About this file

PWS

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-15-00586 PWS 1

Performance-Based Work Statement (PWS)

Purchase Request: FD2060-15-00586

Depot repair of the Directional Control, Transponder Control, and the Receiver Control applicable to the TH-1H Helicopter

Date: 21 Jan 16

1.0 Description of Services

1.1 Objective(s): This PWS is for depot level repair of the Directional Control, Transponder Control, and the Receiver Control which are all applicable to the TH-1H helicopter. The extent of repair work required shall be determined by the initial inspection/bench check and required disassembly to return this item to a serviceable end-item that shall efficiently serve its intended purpose. Original design of the end-item and parts thereof, or the design functional capabilities of the end-item, shall not be changed, modified or altered unless such changes are authorized in writing by the Procuring Contracting Officer (PCO) or specified by publication or applicable directive. The Contractor shall repair and return assets to the Government in serviceable condition while meeting the delivery schedule for all requirements. All CAV-AF transactions shall be promptly maintained.

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by having available assets to fully support the Special Operation Forces (SOF)/Personnel Recovery mission. The warfighter will benefit by having more aircraft available with a fully functional GPS Reciver to perform this combat search and rescue mission.

1.3 Background: The TH-1H is a refurbished Bell UH-1H helicopter with an installed Huey II kit, which encompasses a more powerful engine, new dynamic components, a new nose and tail boom. The cockpit and mission equipment upgrades include a change from analog to digital cockpit, the addition of crashworthy seats, and total re-wiring. The upgraded avionics components are almost exclusively commercial off-the-shelf (COTS) items. These modifications transformed these helicopters from a legacy aircraft into a state-of-the-art training platform compatible with future operational aircraft. This aircraft is an undergraduate training platform, which develops multiple pilot skills and transitions those skills faster across multiple aircraft. The TH-1H's advanced electronics provide expanded training opportunities and improved operational capabilities by upgrading the engine, transmission, and rotor system. It has multi-function displays allowing for future upgrades and provides new aircrews with a seamless transition from the TH-1H to follow-on rotary wing aircraft such as the CV-22 and the Combat Search and Rescue-X helicopters.

2.0 Services Summary:

PR: FD2060-15-00586 PWS 2

Performance Objective PWS Reference

Performance Threshold

Meet delivery schedule for all requirements.

4.0 There shall be no more than one late delivery per

quarter. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date specified in the contract.

Repair and return assets to the Government in serviceable condition.

4.2.8 There shall be no more than two Product Quality Deficiency Reporting (PQDR) annually during the period of performance of contract.

CAV-AF Reporting 4.6 All CAVAF transactions shall be accomplished daily or as transactions occur basis. The following metrics will be monitored:

- GFM In-Transit

- Repairable GFM Accountability

- Assets Not on Contract

3.0 Government Property and Services:

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements. The FAR and applicable supplements can be accessed at http://farsite.hill.af.mil.

3.2 Government Property to be provided: No Government property such as material, equipment, and information used to perform repairs will be provided IAW this PWS; however, the reparable assets being provided to the Contractor are now being identified as Government Furnished Property (GFP) and will be referenced as such. Regarding these assets, the Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements including, but not limited to, FAR Part 45, Government Property; FAR 52.245-1, Government Property; and Defense Federal Acquisition Regulation Supplement (DFARS) Part 245, Government Property. The FAR and applicable supplements can be accessed at the following site: http://farsite.hill.af.mil. For all other intents and purposes, the Contractor shall furnish all material, parts, and information necessary for the performance of these services.

3.3 Loss of Government Property

3.3.1 Definition of Loss of Government Property: In accordance with DFARS 252.245-7002, Reporting Loss of Government Property, “loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, theft, loss due to lack of security, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable

PR: FD2060-15-00586 PWS 3

material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.3.2 Reporting Loss of Government Property: The Contractor shall use the Defense Contract Management Agency (DCMA) eTools software application to report loss of Government property at the site below. The reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract/order.

http://www.dcma.mil/aboutetools.cfm

3.4 Government System(s): The Government will provide Contractor personnel access to system(s) only as necessary to perform tasks under the contract/order. Upon completion/ termination of the contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.

4.0 Technical Requirements: The Contractor is required to perform depot level repair of the Directional Control, NSN 5825-01-566-7710HL, P/N 205-USH-VOR-37, Transponder Control, NSN 5895-01-566-6242HL, P/N 071-01507-4902, and Receiver Control, NSN 5895-01-566- 7709HL, P/N 071-01576-0101. There shall be no more than one late delivery per quarter. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date specified in the contract. In the event there is a need for long-lead time parts, the Contractor shall notify the Government PCO within ten calendar days.

