks 10, 11, 12, 13:

a. This report will be provided annually. Reporting Period is one year.

b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.

c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.

3. Block 9:

a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Reason for Use). (Date of Determination). Other requests for this document shall be referred to (DoD Controlling Office).

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.

Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:

larry.miller.24@us.af.mil

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 14 NOV 2018

409 SCMS/GUMBB

460 Richard Ray Blvd Bldg 301, Ste 19A Robins AFB, GA 31098

0 1 0

0 1 015. TOTAL

Page 3 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Nov 2018

G. PREPARED BY

Miller, Larry T

409 SCMS / GUMBB

478-327-3605

H. DATE

15 NOV 2018

I. APPROVED BY

//DIGITALLY SIGNED//

CLARK.JOSEPH.K.1172896452

409 SCMS / GUMCC 478-926-7277 / 468-7277

J. DATE

15 NOV 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

C-130 Air Speed Indicator

E. CONTRACT / PR NO.

FD20601900192

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

IUID Marking Plan

3. SUBTITLE

IUID Marking Plan

4. AUTHORITY

di-mgmt-81803

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Paragraph 4.3.1.2.1

6. REQUIRING OFFICE

409 SCMS/GUMBB

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

E

10. FREQUENCY

See Block 16

11. AS OF DATE

See Blk 16

12. DATE OF FIRST

SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Arnold, Melissa ANAME: 13 NOV 2018DATE:

Block 4: Contractor format acceptable on electronic media. Data Item to be used as a guide for content.

Block 7: Acceptance via WAWF under DODAAC: FA8538.

Block 8: The government will have 15 calender days to review and provide comments, subsequently the contractor will have 15 calendar days to correct and resubmit.

Block 9: Distribution statement attached.

Block 11, 12: 30 Days after contract award.

Block 13: Only if there is a revision in the IUID Marking Plan.

Block 14: Procuring Officer(s) e-mail along with Integrated Product Team e-mail list will be provided as required.

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 14 NOV 2018

409 SCMS/GUMBB

460 Richard Ray Blvd Bldg 301, Ste 19A Robins AFB, GA 31098

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Miller, Larry T

409 SCMS / GUMBB

478-327-3605

H. DATE

15 NOV 2018

I. APPROVED BY

//DIGITALLY SIGNED//

CLARK.JOSEPH.K.1172896452

409 SCMS / GUMCC 478-926-7277 / 468-7277

J. DATE

15 NOV 2018

Page 4 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Nov 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

C-130 Air Speed Indicator

E. CONTRACT / PR NO.

FD20601900192

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

IUID Marking Activity, Validation and Verification Report

3. SUBTITLE

IUID Marking Activity, Validation and Verification Report

4. AUTHORITY

di-mgmt-81804a

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Paragraph 4.3.1.2.2

6. REQUIRING OFFICE

409 SCMS/GUMBB

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

E

10. FREQUENCY

QRTLY

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

45 DAC

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Arnold, Melissa ANAME: 13 NOV 2018DATE:

Block 4: Contractor format acceptable on electronic media. Data Item to be used as a guide for content.

Block 7: Acceptance via WAWF under DODAAC: FA8538.

Block 9: Distribution statement attached.

Block 10, 11, 12, 13: The IUID Marking/Verification Report shall be submitted quarterly verifying the implementation of the IUID Marking Plan. First submission shall be 45 days after contract award. The assets reported can be shipped/delivered to the DoD prior to the submittal of this report.

Block 14: Procuring Officer(s) e-mail along with Integrated Product Team e-mail list will be provided as required.

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 14 NOV 2018

409 SCMS/GUMBB

460 Richard Ray Blvd Bldg 301, Ste 19A Robins AFB, GA 31098

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Miller, Larry T

409 SCMS / GUMBB

478-327-3605

H. DATE

15 NOV 2018

I. APPROVED BY

//DIGITALLY SIGNED//

CLARK.JOSEPH.K.1172896452

409 SCMS / GUMCC 478-926-7277 / 468-7277

J. DATE

15 NOV 2018

Page 5 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Nov 2018

File details come from the government source that posted it.