FA8526-19-R-0009.pdf
PDF 2 MB Posted
- Attached to
- C-17 Globemaster III Sustainment Contract (G3)
- Solicitation number
- FA8526-19-R-0009
About this file
This solicitation seeks proposals for a C-17 Globemaster III sustainment contract. The proposed contract is an indefinite delivery, indefinite quantity agreement for 9 years and 8 months with 11 ordering periods to provide sustainment support services for the C-17 worldwide fleet. Services include program and project management, field services, engineering, laboratory sustainment, engine sustainment, aircraft integrity programs, technical orders, supply chain management, material improvement projects, obsolescence services, software design and testing, and depot maintenance and modifications. The anticipated awardee is The Boeing Company. Proposals are due by March 5, 2020. The Department of the Air Force Materiel Command will administer the contract.
Globemaster III Sustainment Contract RFP
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)
PREVIOUS EDITION NOT USABLE Prescribed by GSA – FAR (48 CFR) 53/214(c)
SOLICITATION, OFFER AND AWARD JLSUVY
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15CFR 7900)
RATING
DO: A1
Page of Page
2. CONTRACT NO. 3. SOLICITATION NO.
FA8526-19-R-0009
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
7. ISSUED BY
GLOBEMASTER (C-17), AFLCMC/WLMK
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 327 7137
ROBINS AFB GA 31098-1670
BUYER: Christopher P. Nelson/WLMK christopher.nelson.74@us.af.mil Phone: (478) 926- 7467 Fax: (000) 000-0000 No Collect Calls
FA8526 8. ADDRESS OFFER TO (If other than Item 7)
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTON PAGE(S) (X) Sec. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
X A SOLICITATION/CONTRACT FORM
X B SUPPLIES OR SERVICES AND
C DESCRIPTION/SPECS/WORK STATEMENT
D PACKAGING AND MARKING
X E INPECTION AND ACCEPTANCE
X F DELIVERIES OR PERFORMANCE
X G CONTRACT ADMINISTRATION DATA
H SPECIAL CONTRACT REQUIREMENTS
X I CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER
X J LIST OF ATTACHMENTS
X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
X L INSTRS., CONDS., AND NOTICES TO OFFERORS
X M EVALUATION AND FACTORS FOR AWARD
OFFER (Must be fully completed by offeror)
24. ADMINISTERED BY (If other than Item 7) SCD:B 25. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
X
5. DATE ISSUED 6.REQUISITION/PURCHASE NO
FD20601930790
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until 5:00 (Hour) local time 05-MAR-2020 (Date).
CAUTION- LATE Submissions, Modifications, and Withdrawals: Section L, Provision No 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this section.
10. FOR INFORMATION
CALL:
A. NAME
Chris P Nelson
B. TELEPHONE (NO COLLECT CALLS)
(478 ) 926 -7467
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within 300 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT(See Section I, Clause No 52.232-8)
10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS
14. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated:
AMENDMENT NO. DATE AMENDMENT NO. DATE
15A. NAME AND
ADDRESS OF
OFFEROR
CODE FACILITY 16. NAME AND TITLE OF PERSON
AUTHORIZED TO SIGN OFFER (Type or print)
15B. TELEPHONE NO.
(Include Area Code)
15C.CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE-ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS 20. AMOUNT
21. ACCOUNTING AND APPROPRIATION
SEE SCHEDULE
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN
COMPETITION
10 U.S.C. 2304 (c) ( 1 ) 41 U.S.C. 253 (c) X
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
SOLICITATION
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
C. E-MAIL ADDRESS
christopher.nelson.74@us.af.mi l
FA8526-19-R-0009
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
C-17 Globemaster III Sustainment Contract (G3)
1) The contract line item numbers (CLINs) designated in this ID/IQ contract refer to services and supplies available for acquisition during a specifically designated time period. As task orders or delivery orders are placed against this contract, it is contemplated that there may be a need to include requirements for options within those orders.
When options are to be utilized in task or delivery orders, the numbering for the option CLIN(s) may not match the numbering or designated ordering periods contained in the Indefinite Delivery/Indefinite Quantity (ID/IQ) contract. In those instances, the orders are deemed to be in compliance with the terms of the ID/IQ contract when the initial CLIN for a specifically designated service or supply within that order is placed within the time period specified in the ID/IQ contract.