4.1 Period and Place of Performance:

4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will consist of the initial 12-month period (i.e. the “Basic” Order), followed by 4 annual Ordering Periods (totaling a 5-year PoP for the entire contract).

4.1.2 Place of Performance: These services shall be performed at the Contractor’s facility.

4.2 Maintenance Records

4.2.1 Condemnation and Repair: The Contractor shall be required to repair all end-items unless the Procuring Contracting Officer (PCO) via the Administrative Contracting Officer (ACO) provides written direction indicating otherwise. Requests for condemnation shall be submitted in writing through the ACO to the PCO within ten calendar days following the initial inspection/functional testing. Condemnations shall not be requested due to unavailability of replacement parts. Condemnations may only be granted if the item inducted for repair manifests one or more of the following conditions:

a. Physical damage has affected greater than 75 percent of the material within the end-item (i.e. crushed)

b. Burn damage has affected greater than 80 percent of the internal electrical components and connections of the end-item.

c. Repair cost is greater than 75 percent of the cost to purchase a new end-item.

d. Beyond Economical Repair (BER): Requests for condemnations shall be submitted in writing to the Government PCO within five workdays of the intent to condemn.

PR: FD2060-15-00586 PWS 4

Condemnation authority shall be requested when the cost to repair the asset exceeds 75 percent of the unit’s replacement cost. The Contractor shall not charge the full repair cost, but instead will only charge the negotiated firm-fixed-price associated with the BER Contract Line Item Number (CLIN). The PCO retains the right to request enlarged color photographs of any proposed condemned end-item. The photographs shall clearly portray the extent of damage to the end-item and/or effects of overheating. One photograph shall be of the entire end-item showing the part number and serial number. The results of any electrical testing performed on the end-item shall also be submitted for review. The Contractor may be required to submit the proposed condemned end-item to the Government’s technical representative for evaluation, confirmation, and/or disposition instructions.

4.2.2. Teardown, Test, and Evaluation (TT&E). TT&E is performed by the contractor to determine the cause of failure prior to conducting actual Repair of the item. When situations occur where an asset is provided to the Contractor for repair, but the Contractor cannot duplicate the failure, they shall notify the PCO within five work-days declaring “No Fault Found” for that specific part number. The Contractor shall not charge the full repair cost, but only the NFF or TT&E actions according to the negotiated CLIN.

4.2.3 The Government is authorized to replace condemned end-items with replacement reparable end-items of the same NSN at no additional cost. The Contractor is authorized reclamation from condemned units. The Contractor shall request authorization from the PCO prior to reclaiming any items from the condemned unit. The Contractor shall report the use of reclaimed items to the PCO.

4.2.4 Accessory and Component Reuse, Repair, and Replacement: Items received which are misidentified, misdirected, or have Air Force recoverable subassemblies missing shall be reported through the ACO to the PCO, to 411 SCMS/GULD for disposition instructions.

Missing repairable Expendability, Reparability, Recoverability Code (ERRC) “T” subassemblies (or ERRC Code T) subassemblies that are generated as part of the Next Higher Assembly (NHA) and subsequently require condemnation, will be replaced by the government. The replacement item may be repairable or serviceable. The repair (if required) and the installation of the replacement item into the NHA will be accomplished at no additional cost IAW T.O. 00-25-234.

4.2.5 Upon approval by the Government, the Contractor is authorized to cannibalize repair Shop Replaceable Units (SRU) necessary to accomplish timely repair to meet production schedule and/or accomplish repair of Mission Capable (MICAP) requirements. All cannibalized components will be returned to a pre-cannibalized condition. The Contractor shall maintain a record of part numbers cannibalized including the serial number of the units from which the part was removed and installed.

4.2.6 Facility Requirements: The Contractor shall provide a repair facility. The facility shall serve as the depot to carry-out the repair and will include Contractor-owned test equipment, fixtures, adapters and workbenches needed for repair of the assets.

PR: FD2060-15-00586 PWS 5

4.2.7 Repairable components will be repaired to Original Equipment Manufacturer (OEM) specifications.

4.2.8 Quality: The Contractor’s quality program shall be established and maintained IAW FAR 52.246-11 or equivalent. The Contractor’s quality program shall meet the requirements of ISO 9001:2008 or equivalent. When requested, the contractor shall assist the cognizant Contract Administration Office in evaluating Product Quality Deficiency Reports (PQDR) and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the contractor’s Quality Program. The contractor shall establish and maintain a program to accomplish the requirements set forth in Air Force T.O. 00-35D-54. There shall be no more than two (PQDR) annually during the performance of this contract repair effort.

