DD1423_FATP_(A001)_-_17-33121.pdf

PDF 180 KB Posted

Attached to
C-17 Cable Assembly Set - Fuel Quantity Computer Federal contract opportunity
Solicitation number
FA852618Q0031
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

CDRL A001 - FATP

View the file

Other files for this federal contract opportunity

Other files attached to C-17 Cable Assembly Set - Fuel Quantity Computer, newest first.
File Type Posted
FA852618Q0031_______0004.pdf PDF
EDL_-_Rev_5_(NEW).pdf PDF
FA852618Q0031_______0003.pdf PDF
FA852618Q0031_______0002.pdf PDF
FA852618Q0031_______0001.pdf PDF
DD1423_FATR_(A002)_-_17-33121.pdf PDF
AFMC_FORM_158.pdf PDF
EDL_-_Rev_03.pdf PDF
FA852618Q0031.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

16. REMARKS

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE Draft

b. COPIES

Final

Reg Repro

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

A

C17/PSE/17G460580-501 FD2060-17-33121

A001 First Article Qualification Test Plan and Procedures Cable Assy. Set - Fuel Quantity Computer, O-Level

DI-NDTI-81307A/T AFLCMC/WLE (C-17 Engr)

SS

A D

One/R See Blk 16

See Blk 16

Blk. 4:

The First Article Test Plan (FATP) shall cover pre-production/First Article

(FA) testing and documentation The FATP shall detail the means by which the contractor will satisfy the requirements of the item Technical Data Package (TDP) and any applicable requirements set forth in the related standards, processes and documents referenced therein. The FATP shall describe and/or list: 1) the means by which the contractor shall accomplish the requisite dimensional and functional tests called for in the TDP. 2)plan to document the material and process certifications (BOM/TDP compliance) to include a table cross referencing the material and conformance of materials to applicable material standards shown in the Bill of Materials (BOM) and the detail part the material was used to manufacture; 3) the equipment/instruments to be used to perform the required inspections and tests; 4) the means by which the contractor ensures that all test/inspection instruments proposed/employed carry current, valid, traceable calibrations at the time of the test/inspection; 5) plan for photo documentation of all permanent item markings (ID plates, stenciling, branded labeling, etc. (as applicable by detail)). The FATP shall include text, tables, sketches, photos, etc.

as applicable or required to address the above enumerated requirements.

MIL-HDBK-831 may be used as a guide in preparing the FATP.

NOTE: Any changes to the FATP after approval must be coordinated with the technical authority approving the plan. All coordinating actions shall be processed through the contracting officer in accordance with (IAW) contracting regulations and public law.

NOTE: This item may have sub-assemblies that are designed to Specification Control Drawings (SCD). Those items shall be procured from the approved sources listed on the drawing when possible. If those items cannot be procured from the pre-approved sources, the contractor may design and build their own item IAW the specific SCD. The Contractor-made item shall be approved by the design control authority, Boeing, in order to maintain the quality and configuration of the part. The contractor must qualify IAW Boeing's procedures in order to be considered a source of supply for the subassembly.

See the attached example for information required to be on the cover page of the

FATP.

Anthony Lemar Jones

AFLCMC/WLE; DSN 472-1932

N/A

02-Sep-17

AFLCMC/WLE (C17 Eng)

235 Byron Street, Suite 19A

Robins AFB, GA 31098

E-copy

Searchable Adobe PDF 1 1

Email to:

Anthony.Jones.42@us.af.mil

Marcia.Roach@us.af.mil

Digital Data 1

1 1 1

ROACH.MARCIA.

C.1229969770

Digitally signed by

ROACH.MARCIA.C.1229969770

Date: 2017.11.06 13:25:24 -05'00'

1 2

Reset

CONTRACT DATAREQUIREMENTSLIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B.EXHIBIT C.CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

A

C17/PSE/17G460580-501 FD2060-17-33121

Blk 7:

The Government will accept the Receiving Report through WAWF upon final delivery.

Blk 11/12:

The contractor shall submit the FATP 60 DAC.

Blk 14;

The FATP shall be submitted in searchable Adobe PDF format and submitted by Email.

2 2

Company Logo Company Name

Address Phone and/or email (all optional)

Cage Code

Item Name (taken from Boeing drawing)

First Article Test Plan

Submitted For

NSN: XXXX-XX-XXX-XXXX

Contract No.: XXXXXX-XX-X-XXXX Part No.: 17GXXXXXX-XXX, Rev X

Serial No: XXXX-XXXX (supplied by PCO) CDRL Item No.: A001

Submitted On: MM/DD/YYYY

Test Quantity: XX Contractor Document #.: XXXXXXXX

Rev.: XXX

Submitted To

AFMC AFLCMC/WLE

Attn: (C-17 ENGR) 235 Byron St, Suite 19A Robins AFB, GA 31098

Prepared by: Full Name Checked by: Full Name (Contractor QA) Title: XXXXXXXXX Title: XXXXXXXXX

Signed: __________________ Signed: __________________

Date: MM/DD/YYYY Date: MM/DD/YYYY

File details come from the government source that posted it.