Example: In task order 0001, option periods are included for CLINs 0001, 0004, 0011, 0012, 0013, and 0017 of the basic ID/IQ. These option CLINs (designated by 1001, 1004, 1011, 1012, 1013, 1017, 2004, 2011, 2013, 2017, etc.) are deemed to be in compliance with the basic ID/IQ as the initial CLINs were within the designated ordering period.
2) The duration of this ID/IQ contract is 9 years 8 months with the following ordering periods:
Ordering Period Duration Start Stop
Phase I Basic (Ordering Period 1) 6 months 1 Oct 2021 30 Mar 2022 Ordering Period 2 7 months 1 Apr 2022 30 Oct 2022 Ordering Period 3 12 months 1 Nov 2022 30 Oct 2023 Ordering Period 4 12 months 1 Nov 2022 30 Oct 2024
Option - Phase II Ordering Period 5 6 months 1 Nov 2024 30 Apr 2025 Ordering Period 6 7 months 1 May 2025 30 Nov 2025 Ordering Period 7 12 months 1 Dec 2025 30 Nov 2026 Ordering Period 8 12 months 1 Dec 2026 30 Nov 2027
Option - Phase III Ordering Period 9 12 months 1 Dec 2027 30 Nov 2028 Ordering Period 10 12 months 1 Dec 2028 30 Nov 2029 Ordering Period 11 12 months 1 Dec 2029 30 Nov 2030
Option FAR 52.217-8 Extension of Services 6 months 1 Dec 2030 30 May 2031
3) Ordering: G3 ordering is limited to United States Air Force (USAF) organizations. Orders may be placed by other organizations upon written authorization by the WR-ALC C-17 Contracting division (DoDAAC FA8526). The C-17 Contracting division will provide other organizations with a Job Control Number (JCN) specific to each order. The contractor shall not accept any order from an organization that does not bear a JCN assigned by the C-17 Contracting division. Ordering Contracting Officers shall provide a copy of the executed task or delivery order and all modifications thereto affecting order price to the C-17 Contracting division Modifications to the ID/IQ contract may only be made by the WR-ALC C-17 Contracting division.
4) The contract minimum value is $10M and the contract ceiling is $23.765B.
5) The exercise of all options is subject to the requirements of FAR 52.217-8 "Option to Extend Services" and FAR 52.217-9, "Option to Extend the Term of the Contract"
6) Notice to Offeror(s)/Suppliers(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
7) All material procured by the prime contractor under a resultant contract must be placed under a Purchase Order or a similar financially obligating document with a subcontractor by end of period of performance; however, deliveries may occur after this date.
8) Offeror shall propose pricing for Phase I CLINs only.
Phase I (Ordering Periods I - IV)
Basic Ordering Period (Ordering Period I) 1 Oct 21 - 30 Mar 22 Applicable to CLINs beginning with "00"
Common Sustainment Labor
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
As a Service Line Item, provide labor to support requirements outlined in Performance-Based Work Statement (PWS) and applicable attachments.
PWS Reference: 4.1.2; 4.1.3; 4.1.4; 4.1.5; 4.1.6; 4.1.6.1; 4.1.7; 4.1.7.1; 4.1.7.2; 4.1.11; 4.2.1; 4.2.1.1; 4.2.1.2; 4.2.1.3; 4.2.1.4;
4.2.1.5; 4.2.1.6; 4.2.1.6.1; 4.2.1.6.2; 4.2.1.7; 4.2.1.7.1; 4.2.1.7.2; 4.2.1.7.3; 4.2.1.7.4; 4.2.1.7.5; 4.2.1.7.5.1; 4.2.1.7.5.2; 4.2.1.7.5.3;
4.2.1.7.6; 4.2.1.7.7; 4.2.1.8; 4.2.1.8.1; 4.2.1.8.2; 4.2.1.9; 4.2.1.11; 4.2.1.11.1; 4.2.1.12; 4.2.1.13; 4.2.1.14; 4.2.1.14.1; 4.2.3;
4.2.3.1; 4.2.3.2; 4.2.3.3; 4.2.3.3.1; 4.2.3.3.2; 4.2.3.3.3; 4.2.3.4; 4.2.3.4.1; 4.2.3.4.2; 4.2.3.4.3; 4.2.3.4.5; 4.2.3.4.5.1; 4.2.3.4.5.1.1;
4.2.3.4.5.2; 4.2.3.4.5.2.1; 4.2.3.4.5.2.2; 4.2.3.4.5.2.3; 4.2.3.5; 4.2.3.6; 4.2.3.7; 4.2.3.8; 4.2.3.11; 4.2.3.14; 4.2.3.15; 4.2.3.16;
4.2.3.16.1; 4.2.3.17; 4.2.3.18; 4.2.3.18.1; 4.2.3.18.2; 4.2.3.19; 4.2.3.20; 4.2.3.20.1; 4.2.3.20.2; 4.2.3.20.3; 4.2.6.22; 4.2.6.22; 4.2.7;
4.2.7.2; 4.2.7.3; 4.2.7.5; 4.2.7.7; 4.2.7.7.1; 4.2.7.8; 4.2.8.5; 4.2.8.6 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
AS9100 9100
NATO AQAP AQAP 2070
TO Sustainment Labor
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 EA
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
R499 As a Service Line Item, provide labor to support TO sustainment requirements outlined in Performance-Based Work Statement (PWS) and applicable attachments.