4.2.9 The Contractor shall complete DD Form 1574 Serviceable Tags IAW MIL-STD-129.

They shall ensure the DD Form 1574 Serviceable Tag is attached to the asset.

4.2.10 Maintenance Records, Forms, and Publications

4.2.10.1 AFTO Form 349 Maintenance Data Collection Record is required and shall be IAW

T.O. 00-20-2-WA-1. (CDRL A001, DI-MISC-81371/T)

4.2.10.2 Depot Maintenance Production Report shall require the contractor to submit monthly production status reports for the duration of each delivery order. The contractor shall ensure the delivery schedule is met for all requirements. After receipt of order and assets, Contractor shall repair and ship assets to the Government within 30 days (CDRL A002, DI-

ALSS-80728A/T)

4.3 Item Unique Identification (IUID)

4.3.1 IUID Requirements: Item Identification and Valuation, unique item identification is a method of marking items with unique item identifiers which have machine-readable data elements. Unique item identification is required for all items to be delivered to the DoD that meet the criteria established in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.

4.3.2 IUID Marking Plan: The Contractor shall mark items and Military Standard (MIL- STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property. The plan must be approved by the Government Engineering organization prior to implementation. (CDRL A003, Item Unique Identification (IUID) Marking Plan, DI-

MGMT-81803)

4.3.3 IUID Registry: In accordance with the Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government user will add item(s) to the Department of Defense (DoD) IUID Registry. The Government user or Contractor representative responsible for causing “life cycle events” (i.e., PR: FD2060-15-00586 PWS 6 abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record(s) in the DoD IUID Registry.

4.3.4 IUID Marking Activity and Verification Report: The Contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A004, Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

DI-MGMT-81804)

4.4 Packaging

4.4.1 The Contractor shall package and mark end-items and components in accordance with the contract (basic or order, as applicable) Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129P, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL-STD-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1D, Standard Practice for Military Packaging. The Contractor shall ensure that classified material is packaged, marked, and shipped in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.

4.4.2 The Contractor shall package and mark material for movement, shipment, receipt, and storage in a manner that ensures the protection and preservation of the material for shipment and storage at the destination. The Contractor shall package electronic parts susceptible to static discharge damage in accordance with MIL-STD-1686C, Military Standard: Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).

4.4.3 In accordance with MIL-STD-2073-1D, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed and replaced with new containers that meet the requirements of the AFMC Form 158.

4.5 Counterfeit Prevention Plan (CPP): The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronics parts being installed in end-items or otherwise entering the USAF/DoD inventory.

The system shall incorporate processes/procedures to address the requirements listed in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The Government's review of the Contractor’s system will be accomplished as part of the evaluation of the Contractor’s purchasing system in accordance with the FAR and applicable supplements and shall be in

PR: FD2060-15-00586 PWS 7

compliance with all applicable guidance and clauses listed in the contract. (CDRL A005, DI- MISC-81832, Counterfeit Prevention Plan)

4.6 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. If CAV-AF training is required, Contractor personnel may send an email to: 406scms.cav.af.ar@robins.af.mil. (CDRL A006, DI-MGMT- 81634B, Commercial Asset Visibility Air Force (CAVAF)/Government Furnished Material Report)

4.7 Government-Industry Data Exchange Program (GIDEP). The Contractor shall participate in GIDEP in accordance with Air Force Joint Instruction (AFJI) 63-108, Government- Industry Data Exchange Program (GIDEP), and GIDEP Operations Manual S0300-BT-PRO- 010, Government-Industry Data Exchange Program.

4.7.1. Government Industry Exchange Program (GIDEP): The Contractor shall develop, implement, and participate in GIDEP. The Contractor shall be required to submit all appropriate data to GIDEP as it is generated IAW the Contract Data Requirements List (CDRL) of this contract. Part, component, material, equipment, and manufacturing process deficiencies (actual or potential) shall be reported to GIDEP. The Contractor shall maintain a record of the status and disposition of all Alert/Safe Alert Reports. (CDRL A007, DI-QCIC-80125B/T)

4.7.2 The Contractor(s) shall screen each Alert or Safe Alert received from GIDEP to determine if the device or process for which the Alert is issued, is used in the manufacture of the unit and take appropriate action. Upon determination that an Alert/Safe Alert has implications to the units being manufactured, a response shall be submitted informing and specified organizations IAW CDRL. Subcontractors to the prime shall be notified of reports associated with the device, components, or processes supplied by the subcontractor to the prime. (CDRL A008, DI-QCIC- 80126B/T)

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and services will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Actual knowledge and/or generation of classified information and/or Controlled Unclassified Information (CUI) are not expected to be necessary for performance of the contract/order. Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations. If a change in the security classification of the contract/order becomes necessary after contract/order award, the Contractor shall make a reasonable effort to continue performance of tasks under the contract/order in compliance with the change in security classification in Security Requirements.

