Atch-4_ExhibitA_CDRL_CY19.pdf
PDF 2 MB Posted
- Solicitation number
- FA8528-18-R-0001
About this file
Atch-4_CDRL
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
J rorm ApprovafJ
0MB No. 0704-0188
The public ieportlng 111.fden lor this COiiection or lnlormallon Is estimated ID average 110 hours per resp0nse, lnduellng Ille Ume lor reviewing Instructions, searching ulsting data sources, gathenng and maintaining Ille data needed, and completing and reviewing Ille ccllection or lnlormation. Seod comments regarding this bllden estimate or any other aspect ol this collection or lnlormation, lnduellng suggestions lor reducing this burden, to the Depanment of Delense, Executive Snces and Communications Directorate (0704-0188). Respondents should be aware that nolwllhslandlng any other provision al law, no person shall be subject lo any penalty for lallng to comply with a collection or Information II II does not display a c1.mm!ly valid 0MB cor1/ol number
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed In Block E, A. CONTRACT LINE ITEM NO. B. EXHIBIT C.CATEGORY
A TOP TM OTHER MGMT
D. SYSTEM/ITEM F. CONTRACTOR
Predator/Reaber CLS
E. CONTRACT/PR NO.
FA8528-19-C-0001 GA-ASI
1. DATA ITEM NO. 2. TITLE OF THE DATA ITEM 3.SUBTITLE
A001 Government Prooertv Inventorv Reuort GFP Report (GFE/GFM/ST /STE) 4, AUTHORITY (Data Acqu/sllltltl Ooeumenl Na./ 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
RT-Mlr.:iMT-Gft.i ll1 R PWS �.":I
7.DD250 REQ 9. u ... , S1A11:Mt:N1 10. FREQUENCY 12 DATE OF FIRST 14. DISTRIBUTION
REQUIRED SUBMISSION
SD BI-ANNL BLK 16
b.COPIES
I.APP CODE D 11.ASOFDATE 13 DATE OF SUBSEQUENT a.ADDRESSEE Flnal
SUBMISSION
N/A BLK 16 Ill It' 1.6 Draft Rag Repro
16. REMARKS AFLCMC/WIILR 0 l (I
Block 4: DID Is tailored as follows- AFLCMC/WIIL, GFP C l I ll
Contractor shall deliver report In format designated at the DOD AFLCMC/OET) o I J u
Procurement Toolbox I (http://dodprocurementtoolbox.com/slte-pag es/ g fp-attach men ts)
Block 7: Submit DD Form 250 to AFLCMC/WIILR
Block 9: Dlstrlbutlon statement D: Distrlbutlon authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Block 12: Initial report shall be delivered no later than 30 days after contract award.
Blocks 11, 13: Subsequent reports shall be delivered bl-annually.
Block 14:
a. Submit via electronic media using GFP Data Input Spreadsheet
(XLSX)
b. The contractor shall submit via the current Enterprise Data system.
I
A
II
t (""
A rH'"I' . .,.. / II i V
G. PREPARED BY
I H. DATE \........11.APPR - ,fJ JI/. W///( JJ;i,il/7 Joseph V. Collura Jr. 11 Oct 2017
I �,,1r - 'I'J/lfl r,� .·,.,,,,cr- , I
11.ESTIMATED
TOTAL PRICE
Page 1 of40
I t-orm 7J.pproved
11 Dsts Item) 0MB No. 0704.()188
The public repoftlng bl.Iden ror ll'lis colleetlon or lnlonnaUon Is esamated IO avera119 110 hours per response. Including Ille Hma for reviewing lnsll\lctlons, saari:hing exlsllng dala sources, galherlng and malnlalnlng the dala needed, and complaHng and ravtewtng the collacHon of lnlormation, Sand comments ragardlng ll'lis tx.nlen estimale or any other aspecl or lhls collection of Information, Including sug"851ions ror reducing this burden, to Iha Daparttnenl of Derense, e.ecutiva SerAcas and CommunlcaUons Dlraetorale (0704-0188). Respondents sho!Ad be aware that not �lhstanding any other provision ol law, no parson shall be slmject to any penalty for lal�ng to comply �lh a collacHon oflnlormation If II does nol display a a.mmtly valid 0MB control number.
Please do not ratum your ronn to the above organization. Send completed form to the Government Issuing Contracting Offlcar for the ContractJPR No. llsted In Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT C. CATEGORY
A TDP TM OTHER MGMT
D.SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Predator/Reaper CLS FAB528-19-C-001ll GENERAL ATOMICS - ASI
1.DATAITEMNO. 2, TITLE OF THE DATA ITEM 3. SUBTITLE
A004 CONTRACT PERFORMANCE REPORT lCPRl CPR
4. AUTHORITY a,«a A�JC.IOn Document No.J 5. CONTRACT REFERENCE 6. REQUIRING OFFICE ftT-1.tnUT-R'I A i:::.:.A /T DWQ .i1 ':II 1 AFLCMC/WIILR
7.DD250 REC 9. D1$T $1 ATEIIENT 10. FREQUENCY 12 UAI E OF FIRST 14. DIST RIBUTION
L'f
REQUI RED SUBMISSION MTHLY
BLK 16 b.COPIES
8.APPCODE 11.ASOFDATE 13DATEOFSUBSEQUENT a.ADDRESSEE Final
N/A BLK 16 SUBMISSION
Submission BLK 16 Draft Reg Repn, 16.REMARKS -AFLCMC / WII LR 0 1 0
Per DOD Earned Value Management Implementation Guide October 2006. Earned Value is not appropriate to thls contract.