PWS Reference:4.2.3.13.5; 4.2.3.13.6; 4.2.3.14; 4.2.3.15; 4.2.4; 4.2.4.1; 4.2.4.2; 4.2.4.3; 4.2.4.4; 4.2.4.5; 4.2.4.6; 4.2.4.7; 4.2.4.8;
4.2.4.9; 4.2.4.10; 4.2.4.11; 4.2.4.12; 4.2.4.13; 4.2.4.15; 4.2.4.16; 4.2.4.17; 4.2.4.18; 4.2.4.20; 4.2.4.21; 4.2.4.22; 4.2.4.24; 4.2.4.25;
4.2.4.26; 4.2.4.27; 4.2.4.28; 4.2.4.29; 4.2.4.30; 4.2.4.31; 4.2.4.32; 4.2.7.4 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
NATO AQAP AQAP 2070 AQAP 2070
USAF Unique Labor
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
R499 Labor in support of USAF-unique tasks.
PWS Reference: 4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Canada Unique Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor in support of Canada specific tasks.
PWS Reference:4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Foreign Military Sales :FMS Case:
UK Unique Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
UK Unique Labor
1 LO
R499 Labor in support of UK specific tasks.
PWS Reference:4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
NAMP Unique Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor in support of NAMP specific tasks.
PWS Reference:4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Australia Unique Labor
Item No.
Australia Unique Labor
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor in support of Australia specific tasks.
PWS Reference:4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Kuwait Unique Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor in support of Kuwait specific tasks.
PWS Reference:4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008 2000
Qatar Unique Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor in support of Qatar specific tasks.
PWS Reference:4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
UAE Unique Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor in support of UAE specific tasks.
PWS Reference:4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
India Unique Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor in support of India specific tasks.
PWS Reference:4.2.6.17.2.2; 6.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Kuwait O&I Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor to support Kuwait specific O&I tasks.
PWS Reference: 4.2.2.4 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
NAMP O&I Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor to support NAMP specific O&I tasks.
PWS Reference: 4.2.2.4 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Canada O&I Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor to support Canada specific O&I tasks.
PWS Reference: 4.2.2.4 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
UK O&I Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor to support UK specific O&I tasks.
PWS Reference: 4.2.2.4 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Peculiar Support Equipment Sustainment
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
R499 Labor in support of Peculiar Support Equipment (PSE) sustainment activities.
PWS Reference: 4.2.3.12; 4.2.6.9; 4.2.6.12; 4.2.6.21 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Other Labor
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
J015 Other labor in support of FMS only requirements.
PWS Reference: Requirements are performed in accordance with the PWS and applicable contract attachments.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales :FMS Case:
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
Field Services and RAMS Team
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
J015 Labor in support of field services and RAMS Team activities.
PWS Reference: 4.2.1.10; 4.2.2; 4.2.2.1; 4.2.2.2; 4.2.2.3; 4.2.2.3.1; 4.2.2.5; 4.2.2.5.1; 4.2.2.5.2; 4.2.2.5.3; 4.2.2.6; 4.2.7.6; 4.2.2.4 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Lab Sustainment Labor
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
Labor to support lab sustainment efforts.
PWS Reference: 4.2.3.13.4; 4.2.3.13.4.1; 4.2.6.18.3
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Engine Sustainment
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
Labor in support of egine sustainment activities.