PR: FD2060-15-00586 PWS 8

5.2.2 Government Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and international security requirements are met. The Contractor shall comply with Government security regulations including, but not limited to, Department of Defense (DoD) 5200.2-R, Personnel Security Program; DoD 5220.22-M; DoD Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual.

5.2.3 Security Clearance: Contractor clearances are not required under this contract.

Contractor personnel shall not be authorized access to classified information and/or CUI and classified items or be permitted to work on classified projects and/or programs without a valid security clearance and a need-to-know. If security clearances become necessary after contract/order award, the Contractor shall ensure applicable Contractor personnel obtain valid security clearances appropriate to the access required for proper accomplishment of contract/order requirements.

5.2.4 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall ensure compliance with DoDD 5205.02E and DoD Manual 5205.02-M to protect United States (U.S.) Government interests.

5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified information and/or CUI.

5.2.6 Security of Contractor System(s): The Contractor shall ensure the security of Automated Information System(s) (AIS) at the Contractor’s facility to preclude potential security incidents or violations including potential unauthorized disclosure or compromise of classified information and/or CUI.

5.2.7 Access to Government System(s): The Government will provide Contractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure Contractor personnel who require access to an unclassified or classified Government AIS have the appropriate background check or security investigation conducted. The Government will provide system access subject to approval of the DD Form 2875, System Authorization Access Request (SAAR). Upon completion/termination of the contract/order or transfer/termination of Contractor personnel, the system account(s) will be closed.

5.3 Environmental Management System (EMS): Services will be performed at the Contractor’s facility; therefore, the local EMS requirements do not apply to this effort. This statement does not exempt the Contractor from any other Federal, State, or local statute or requirement.

5.4 Green Procurement Program (GPP): Under Secretary of Defense (USD) Memorandum, Establishment of the DoD Green Procurement Program, dated August 27 2004, establishes the requirement for a GPP. Green procurement is the purchase of environmentally preferable products and services and shall be managed in accordance with the FAR and applicable

PR: FD2060-15-00586 PWS 9

supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The prime Contractor shall ensure subcontractors comply with the GPP requirement.

5.5 Safety Requirements

5.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoDD 4715.1E, Environmental, Safety, and Occupational Health (ESOH). OSHA and ESOH requirements shall be incorporated into the Contractor’s safety program.

5.5.2 Mishap Notification/Investigation

In accordance with AFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF interests. The Contractor shall ensure the USAF is notified of mishaps. The Contractor shall contact the Contracting Officer’s Representative (COR), if available, or another MFT member by telephone within eight business hours and the Contractor shall cooperate with USAF safety investigations.

5.6 Safety and Health

5.6.1 While performing work under this contract, the Contractor shall comply with all applicable federal, state, and local regulations regarding occupational safety and health. In accordance with AFI 91-204, Safety Investigations and Reports, paragraph 2.4.6.1.1, the Contractor shall report mishaps involving damage or injury to the USAF. The Contractor shall notify the Government Representative (GR) within eight hours of any damage to Government property where the dollar value exceeds $500,000.00, and within two business days for any damage to Government property less than $500,000.00 during the execution of the contract.

5.6.2 Mishap notifications shall contain, at a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, time and exact location of accident/incident

c. Brief narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

5.6.3 If requested by the designated GR, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

5.7 Inspection of Services: Inspection of Services will be accomplished in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The Government reserves the right to inspect Contractor

PR: FD2060-15-00586 PWS 10

performance.

5.8 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

5.9 Contract Manpower Reporting

5.9.1 In accordance with the Secretary of the Air Force for Acquisition (SAF/AQ) Memorandum, Implementation of FY11 National Defense Authorization Act (NDAA) Section 8108 of Public Law 112-10 of the Department of Defense and Full-Year Continuing Appropriations Act, 2011, Contractor Inventory, dated Nov 13 2012, the Contractor shall provide an annual count of Contractor/subcontractor personnel performing work if the DoD is the requiring activity, if the acquisition is using U.S. Government appropriated funds, and if the acquisition is equal to or greater than the Simplified Acquisition Threshold (SAT).