Block 4: Contractor format is acceptable.
a. Delete first sentence of paragraph b.
b. Delete any mention of Earned Value verbiage.
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delivery to account for all previous submissions.
Block 9: Distribution statement D: Distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011). Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson
AFB, OH 45433-7101.
Block 12: lnlttal report shall be delivered no later than 25 calendar days after first full month following contract award.
Blocks 11, 13: Delivered on the 25th day of each subsequent month.
Block 14:
a. Submit via electronic media using Microsoft Office.
b. The contractor shall submit via the current Enterprise Data system.
c. Submit via electronic media using Microsoft Office format. Separate Information for both MQ-1 and MQ-9. Govt requires that contractor provide CPR In the same format and same level of detail as the product currently provided during CLS CYlO. Format should Jnclude, but is not limited to the monthly expenditure detafls.
15. TOTAL /J'
d o l 0
... ,t
G. PREPARED BY 1H. DATE l�PR07A' ft
�#7/ JJ;Zth? Joseph v. Collura Jr. 11 Oct 2017
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAYrD. ... . �
I
11.ESTI MATED
Page4of40
I Form Approved
(1 Data llem) 0MB No. 0704-0188
The publlc reporting bun!en for lhiS collecllon of Information Is estimated lo average 110 hours per response, Including the Ume lor reviewing lnslructions, searching exlsUng data sources. gathering and malnlalnlng the data needed. and complellng and reviewing !he collection ol lnloonation. Send comments regarding this burden estimale or any other aspecl oltlis collection ol lnlofmation, lrdudlng suggestions for n!duclng tlis burden, to the Department of Defense, Execullve Senrices and Communications Dlrectora1e (0704-0188). Respondents should be aware lhal not withstanding any other provision or law, no parson shalt be subject to any penalty for falling lo comply wOh a collection ol lnlonnatlon II It does not dlsplay a currentiy valid 0MB r;:onln,I nlffbar.
Please do not return your form to the above organlzaUon. Send completed form to Ula Government Issuing Contracting Officer for the Contract/PR No. llsted In Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
A TOP TM OTHER MGMT
D. SYSTEMnTEM E. CONTRACT/PR NO. F. CONTRACTOR Predator/Reaper CLS FA8528-19-C-000l GENERAL ATOMICS - ASI
1. DATA ITEM NO. 2. TITLE OF THE DATA ITEM l,SUBTITLE SOFTWARE MAINTENANCE
A040 STATUS REPORT TECHNICAL REPORT
4. AUTHORITY (O,i/a,f,aiUl!lkln Documen1 No.} 5. CONTRACT REFERENCE 6. REQUIRING OFFICE nr.ur.ru,y_.,,.�,,. A,r �''"" Rlnrk 16 .a.a:1 t"Mt":/WIIL R
7.DD250REQ 9. DIST STATEMENT 10. FREQUENCY 12 DATE OF FIRST 14. DISTRIBUTION
LT
REQUIRED
MTHL¥
SUBMISSION
30 Dayl! ARO b.COPIES
I.N>PCODE 11. AS OF DATE 13 DATE OF SUBSEQUENT a.ADDRESSEE Flnal tt/11 450AC SUBMISSION
See BLK 16 Draft Reg Repra
16.REMARKS AFLCMC/WIILR 0 1 I)
Block 4: FORMAT: DI-MGMT-80368/T, may be combined with monthly Sustaining Eng[neerlng Report, In a separate section.
a. CONTENT. Delineate and provide accurate status of all approved SCRs and, as applicable, map to any fielded Software DRs on which effort was expended and summarize progress/problems. Status of all Software Related field DRs and where all System Change Requests (SCRs) are within the contractors' software maintenance process: Requirement Analysfs, Design, Code and Unit Test, Integration Test, HIL/SIL Test, System Test, Tech Data development, estimated completion, and issues.
b. List total man-hours staffing devoted to software maintenance for Prime and all Subs during the month for each of the following tasks.
1. Software Quality Assurance
2. PC Development Support
3. Flight Controls Maintenance
4. Software Configuration Management
s. Project Engineering SME support
6. TIP&C Management
7. Software Initial Planning Development and Field Support
8. ODCs and Admln Support
9. Investigations
10. Software Sustainment for Fielded Known Anomalies
c. Ust any Self-Initiated software maintenance tasks performed and summarize each. Indicate the approximate man-hours devoted to the particular effort.
d. List any proposed software maintenance activities studies/projects awaiting PCO/COTR approval.
Block S: PWS 4.3.11, 4.3.11.2, 4.3.12.3.1
Block 7: Contractor shall submit final letter of transmittal along with the Receiving Report upon final delfvery to account for all previous submissions.
Block 9: Distribution statement D distribution authorized to the Department of Defense (DOD) and U.S. DOD Contractors only (Critical Technology) (01 January 2011), Other requests shall be referred to AFLCMC/WIIK, 2530 Loop Road West, Wright-Patterson AFB, OH 45433-7101.
Block 13: Subsequent submissions shall be received by the Government NLT the 15th business day of the following month
Block 14: The contractor shall submit via the current Enterprise Data system.
/ ) �5. TOTALA/ 0 1 ti
G. PREPARED BY IH.DATE
I �
RO
�� .. ft #b//11 J.
D
Ah h Joseph V. Collura Jr. 11 Oct 2017 //) '// I?
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MA�D. vr , , '
11.ESTIMATED
Page40 of40
File details come from the government source that posted it.