PWS Reference: 4.2.8; 4.2.8.1; 4.2.8.2; 4.2.8.3; 4.2.8.4; 4.2.8.5; 4.2.8.6; 4.2.8.7; 4.2.8.8; 4.2.8.8.1; 4.2.8.9; 4.2.8.11; 4.2.8.12;
4.2.8.13; 4.2.8.14 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Buy American Act/Balance of Payments Program IUID Required: No
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ VARIOUS DESTINATION
ASIP
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Labor in support of ASIP requirements.
PWS Reference: 4.2.3.10.1
ASIP
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
AVIP
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Labor in support of AVIP requirements.
PWS Reference: 4.2.3.10.3 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
PSIP
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Labor in support of PSIP requirements.
PWS Reference: 4.2.3.10.4
PSIP
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
MECSIP
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Labor in support of MECSIP requirements.
PWS Reference: 4.2.3.10.2 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
DMWAG Support Labor
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Labor in support of DMWAG requirements.
PWS Reference: 4.2.1.7; 4.2.1.7.1; 4.2.1.7.2; 4.2.1.7.3; 4.2.1.7.4; 4.2.1.7.5; 4.2.1.7.5.1; 4.2.1.7.5.2; 4.2.1.7.5.3; 4.2.1.7.6; 4.2.1.7.7
DMWAG Support Labor
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) w/ C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Software Maintenance
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
R499
ENGINEERING SERVICES
Labor in support of software maintenance activities.
PWS Reference: 4.2.3.13.3; 4.2.3.13.7; 4.2.3.13.7.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None
Software Maintenance
Item No.
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO
R499
ENGINEERING SERVICES
Labor and material in support of software maintenance activities. Contractor shall not begin work under this CLIN without prior written authorization of the PCO. Written authorization shall include a Not-to-Exceed (NTE) for each task.
PWS Reference: 4.2.3.13.7; 4.2.3.13.7.1
Software Maintenance
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None
LAIRCM Labor (Warner Robins)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
As a Service Line Item, provide Mx/Mod Actions. Pricing in accordance with "Mx-MODS_Pricing" attachment.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
Depot Maintenance Labor Tasks (Warner Robins)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
As a Service Line Item, provide Mx/Mod Actions. Pricing in accordance with "Mx-MODS_Pricing" attachment.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
Depot Maintenance Labor Tasks (Warner Robins)
Block/Non Block Projects (Warner Robins)
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
As a Service Line Item, provide Mx/Mod Actions. Pricing in accordance with "Mx-MODS_Pricing" attachment.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
LAIRCM Labor (San Antonio)
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
As a Service Line Item, provide Mx/Mod Actions. Pricing in accordance with "Mx-MODS_Pricing" attachment.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
Depot Maintenance Labor Tasks (San Antonio)
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
As a Service Line Item, provide Mx/Mod Actions. Pricing in accordance with "Mx-MODS_Pricing" attachment.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
Block/Non Block Projects (San Antonio)
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
As a Service Line Item, provide Mx/Mod Actions. Pricing in accordance with "Mx-MODS_Pricing" attachment.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: DD250 Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
Over & Above Planned Scope
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Negotiated
Over & Above As a service line item, provide planned over and above support. Examples of use: Work discovered during Inspection/Modifications, UDLM Repair, Aircraft Recovery and/or Permanent Repair.
PWS Reference: 4.1.12;4.2.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
*NOTE: Contractor shall provide with their proposal language describing the types of activities or events that would be excluded from O&A activities under this CLIN. Contractor shall provide backup justification and data to support such exclusions.
Over & Above Unplanned Scope
Time & Material Estimated Quantity
U/I Estimated Amount Ceiling Price
1 LO To be Negotiated
Over & Above As a service line item, provide unplanned over and above support. Examples of use: Work discovered during Inspection/Modifications, UDLM Repair, Aircraft Recovery and/or Permanent Repair.
PWS Reference: 4.1.12;4.2.1.10;4.2.3.4.3;4.2.3.16.2;4.2.7;4.2.7.6;4.2.7.7
Over & Above Unplanned Scope
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2000 2000
Repairs for Logistical Reassignment Secondary User
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Repairs for Secondary Users of Logistical Reassignments IAW PWS and applicable attachments. CLINs established on orders should include Noun, NSN, P/N, and S/N if applicable.