5.9.2 In accordance with the Office of the Secretary of Defense (OSD) Memorandum, Enterprise-wide Contractor Manpower Reporting Application, dated Nov 28 2012, the Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract at the Enterprise-wide Contractor Manpower Reporting Application (eCMRA) site below. Reporting shall be conducted for each fiscal year (FY), which extends October 1 through September 30. While inputs may be made any time during the FY, all data shall be reported no later than October 31 of the following FY.

The Contractor may direct questions to the help desk at the eCMRA site. http://www.ecmra.mil

5.10 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area Workflow e-Business Suite / Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) in accordance with all applicable clauses located in the basic contract. Services will be accepted by a DCMA representative.

PR: FD2060-15-00586 PWS 11

6.0 Appendix: References

Publication Title of Publication Date of Publication Section(s) that Apply

AFI 91-204 Safety Investigations and Reports

9 August 2012 reissued 8 April 2013 http://www.e-publishing.af.mil/

Paragraphs 1.3.1.1, 2.4.6.1.1- 2.4.6.1.2

00-25-234

With change 38

General Shop Practice Requirement for the Repair Maintenance and Test of Electrical Equipment

Aug 1998, Sep 2009 Entire

DoD 5200.2-R Personnel Security Program

1/1/87 Change 1 - 2/12/1990 Change 2 - 7/14/1993 Change 3 - 2/23/1996 http://www.dtic.mil/whs/directives /corres/pub1.html

Entire

DoDD 4715.1E Environmental, Safety, and Occupational Health

(ESOH)

March 19, 2005 http://www.dtic.mil/whs/directives /corres/pub1.html

Entire

DoDD 5205.02E

DoD Operations Security (OPSEC) Program

June 20, 2012 http://www.dtic.mil/whs/directives /corres/pub1.html

Entire

DoD Manual 5205.02-M

DoD Operations Security (OPSEC) Program Manual

November 3, 2008 http://www.dtic.mil/whs/directives /corres/pub1.html

Entire

DoD 5220.22- M

National Industrial Security Program Operating Manual

(NISPOM)

February 28, 2006 Entire

FAR and supplements

Federal Acquisition Regulation http://farsite.hill.af.mil Sections applicable to contract and

PWS

OSD

Memorandum

Enterprise-wide Contractor Manpower Reporting Application

Nov 28 2012 http://www.acq.osd.mil/dpap/polic y/policyvault/Enterprise-wide_Contractor_Manpower_Rep orting_Application_memorandum.

pdf

Entire

PR: FD2060-15-00586 PWS 12

SAF/AQ

Memorandum

Implementation of FY11 NDAA Section 8108, Contractor Inventory

Nov 13 2012 https://cs.eis.af.mil/airforcecontrac ting/knowledge_center/Documents /AFFARS_Library/5337/2012-11- 13_saf-aq-memo.pdf

Entire

00-35D-54 USAF Deficiency Reporting, Investigation, and Resolution

Nov 2011 Entire

AFJI 63-108 Government-Industry Data Exchange Program

(GIDEP)

15 May 1980 http://www.e-publishing.af.mil/

Entire none Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, Version 2.5

September 15, 2012 www.acq.osd.mil/dpap/UID/attach ments/DoDUIDGuideVer2_5.pdf

Entire

GIDEP

Operations Manual S0300-

BT-PRO-010

Government-Industry Data Exchange Program

September 2009 http://www.gidep.org/

Chapter 2, Participation Requirements

MIL-STD-

129P

Department of Defense / Standard Practice / Military Marking for Shipment and Storage

15 December 2002 Change 1 - 15 January 2004, Change 2 - 10 February 2004, Change 3 - 29 October 2004, Change 4 - 19 September 2007 http://www.acq.osd.mil/log/sci/ait/ MIL-STD-129PCH4.pdf

Entire

MIL-STD-

130N

Department of Defense / Standard Practice / Identification Marking of U.S. Military Property

17 December 2007 Change 1 – 16 November 2012 http://www.acq.osd.mil/dpap/pdi/u id/docs/MIL-Std130N_Ch1.pdf

Entire

MIL-STD-

2073-1D

Department of Defense / Standard Practice for Military Packaging

15 December 1999, Notice 1, 10 May 2002

Entire

MIL-STD-

1686C

Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical

25 Oct 1995 Entire

PR: FD2060-15-00586 PWS 13

and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)

T.O. 00-20-2-

WA-1

Maintenance Data Documentation

Sep 2010 Entire

File details come from the government source that posted it. Updated .