CDRLs_C001_to_C003.pdf

PDF 111 KB Posted

Attached to
Hoisting Unit, Aircraft Component
Solicitation number
FA8532-15-R-90217
Issued by

About this file

CDRLs (ECP NOR RFV)

View the file

Other files

File Type Posted
FA853215R90217______0004.pdf PDF
252.204-7008.docx DOCX document
QA_31_August_2015.pdf PDF
FA853215R90217______0003.pdf PDF
FA853215R90217______0002.pdf PDF
Q A_21_AUG_2015.pdf PDF
TMCR_12MAY2015.pdf PDF
PKG_AFMC_158.pdf PDF
EDL_25MAR2015.pdf PDF
FA853215R90217.pdf PDF
CDRL_PROOF_LOAD_CERTS_A001.pdf PDF
CDRL_TMCR_B001.pdf PDF
IUID_CHECKLIST.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1730-01-087-7148

Hoisting Unit, Aircraft Component

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

C001 Engineering Change Proposal

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80639D DRAWING 160D497840-3 AFLCMC/WNZEA

7. DD 250 REQ 9. DIST STATEMENT 10 FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

SD REQUIRED ASREQ ASREQ

C a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A N/A SUBMISSION

N/A Reg Repro

16. REMARKS

The contractor shall submit Engineering Change Proposal (ECP)for Government approval of any necessary changes to the baseline configuration of the Aircraft Component Hoisting Unit drawing 160D497840-3. An ECP is required for each individual drawing to be changed or updated.

BLK 7: Acceptance is at Destination, Robins AFB GA.

Contractor shall invoice in Wide Area Workflow.

BLK 8: The Government shall approve/disapprove ECP within 21 days* following receipt of the ECP.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Other requests for this document shall be referred to WNZEA.

BLK 14: For each submission, soft copy shall be provided via electronic media utilizing standard Microsoft Office applications to the e-mail addresses below.

AFLCMC/WNZBA: Vincent.Stewart@us.af.mil (PM) AFLCMC/WNZEA: Ashkan Seratnahaei@us.mil.mil (ENG) AFLCMC/WNKAAB: Kathryn.Canady@us.af.mil (PCO)

*Days are calendar days.

See BLOCK 16

15. TOTAL 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Ashkan Seratnahaei 04/02/2015 DD FORM 1423-2, AUG 96 (EG) PREVIOUS EDITION MAY BE USED Page 1 of 1 Page(s) c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=ROZEBOOM.VICTOR.E.JR.1026994850

2015.05.26 13:33:34 -04'00'

C

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1730-01-087-7148

Hoisting Unit, Aircraft Component

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

C002 Notice of Revision (NOR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80642D DRAWING 160D497840-3 AFLCMC/WNZEA

7. DD 250 REQ 9. DIST STATEMENT 10 FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

SD REQUIRED ASREQ ASREQ

C a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A N/A SUBMISSION

N/A Reg Repro

16. REMARKS

The contractor shall submit Notice of Revision(NOR) detailing any changes resulting from each approved Engineering Change Proposal (ECP). A NOR is required for each individual drawing to be changed or updated.

BLK 7: Acceptance is at Destination, Robins AFB GA.

Contractor shall invoice in Wide Area Workflow.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Other requests for this document shall be referred to WNZEA.

BLK 14: For each submission, soft copy shall be provided via electronic media utilizing standard Microsoft Office applications to the e-mail addresses below.

AFLCMC/WNZBA: Vincent.Stewart@us.af.mil (PM) AFLCMC/WNZEA: Ashkan Seratnahaei@us.mil.mil (ENG) AFLCMC/WNKAAB: Kathryn.Canady@us.af.mil (PCO)

See BLOCK 16

15. TOTAL 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Ashkan Seratnahaei 04/30/2015 DD FORM 1423-2, AUG 96 (EG) PREVIOUS EDITION MAY BE USED Page 1 of 1 Page(s) c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=ROZEBOOM.VICTOR.E.JR.1026994850

2015.05.26 13:34:27 -04'00'

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP X TM OTHER

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1730-01-087-7148 Hoisting Unit, Aircraft Component

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

Request for Variance (RFV)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80640D DRAWING 160D497840-3 AFLCMC/WNZEA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

SD ASREQ ASREQ b. COPIES

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

A N/A N/A Reg Repr o

16. REMARKS See block 16 The contractor shall submit RFV for Government approval of any necessary changes to the baseline configuration of the Aircraft Component Hoisting Unit drawing 160D497840-3. An RFV is required for each proposed variance.

BLK 7: Acceptance is at Destination, Robins AFB GA. Contractor shall invoice in Wide Area Workflow.

BLK 8: The Government shall approve/disapprove RFV within 21 days* following receipt of the RFV.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Other requests for this document shall be referred to AFLCMC/WNZEA.

BLK 14: For each submission, soft copy shall be provided via electronic media utilizing standard Microsoft Office applications to the e-mail addresses below.

AFLCMC/WNZBA: Vincent.Stewart@us.af.mil (PM) AFLCMC/WNZEA: Ashkan Seratnahaei@us.mil.mil (ENG) AFLCMC/WNKAAB: Kathryn.Canady@us.af.mil (PCO)

*Days are calendar days.

15. Total

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Ashkan Seratnahaei 7/21/2015

DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages

07/21/2015SPANGENBERG.NATALIA.W.128

7748988

Digitally signed by SPANGENBERG.NATALIA.W.1287748988 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=SPANGENBERG.NATALIA.W.1287748988 Date: 2015.07.21 11:07:19 -04'00'

C003