PWS Reference: 4.2.6.7
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report (DD250) with Certificate of Completion Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
Conditioned-Based Maintenance (CBM+)
Conditioned-Based Maintenance (CBM+)
To Be Negotiated Quantity U/I Unit Price
EA TBN
R499 Labor to support Conditioned-Based Maintenance requirements outlined in individual orders.
PWS Reference: 4.2.3.4.4
Obsolescence Services and Labor
Item No.
Incentive Firm Target Quantity U/I Target Cost Target Profit Target Price
1 LO
As a Service Line Item, provide Obsolescence labor to support related requirements in the PWS and applicable attachments.
PWS Reference: 4.2.3.16.2
Ceiling Price: $ Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Known Obsolescence Projects
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
As a service line item, provide labor and material to support approved obsolescence mitigation projects.
PWS Reference: 4.2.3.16.2
Known Obsolescence Projects
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Obsolescence Mitigation Projects <$500K
Item No.
Cost Reimbursement - No Fee Quantity U/I Estimated Cost Total Estimated Cost
1 LO
As a service line item, provide mitigation for unknown obsolescence projects which have an estimated NTE of $500,000/project.
Contractor shall not incurr in excess of $2,500,000 per year.
PWS Reference: 4.2.3.16.2 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
Item Unique Identification Phasing
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
R499 Labor in support of Item Unique Identification (IUID) phasing efforts for C-17 material.
PWS Reference: 4.1.2;4.1.2.1
Item Unique Identification Phasing
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
RESERVED
RESERVED
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
Common Sustainment Material
Item No.
Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost
EA
NSN: R499
ENGINEERING SERVICES
As a Service Line Item, provide labor and material to support common sustainment material requirements as outlined in the PWS and applicable attachments.
PWS Reference:
4.1.10;4.2.6;4.2.6.1;4.2.6.2;4.2.6.5;4.2.6.6;4.2.6.8;4.2.6.10;4.2.6.11;4.2.6.13;4.2.6.14;4.2.6.14.1;4.2.6.15;4.2.6.16;4.2.6.17;4.2.6.
17.1;4.2.6.17.2;4.2.6.17.2.1;4.2.6.17.2.3;4.2.6.17.2.4;4.2.6.18;4.2.6.18.1;4.2.6.18.2;4.2.6.18.4;4.2.6.18.5;4.2.6.19;4.2.6.20
Max Fee: % Min Fee: % Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
Subject to Flying Hour Adjustment in accordance with H004. This period of performance is based on XXX flying hours. The result is a rate of (costs $XXX) (price $XXX) per flying hour.
NGSI/NGCQA Material
0050AA
Not Separately Priced
NGSI/NGCQA Material
Quantity U/I Unit Price
LO NSP
As a Service Line Item, provide non-Government Source Inspection (NGSI) and Non-Government Contractor Qualitity Assurance (NGCQA) material to support requirements outlined in the Performance-Based Work Statement (PWS) and applicable attachments. CLIN is based on a notional list of spares, Repair of Reparables (RoR) and support equipment requirements to support the fleet continued sustainment effort. The actual requirements are unknown, dynamic, and firm requirements are defined upon execution.
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250/Receiving Report Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
GSI/GCQA Material
Item No.
0050AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
As a Service Line Item, provide Government Source Inspection (GSI) and Government Contractor Qualitity Assurance (GCQA) material to support requirements outlined in the Performance-Based Work Statement (PWS) and applicable attachments. CLIN is based on a notional list of spares, Repair of Reparables (RoR) and support equipment requirements to support the fleet continued sustainment effort. The actual requirements are unknown, dynamic, and firm requirements are defined upon execution.
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Address Code: S0530A Acceptance: Destination Inspection/Acceptance Report: DD250/Receiving Report Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
IUID Required: No
DLA MICAP Material
Item No.
Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost
1 LO
As a Service Line Item, provide DLA Mission Capable Awaiting Parts (MICAP) support.
PWS Reference: 4.2.5.1.2;4.2.6.5
Max Fee: % Min Fee: % Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250/Receiving Report Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ VARIOUS DESTINATION
Engine Material
Item No.
Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost
As a service line item, provide Engine Material.
Engine Material
PWS Reference:
4.2.6;4.2.6.1;4.2.6.2;4.2.6.3;4.2.6.4;4.2.6.5;4.2.6.6;4.2.6.7;4.2.6.8;4.2.6.9;4.2.6.10;4.2.6.11;4.2.6.12;4.2.6.13;4.2.6.14;
4.2.6.14.1;4.2.6.15;4.2.6.16;4.2.6.17;4.2.6.17.1;4.2.6.17.2;4.2.6.17.2.1;4.2.6.17.2.2;4.2.6.17.2.3;4.2.6.17.2.4;4.2.6.1;4.
2.6.18.1;4.2.6.18.2;4.2.6.18.3;4.2.6.18.4;4.2.6.18.5;4.2.6.19;4.2.6.20;4.2.6.21;4.2.6.22;4.2.6.22
Max Fee: % Min Fee: % Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250 with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ VARIOUS DESTINATION
Engine Storage and Preservation
Item No.
Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost
1 LO
As a Service Line Item, provide labor to support requirements outlined in Performance-Based Work Statement (PWS) paragraph:
4.2.8.1 thru 4.2.8.4; 4.2.87 thru 4.2.8.13; and 4.2.8.15 2-in-1 Invoicing Allowed
Max Fee: % Min Fee: % Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: DD250 Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
MQB Material
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
To Be Negotiated As a service line item, provide Multi-Quantity Buys (MQB). Price shall be negotiated from a defined bill of materials.
Priority: R ROUTINE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
RSP Material
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
As a Service Line Item, provide Readiness Spares Package (RSP) PWS Reference: 4.2.3.16.1;4.2.5.2.6;4.2.6.3
RSP Material
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
Lab Sustainment Material
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
As a service line item, provide lab sustainment material.
PWS Reference: 4.2.3.13.4;4.2.3.13.4.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
Engine Controls and Accesories Material
Item No.
Cost Plus Incentive Fee Quantity U/I Est Target Cost Target Fee Total Estimated Cost
1 LO
Min Fee:
Max Fee:
Underrun Share Ratio: / (USG/KTR) Overrun Share Ratio: / (USG/KTR)
As a service line item, provide Engine Control and Accessory material.
PWS Reference: 4.2.8
Max Fee: % Min Fee: % Overrun Share Ratio: XX/YY (Gov/Ktr) Underrun Share Ratio: XX/YY (Gov/Ktr)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: No
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
MIP Kits, Spares, Parts
Item No.
Quantity U/I Unit Price Amount
MIP Kits, Spares, Parts
1 LO
Material in support of Material Improvement Project kits, spares, and parts.
PWS Reference: 4.2.3.9; 4.2.6.14.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: Yes
MIP Non-Recurring Engineering
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Non-Recurring Engineering in support of Material Improvement Projects.
PWS Reference: 4.2.3.9; 4.2.6.14.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
MIP Non-Recurring Engineering
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Non-Recurring Engineering in support of Material Improvement Projects.
PWS Reference: 4.2.3.9; 4.2.6.14.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
MIP Non-Recurring Engineering
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Non-Recurring Engineering in support of Material Improvement Projects.
PWS Reference: 4.2.3.9; 4.2.6.14.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
MIP Non-Recurring Engineering
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Non-Recurring Engineering in support of Material Improvement Projects.
PWS Reference: 4.2.3.9; 4.2.6.14.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
MIP Non-Recurring Engineering
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Non-Recurring Engineering in support of Material Improvement Projects.
PWS Reference: 4.2.3.9; 4.2.6.14.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
MIP Non-Recurring Engineering
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Non-Recurring Engineering in support of Material Improvement Projects.
PWS Reference: 4.2.3.9; 4.2.6.14.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
MIP Non-Recurring Engineering
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Non-Recurring Engineering in support of Material Improvement Projects.
PWS Reference: 4.2.3.9; 4.2.6.14.1 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
MIP Upgrades
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Labor to provide Material Improvement Project upgrades.
PWS Reference: 4.2.3.9; 4.2.7.2; 4.2.7.5 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report (DD250) with C/COC Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2000
IUID Required: No
RESERVED
Item No.
N/A Reserved for future use.
Class I ODS Substance Application/Use Quantity
NONE
Other Support Costs
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Other support costs in accordance with the PWS.
Other Support Costs
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales :FMS Case:
Proposal Prep
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Number
R499 Proposal Prep Proposal preparation costs for all non-sustainment labor, material, and maintenance & modification orders and modifications requiring a contractor proposal. Value is to be negotiated and established on resulting order.
Offeror may bill for the entire amount upon award.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Date Tailoring
ISO 9001-2008
Travel, Relocation, International Hires
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Government-directed travel as approved for in advance by the PCO.
PWS Reference:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .