FA852311R30649______0001.pdf
PDF 302 KB Posted
- Attached to
- Embedded Global Positioning System/Inertial Navigation System (EGI) Federal contract opportunity
- Solicitation number
- FA8523-11-R-30649
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Redacted_J&A_Eagle-M_and_RSAM.pdf | ||
| Redacted__J&A__Extension.pdf | ||
| Redacted_J A.pdf | ||
| FA852311R30649______0004.pdf | ||
| Attachment 3 - DD 254 updated.pdf | ||
| Exhibit B thru F Price Schedule HI.xls | XLS spreadsheet | |
| Attachment 12 - Industrial Safety and Health Requirements.pdf | ||
| Exhibit B thru F Price Schedule HI.xls | XLS spreadsheet | |
| PBWS for EGI Contract | — | |
| FA852311R30649______0002.pdf | ||
| Attachment 6 - CAVAF SOW.pdf | ||
| FA852311R30649______0003.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8523-11-R-30649-0001
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
FD2060-11-30649
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
WR ALC GRWKA, EW/AVIONICS
460 RICHARD RAY BLVD BLDG 301 STE 2
BLDG 301 CP 478 926 7212
ROBINS AFB GA 31098-1813
BUYER: Rodney C. Lewis, Capt. USAF/GRWKA Rodney.Lewis@robins.af.mil Phone: (478) 926- 7465 Fax: (000) 000-0000 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8523
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA852311R30649
9B. DATED (SEE ITEM 11)
31-AUG-2011
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FMS REQUIREMENT
ROUTINE
The Purpose of this amendment is listed on Page 2.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8523-11-R-30649-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to delete the Service Contract Act and associated clauses, replace Exhibits B-F, replace the CAVAF SOW, and incorporate a new attachment for Industrial Safety and Health Requirements.
A. The following clauses have been deleted in their entirety:
1. 52.222-41 Service Contract Act of 1965 (Nov 2007)
2. 52.222-42 Statement of Equivalent Rates for Federal Hires (May 1989)
3. 52.222-44 Fair Labor Standards Act and Service Contract Act--Price Adjustment (Sept
2009)
B. Attachment 6 - Commercial Asset Visibility Air Force (CAVAF) SOW has been replaced in its entirety with the version listed in Section J below.
C. Attachment 12 - Industrial Safety and Health Requirements has been incorporated.
D. Exhibits B-F have been replaced in their entirety.
E. All other terms and conditions remain unchanged.
Request for Proposal FA8523-11-R-30649-0001
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages
ATTACHMENT 6 CAVAF SOW
Commercial Asset Visibility Air Force (CAVAF)
31AUG2011 9
EXHIBIT B-F Price Schedule UNDATED
ATTACHMENT 12 Appendix C Industrial Safety and Health Requirements
20JAN2011 25
EGI Prices
Period 1 Period 2 Period 3 Period 4 Period 5 Period 6
EXHIBIT B Award Date - 31 Dec 12 1 Jan 13 - 31 Dec 13 1 Jan 14 - 31 Dec 14 1 Jan 15 - 31 Dec 15 1 Jan 16 - 31 Dec 16 1 Jan 17 - 1,825 Days after award
CLINs 0001-0004
Installs/Spares/Replenishment Spares/Integration RANGES RANGES RANGES RANGES RANGES RANGES
ELIN NSN User's Part # Platform Description HG Part Number 1-5 6-15 16-30 31-50 50+ 1-5 6-15 16-30 31-50 50+ 1-5 6-15 16-30 31-50 50+ 1-5 6-15 16-30 31-50 50+ 1-5 6-15 16-30 31-50 50+ 1-5 6-15 16-30 31-50 50+
B001 6605-01-513-5946 34209950-R004-960 AH64D 9.8 EGI+ with SAASM receiver (Includes FDE/RAIM & POBS) HG9873P02-001
B002 6605-01-415-9079 34200600-3057 AH-1 W 9.8 EGI with PPS Receiver HG9874D1
B003 6605-01-415-9079 34200600-3057 AH-1 W 9.8 EGI with GFE GEM IV Receiver Undefined
B004 6605-01-520-2012 34200602-3057 H-1 9.8 EGI with PPS Receiver and RAD ALT HG9910D01
B005 6605-01-520-2012 34200602-3057 H-1 9.8 EGI with GFE GEM IV Receiver Undefined
B006 6605-01-421-0076 34200650-300J AH-64A, AH-64D Block I & II, OH-58D 9.8 EGI with PPS Receiver HG9922EA01
B007 N/A 34209200-RJAD-001 P3I SOA 9.8 EGI+429+JAIC with SAASM Receiver (Includes FDE/RAIM & POBS & EMI) HG9869J1-001
B008 N/A 34209200-RJAD-001 VH-60 (Presidential) 9.8 EGI+429+JAIC with SAASM Receiver (Includes FDE/RAIM & POBS & EMI) HG9869L1-001
B009 N/A 34209200-RJAD-001 MH-65 (Coast Guard) 9.8 EGI+429+JAIC with SAASM Receiver (Includes FDE/RAIM & POBS & EMI) HG9869N1-001
B010 N/A 34209200-RJAD-001 MH-60T (Coast Guard) 9.8 EGI+429+JAIC with SAASM Receiver (Includes FDE/RAIM & POBS & EMI) HG9869K1-001
B011 N/A 34209850-WC40-001 TSPI 9.8 EGI with SAASM Reciever (Includes FDE/RAIM ) HG9969C01-001
B012 6605-01-562-5491 34209950-RN12-001 Navy C-2A, E2-C, H-53E, CH-46E, AN/SPN-46, MH53, SPN-46 9.8 EGI with SAASM Receiver (Includes FDE/RAIM & CAIC) HG9873G02−001
B013 6605-01-513-8888 34209950-RN14-960 UH60, CH47 9.8 EGI+ 429 with SAASM Receiver (Includes FDE/RAIM & POBS) HG9873N02-110
B014 6605-01-532-6515 34249950-R004-960 Apache Block III 9.8 EGI+ w/SAASM receiver includes FDE/RAIM & POBS HG9927C02−001
B015 6605-01-532-6526 34249950-RN14-960 TBD EGI+ 429 w/ MMR andSAASM Receiver (Includes FDE/RAIM & POBS) HG9927B02-001
B016 N/A 34259950-WDE4-001 NUCAS NUCAS HG9989A01-001
B017 N/A 34259950-WDE5-001 NUCAS NUCAS HG9989A02-001
B018 Transportation Cost (per item) if no Transportation Allocation Code (TAC) is provided
Note 1: -960 denotes government use and -001 is US.
Note 2: Configurations not currently released will require a one time NRE for that configuration
EXHIBIT C
CLINs 0013-0016
Foreign Miitary Sales Installs/Spares/Replenishment Spares/Integration
C001 N/A 34200750-M041-XXX F-15 11.0 EGI with SAASM receiver (Includes FDE/RAIM & POBS)
C002 N/A 34200750-M042-XXX F-15SR Saudi Arabia 11.0 EGI with SAASM receiver (Includes FDE/RAIM & POBS) HG9914-XXX
C003 N/A 34209200-RJAD-XXX P3I SOA 9.8 EGI+429+JAIC with SAASM Receiver (Includes FDE/RAIM & POBS & EMI) HG9869J1-XXX
C004 N/A 34209200-RJAD-XXX MH-65 9.8 EGI+429+JAIC with SAASM Receiver (Includes FDE/RAIM & POBS & EMI) HG9869N1-XXX
C005 N/A 34209200-RJAD-XXX MH-60T 9.8 EGI+429+JAIC with SAASM Receiver (Includes FDE/RAIM & POBS & EMI) HG9869K1-XXX
C006 N/A 34209200-W0S5-XXX C-130J 9.8 EGI with SAASM Receiver (Includes FDE/RAIM & POBS) HG9869T2-XXX
C007 N/A 34209950-R004-XXX AH64D 9.8 EGI+ with SAASM receiver (Includes FDE/RAIM & POBS) HG9873P02-XXX
C008 N/A 34209950-RN12-XXX Navy C-2A, E2-C, H-53E, CH-46E, AN/SPN-46, MH53, SPN-46 9.8 EGI with SAASM Receiver (Includes FDE/RAIM & CAIC) HG9873G02−XXX
C009 N/A 34209950-RN14-XXX UH60, CH47 9.8 EGI+429 with SAASM Receiver (Includes FDE/RAIM & POBS) HG9873N02-XXX
C010 N/A 34249950-R004-XXX Apache Block III 9.8 EGI+ w/ MMR and SAASM receiver (includes FDE/RAIM & POBS) HG9927C02−XXX
C011 N/A 34249950-RN14-XXX TBD 9.8 EGI+429 w/ MMR and SAASM Receiver (Includes FDE/RAIM & POBS) HG9927B02-XXX
C012 N/A 34209400-WB14-XXX RAAF F/A-18E/F ANAV TBD TBD
C013 Transportation Cost (per item) if no Transportation Allocation Code (TAC) is provided
FMS Note 1: -XXX denotes country code
FMS Note 2: Configurations not currently released will require a one time NRE for that configuration
EXHIBIT D
CLIN 0008 & 0020
CONTRACTOR DEPOT REPAIRS (CDR)
E001 N/A N/A N/A Contractor Depot Repairs (all models) N/A
E002 N/A FMS - Contractor Depot Repair (all models) N/A
E003 Transportation Cost (per item) if no Transportation Allocation Code (TAC) is provided
EXHIBIT E
CLIN 0011 & 0023
Hardware Modifcations/Retrofits
F001 N/A N/A N/A CORE EGI N/A
F002 N/A N/A N/A Retrofit Kit for HSCA to previously delivered AH-1W units N/A
F003 N/A N/A N/A Retrofit Kit for MMR to previously delivered units N/A
F004 N/A N/A N/A Retrofit Kit for TSPIU to previously delivered TSPI units N/A
F005 N/A N/A N/A Retrofit Kit for F-15 SAASM to previously delivered F-15 Units (Includes FDE/RAIM & POBS) N/A
F006 N/A N/A N/A Retrofit Kit Army P3I EGI+429 (SAASM) to previously delivered Core 9.8" units (FDE/RAIM, POBS, and EMI) N/A
F007 N/A N/A N/A Retrofit Kit Army SOA P3I EGI (SAASM) to previously delivered Core 9.8" or SOF 12.75" Units (FDE/RAIM, POBS, and EMI) N/A
F008 N/A N/A N/A Retrofit Kit Army SOA P3I EGI (SAASM) to previously delivered SOF 9.8" units (FDE/RAIM, POBS, and EMI) N/A
F009 N/A N/A N/A Retrofit Kit for the S-3 to C-2 (FDE/RAIM) N/A
F010 N/A N/A N/A Retrofit Kit for C-2 to previously delivered F-14 (FDE/RAIM) N/A
F011 N/A N/A N/A Retrofit Kit for Army SOA P3I +SAASM to previously delivered AH-64 (Includes FDE/RAIM, POBS and EMI) N/A
F012 N/A N/A N/A Retrofit Kit for Army P3I (SAASM) to previously delivered P3I EGIO+429(SAASM) (Includes JAIC) N/A
F013 N/A N/A N/A Retrofit Kit for A-10 to previously delivered A-10PE Legacy obsolescence units N/A
F014 N/A N/A N/A Recurring Delta Hardware (ARINC 429) N/A
F015 N/A N/A N/A POBS License N/A
F016 N/A N/A N/A FDE/RAIM License N/A
F017 N/A N/A N/A Recurring Delta Hardware for CAIC/JAIC N/A
F018 N/A N/A N/A Recurring Delta Hardware for SAASM-Based GPS Receiver N/A
F019 N/A N/A N/A Recurring Delta Hardware for Multi-Mode Receiver (MMR) N/A
F020 N/A N/A N/A Recurring Delta Hardware for H-1 HSCA N/A
F021 N/A N/A N/A In-House Software Upgrade for Production Units N/A
F022 Transportation Cost (per item) if no Transportation Allocation Code (TAC) is provided
Note 1: Retrofit/Upgrade Kit configurations not currently released will require a one time NRE for a new kit configuration
EXHIBIT F
CLINs 0001-0004 & 0013-0016
Mounts/Racks
G001 N/A 34077590-001 multiple 12.75" Mount N/A
G002 N/A 34200575-001 multiple 9.8" Mount N/A
G003 N/A 34200575-003 C-130 J C-130J Mount N/A
G004 Transportation Cost (per item) if no Transportation Allocation Code (TAC) is provided
&CExhibits B thru F
PRICING TABLE
FILE NUMBER: FD2060-11-30649
PREPARED BY: djn/78 ABW/SEG
APPENDIX C
INDUSTRIAL SAFETY AND HEALTH REQUIREMENTS
For
PERFORMANCE-BASED WORK STATEMENT (PWS)
TYPE WORK: Integration, Modernization, Fabrication, Test, Qualification, Repair and Support
NOMENCLATURE: Embedded Global Positioning System Inertial Navigation System (EGI)
PR#: FD2060-11-30649
Date: 20 Jan 11
PREPARED BY: djn/78 ABW/SEG 2
THIS PAGE INTENTIONALLY LEFT BLANK
PREPARED BY: djn/78 ABW/SEG 3
PART I
INSTRUCTIONS
The contractor Safety and Health Plan shall address in detail the items listed in Part II through Part III, as applicable. Repeating the referenced standard without addressing the company’s specific processes or procedures will not suffice. If task specific procedures are incorporated into a company local document, those procedures must be attached to the submitted Safety and Health Plan. Referencing the company's local procedure/document in the Safety and Health Plan is not adequate. If the company's local procedure/document is not attached, the submitted Safety and Health Plan will be returned UNACCEPTABLE.
PART II
1. ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH (ESOH): The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees.
Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
2. VOLUNTARY PROTECTION PROGRAMS (VPP): The Air Force is part of the OSHA VPP. All contractors are required to familiarize themselves with the requirements of VPP.
Information on VPP can be accessed at http://www.osha.gov. The intent of the Air Force Safety Program is to prevent injuries and to communicate our safety expectations with potential offerors as well as those contractors awarded a government contract. The Air Force’s interest is to protect personnel working in or around contractor operations, and to protect Air Force equipment/property.
3. CONTRACTOR EMPLOYEES: Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: Air Force Occupational Safety and Health Standards (AFOSH STD) are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must
PREPARED BY: djn/78 ABW/SEG 4 also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
4. INSPECTIONS: Air Force Environmental, Safety, Occupational Health and Fire protection officials or responsible Quality Assurance Evaluator (QAE) may periodically enter a contractor’s workplace to verify working conditions of Air Force personnel. If an Air Force employee observes improper procedures or unsafe conditions exits which place Air Force personnel or equipment/facilities in jeopardy, the contractor will remove personnel and/or equipment from the unsafe condition and immediately notify the Contracting Officer and the Installation Safety Office. Department of Labor OSHA inspectors are authorized right of entry to inspect any place of employment operated by an Air Force contractor. They are for the most part, “No Notice” inspections.
Note: Notify the Installation Safety Office at (478)-926-6271 if an OSHA inspector visits your site unescorted by an Air Force Safety Technician. Noncompliance with safety requirements can result in work stoppage, inexcusable delays, and/or costly fines issued by the DoL. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. Fines and additional costs for violations levied against the contractor as a result of OSHA findings, and/or installation safety, fire, health or environmental are the sole responsibility of the contractor and shall not be passed through to the Government.
5. MISHAP NOTIFICATION: The contractor shall notify the Installation Safety Office telephonically at (478)-926-6271 during duty hours and (478)-327-2612 after hours, within four
(4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Installation Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
i. Other pertinent information
Note: If requested by Government Personnel (PCO/ACO), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the investigating safety office. If the government investigates the
PREPARED BY: djn/78 ABW/SEG 5 mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is finalized and closed out.
*A Class A mishap is: A fatality or property damage in excess of 2 million dollars.
*A Class B mishap is: An injury resulting in permanent or partial disability or property damage in excess of 500,000 dollars.
*A Class C mishap is: An injury or occupational illness resulting in lost workdays or property damage in excess of 50,000 dollars up to 499,999 dollars.
*A Class D mishap is: An injury or occupational illness resulting in restricted days, transfer days, or property damage resulting in 49,999 dollars or less.
* These numbers are subject to change.
6. IMPOUNDMENT PROCEDURES: The contractor shall establish written impoundment procedures, as part of their Safety and Health Plan. Impound data must be included in the Mishap Notification Procedures as applicable. As a minimum, the procedures must address:
a. Appointment of Impound Authority in writing (copy faxed to QAP and Safety Office)
b. Impound Authority e-mail address and phone numbers
c. Specific instructions (cordon, facility locked facility, etc.) to secure the site or government asset, to prevent tampering with the aircraft, site or government assets
d. Specific instructions or measures to ensure only authorized personnel directly involved in management, SAFING, troubleshooting, or repair of aircraft or equipment gain access to the impound site
e. Additional guidance is located within AFI 21-101, AFMC Supplement 1
7. CONTRACTOR SAFETY AND HEALTH PROGRAM: The contractor shall establish and maintain an acceptable safety and health program.
a. Contractor Safety and Health Manager. As part of the Contractor Safety and Health Program, the contractor shall assign in their plan, by name and phone number, a person who will be the primary point of contact for safety and health issues for the on-site o peration.
b. Contractor’s Safety and Health Plan. Contractor shall prepare a safety and health plan in accordance with PART I, PART II, and PART III; incorporating the listed elements above in PART II, and the flagged items below in PART III of this Appendix.
The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan. The plan must be accepted by the government and will be incorporated into the awarded contract. Should a master safety and health plan remain on file with the Installation Safety Office, the contractor must ensure that it is current, updated, and includes all elements below. An addendum to the plan must include the processes noted below:
(1) Changes to the Plan. If, during the performance of this contract, changes to the contractor’s Safety and Health Plan are required, the contractor shall submit a revised Safety and Health Plan to the following Contracting Monitor: WR-ALC/
PREPARED BY: djn/78 ABW/SEG 6
GRWB, DSN 468-7112; Comm (478) 926-7112. The same process of review and negotiation (if applicable) involved in the original submission applies to any revision submitted after contract award. The accepted revised Safety and Health Plan shall then be incorporated by contract modification as an attachment or by reference.
(2) Tracking Rates. The Contractor’s Safety and Health Plan shall identify how their Total Case Incident Rate (TCIR) & Days Away, Restricted and/or Transferred (DART) rates, or comparable insurance rates or compensation injury rates will be tracked, and the corrective measures to be used if these rates begin to decline. The contractor must also describe the processes and procedures to be used to track their compliance with their Safety and Health Plan and how they will correct any deviations from the plan, when and if identified.
PART III
The following checked items are required elements for performance of this contract. The contractor’s safety and health plan shall address in detail how compliance with these requirements will be ensured. The safety plan shall clearly define company procedures on specific tasks/processes, personnel qualifications, how facilities comply with fire requirements to include the electrical wiring and fire protection systems installed (i.e., fire suppression, fire detection, fire extinguishers, firewall ratings, etc) required equipment used to accomplish tasks and other necessary requirements to fulfill the checked items for the protection of government personnel and property. The contractor’s safety and health plan shall meet, but may exceed the referenced standards.
Note to Requirements Generators: The following checklist will be used by the requirements generator to determine what safety requirements apply to the contract. These items apply to all contractor and contract operations regardless of any contrary text made in the leading purpose statement of each cited reference. If any of the following items pertain to work being accomplished as described by the contract or apply to the contractors’ use to accomplish the work required in the technical documents; the item shall be marked and the contractor will develop their Safety Plan based on those requirements. These requirements must be accompanied by the technical documents when submitting to the reviewing safety office.
Remove this note prior to submission to the reviewing safety office.
Note regarding Motor Vehicles: Installation Commanders of all DoD installations in the United States and over which the United States has exclusive or concurrent legislative jurisdiction are delegated the authority to establish additional vehicular and pedestrian traffic rules and regulations for their installations. All persons on a military installation shall comply with locally established vehicular and pedestrian traffic rules and regulations. A person found guilty of violating, on a military installation, any State vehicular or pedestrian traffic law or local DoD 5525.4, paragraph 3 – 4: Pursuant to the authority established in Enclosure 1, installation vehicular or pedestrian traffic rule or regulation made applicable to the installation under the provisions of this directive is subject to a fine of not more than $50 or imprisonment for not more than 30 days, or both, for each violation (40 U.S.C., Section 318c (reference d).
PREPARED BY: djn/78 ABW/SEG 7
a. _X_Yes __ No, does not apply to this contract
Note: MANDATORY for on installation services.
a. PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians do not have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
b. _X_Yes __ No, does not apply to this contract
b. MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations, 2 Nov 1981, para 3-4; DoDI 6055.4, DoD Traffic Safety Program, 20 Jul 99; and AFI 91-207, AFMC Supp 1, The US Air Force Traffic Safety Program, 1 Oct 07. Each applies to all persons at any time on an Air Force installation and includes all leased, owned, or privatized property including housing areas. In addition, AFI 13-213, Airfield Management, 29 Jan 08, paras 1.3.6 and 4.4.2.1 and all applicable local guidance applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on an Air Force installation, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.
c. _X_Yes __ No, does not apply to this contract
c. FOREIGN OBJECT DAMAGE (FOD) Awareness, Prevention and Responsibilities:
Contractor shall comply with the standards in: AFI 21-101 AFMC Supp 1, Aircraft and Equipment Maintenance Management, 14 Dec 07, paragraphs 14.19 - 14.19.10.1.13; National Aerospace Standard (NAS) 412, Foreign Object Damage/Foreign Object Debris (FOD) Prevention Program, Oct 97; AFOSH STD 91-100, Flightline Vehicle Operations, 1 May 98, Chap 6; and all applicable local guidance. The FOD program must be integrated into the day-to-day operations to reduce/eliminate FOD incidents. Programs will include covering waste dumpsters, waste hauling trucks, barriers in place to stop migrating FOD from dirt and gravel piles, and end of shift or daily clean-up. The contractor will brief their personnel at least weekly on any FOD requirements. All contractors, subcontractors performing maintenance in a FOD– potential area will receive and have documented initial FOD Awareness and Prevention training.
For AFMC organizations, Course number MHPMAS00001300 may be used to satisfy this requirement. Subject training will be given during Flight Line Drivers Training by the host Base
PREPARED BY: djn/78 ABW/SEG 8
Operations Flight. All vehicle operators are responsible for performing a Foreign Object (FO) inspection on their vehicles including all towed equipment, vehicle tires and open cargo areas of vehicles prior to entering the marked runway, taxiway, flight line, and aircraft parking ramps and other areas as directed by the Installation FOD Awareness and Prevention Officer. All “open-air” delivery vehicles must be free of loose items/debris that could potentially fall from the vehicle and cause a FOD hazard. The cargo beds of pickups truck must be clean or covered prior to entering the airfield. Vehicles will be subject to inspection and denied entry if found unacceptable. Contractors and site/operations evaluators will ensure tools; equipment, rags, residue and hardware are properly stored and accounted for. “Clean as you go” methods are required.
d. __Yes _X_ No, does not apply to this contract
d. PROTECTIVE BARRIERS/WARNING SIGNS: Contractor shall comply with the standards in: 29 CFR 1926, Subpart G, Sections 200, 201 and 202 and EM 385-1-1, US Army Corps of Engineers Manual, Safety and Health Requirements, 3 Nov 03, Sections 4, 8 and 24.
Barricades must be provided by the contractor in an area for excavation, open manholes, overhead work, or the protection of personnel from hazardous operations, moving equipment or cranes. Barricades are required to cover holes in the ground properly (e.g.: rigid/protective – 200 pound load capacity for fall protection, Red & White rope for warning barricades. The contractor must barricade the area for overhead work to protect personnel from hazardous operations. For crane operations, the barricaded area must encompass one and one half times the longest extended length of the erected boom. Barricades must be erected before the work begins. If the barricades are in a roadway or walkway, blinking lights must be used after dark. When the work is complete, the barricades must be removed from the job site. Kerosene lamps and open flame pots shall not be used for or with warning signs or devices.
SIGNAGE: Mandatory for contractors working on an AF installation. A sign will be prominently posted on the contractor’s site at the entry/access point and shall contain the following information:
- Company Name, Contract Number, Site Superintendent & Phone Number, Site Safety Rep & Phone Number, QAP/ QAE Monitors & Phone Number.
e. _X_ Yes __ No, does not apply to this contract
e. WALKING – WORKING SURFACES: Contractor shall comply with the standards in: 29 CFR 1910, Subpart D and NFPA 101, Life Safety Code. All interior walking and working surfaces which are part of the means of egress shall remain clear at all times and comply with the requirements of NFPA 101. Floors shall be kept in good condition and free of defects that can endanger workers or interfere with the handling of materials. Housekeeping – methods and controls are in place to minimize tripping hazards, the accumulation of flammable/combustible
PREPARED BY: djn/78 ABW/SEG 9 materials, etc. Portable metal ladders – methods and controls are in place to ensure inspection and safe use. Open-sided floors/platforms/runways must be protected and not left uncovered to prevent injury.
f. __Yes _X_ No, does not apply to this contract
f. EXCAVATIONS: Contractor shall comply with the standards in: 29 CFR 1926.651 and Subpart P, Appendix B & C and EM 385-1-1, US Army Corps of Engineers Manual, Safety and Health Requirements, 3 Nov 03 Section 25. In all excavations where employees are exposed to danger from moving ground, protection shall be provided by means of a shoring system, sloping of the ground or some other equivalent means. All trenches over five feet deep in either hard and compact or soft and unstable soil shall be sloped, shored, sheeted/braced or otherwise supported.
Trenches less than five feet in depth shall also be effectively protected when hazardous ground movement may be expected.
g. __Yes _X_ No, does not apply to this contract
g. SCAFFOLDING: Contractor shall comply with the standards in: 29 CFR 1910, Subpart D and 29 CFR 1926, Subpart L. Scaffolds are used for persons engaged in work that cannot be done safely from the ground or from solid construction. A competent and qualified person must be on site to make decisions on scaffolding operations. Contractor’s Safety Plan shall also address:
- Safety requirements for construction (as applicable), operation, maintenance, railings, toeboards, inspections, fall protection, and use
- Rails
- Bracing
- Toeboards
- Fall Protection
h. _X_Yes __ No, does not apply to this contract
h. POWERED PLATFORMS, MANLIFTS AND VEHICLE-MOUNTED WORK PLATFORMS: Contractor shall comply with the standards in: 29 CFR 1910, Subpart F.
Manlifts are used for the purpose of allowing workers to perform duties at elevated levels. A competent and qualified person must be onsite to make decisions on manlift operations.
Note: Fall restraint is the preferred method for fall protection. Contractor’s Safety Plan shall also address:
- Personal Fall Arrest Systems (PFAS) {body harness, lanyard, lifeline, etc., inspections}
PREPARED BY: djn/78 ABW/SEG 10
- Manlift – maintenance, inspection, and operation
i. __Yes _X_ No, does not apply to this contract
i. AERIAL LIFT EQUIPMENT: Contractor shall comply with the standards in: 29 CFR 1910.66, Subpart F , American National Standards Institute (ANSI) 92.2, ANSI 92.5, ANSI 92.6, and AFOSH STD 91-501, Air Force Consolidated Occupational Safety Standard, 7 Jul 04, para 16.4.3. Aerial lifts have inherent risks associated with their use. The Air Force has established procedures to ensure only trained and qualified personnel are operating aerial lifts.
In the past, the lifts were identified that did not meet regulatory safety requirements and foreign objects (FO) were found on the equipment. Based on this negative trend and a fatal mishap in years past, the following policies, procedures and processes will be adhered to when aerial lifts are used to support a contractor mission:
(1) Aerial devices shall include the following types of vehicle mounted aerial devices used to elevate personnel to job sites above ground:
- Extendible boom platforms
- Aerial ladders
- Articulating boom platforms
- Vertical towers and a combination of any of the above
(2) Aerial equipment may be made of metal, wood, fiberglass reinforced plastic, or other material; may be powered or manually operated, and are deemed to be aerial lifts whether or not they are capable of rotating about a substantially vertical axis.
Note: SCISSOR LIFTS: OSHA Interpretation letters on file, place scissors lifts in the above described category regardless of powered or manual.
j. __Yes _X_ No, does not apply to this contract
j. CONTRACTOR AERIAL LIFT DEVICES: Contractors shall comply with the standards in: 29 CFR 1910.67, 29 CFR 1926.453, and ANSI 92.2, Standards for Vehicle Mounted Elevating and Rotating Work Platforms. Contractors, subcontractors, vendors, commercial delivery companies, and all other private business vehicles will comply with the following requirements while operating any type of aerial lift as described above, while on a DoD installation. This includes contractor owned equipment, leased or rented equipment acquired to support the contractual activities. Unless otherwise provided in this section, aerial devices (aerial lifts) acquired on or after July 1, 1975, shall be designed and constructed in conformance with the applicable requirements of ANSI 92.2 - 1969, including appendix which is incorporated by reference as specified in 29 CFR 1910.66. Aerial lifts acquired for use before July 1, 1975 which do not meet the requirements of ANSI A92.2 - 1969, may not be used after July 1, 1976, PREPARED BY: djn/78 ABW/SEG 11 unless they shall have been modified so as to conform to the applicable design and construction requirements of ANSI A92.2 - 1969.Prior to bringing an aerial device on a DoD installation, the contractor will ensure: Aerial devices meet the above 29 CFR 1910.66 and 1910.67 requirements. Aerial devices meet certification and classification for the designated work area.
Aerial devices are serviceable, and all safety devices, warning devices, and interlocks operate.
Aerial devices (regardless of guardrail, mid-rail or toe board configuration) will have fall protection attach points installed. Aerial devices will contain the manufacturer’s manual and operator’s safety manual. The applicable ANSI Standard will satisfy the requirement for a safety manual. The contractor and operating employee will be trained and certified on the leased/rental device and provide visual certification upon request. Aerial lifts will not be used to deliver employees to higher levels unless so certified.
k. __Yes _X_ No, does not apply to this contract
k. PERSONAL PROTECTIVE EQUIPMENT FOR AERIAL LIFT DEVICES: To ensure compliance with 29 CFR 1910.66, Subpart F, Appendix C, 29 CFR 1910.133, Personal Protective Equipment, 29 CFR 1926.453, Aerial Lifts, 29 CFR 1926.104, Safety Belts, Lifelines & Lanyards, and 29 CFR 1926.501, Duty to Have Fall Protection; the contractor will ensure the following: Contractor employees will use fall restraint on all aerial lift devices unless so certified for fall arrest by the manufacturer. Fall restraint is the preferred standard for DoD installation operations with aerial devices. Fall restraint will consist of a harness (no body belts allowed) and a lanyard shortened to the minimum length to allow work but not allow the employee to leave the platform cage or stand on toe-boards or mid-rails. Energy absorbing lanyards are not authorized for fall restraint. Lanyards will have self-closing; self-locking keepers which remain closed and locked until unlocked and pressed open for connection or disconnection. Contractor employees operating, observing and spotting for aerial devices will wear approved hard hats.
l. _X_Yes __ No, does not apply to this contract
l. GENERAL FALL PROTECTION: Contractor shall comply with the standards in: 29 CFR 1910.66, Appendix C, Subpart F and 29 CFR 1926.500-502, Subpart M – If a person can fall 4 feet or more, fall protection must be provided to prevent injury. Contractor’s Safety Plan shall also address:
- Guardrail System (height and load rating)
- Safety Net System (location, inspection, and testing)
- Personal Fall Arrest System (PFAS)- life line, lanyard, component strength, and anchorage
- Fall Protection Plan
- Qualifications of persons
PREPARED BY: djn/78 ABW/SEG 12
m. __Yes _X_ No, does not apply to this contract
m. CRANES, DERRICKS, HOISTS, ELEVATORS, AND CONVEYORS: Contractor shall comply with the standards in: 29 CFR 1926, Subpart N – Cranes are used to move material, simplify materials handling and heavy or bulky supplies and equipment. Load capacities and operating speeds must be posted; special hazard warnings and instructions – visible to operator;
hand signals – per ANSI standard for type of crane in use and inspections are performed by a competent person. Personnel must be trained/qualified/certified by a nationally recognized crane certification league to operate these items.
n. _X_Yes __ No, does not apply to this contract
n. HAZARDOUS MATERIALS: Contractor shall comply with the standards in: 29 CFR 1910.120, Subpart H – The Handling and Storing of Hazardous Materials (chemicals, compressed air, acetylene, etc). When handling the hazardous material the following must be accomplished: Compressed gases – training, handling, storage, use, and PPE; flammable and combustible liquids – training, handling, storage use, and PPE. Contractor’s Safety Plan shall also address:
- Training, handling, storage, use and PPE
- Explosives and blasting agents
- Dipping and coating operations
o. _X_Yes __ No, does not apply to this contract
o. COMPRESSED GAS AND COMPRESSED AIR EQUIPMENT: Contractor shall comply with the standards in: 29 CFR 1910.169, Subpart M. Contractor’s Safety Plan shall also address:
- Employee Training
- Inspections
- Storage and Handling
p. _X_Yes __ No, does not apply to this contract
p. MATERIALS HANDLING AND STORAGE: Contractor shall comply with the standards in: 29 CFR 1926.250, 953, 957 and 29 CFR 1910.101, Subparts F, H & N and 29 CFR 1910.178, Powered Industrial Truck. Contractor’s Safety Plan shall also address:
- Storage and handling of materials
PREPARED BY: djn/78 ABW/SEG 13
- Disposal of trash from elevations
- Personnel lifting techniques--proper storage to prevent shifting, for stability, etc.
- Rigging (requirements, inspection, components, and qualifications)
- Equipment (use in handling materials)
- Industrial trucks (training, inspection, maintenance, and safe use)
q. __Yes _X_ No, does not apply to this contract
q. HAZARDOUS WASTE OPERATIONS: Contractor shall comply with the standards in: 29 CFR 1910.120 and 29 CFR 1926.65. Contractor’s Safety Plan shall also address:
- Emergency Response Plan
- Personal Protective Equipment
- Medical Surveillance
- Health and Safety Plan (HASP– required elements have been incorporated)
- Employee Training
r. _X_ Yes __ No, does not apply to this contract
r. PERSONAL PROTECTIVE EQUIPMENT: Contractor shall comply with the standards in: 29 CFR 1910.132, 134, 136, Subpart I and 29 CFR 1926.28, 95, 100, 101, 102, & 951.
Personnel protective equipment is required to be worn when employees are exposed to a potential hazard, working overhead, falling objects, etc. Contractor’s Safety Plan shall also address:
- Eye and face protection
- Head protection
- Foot Protection
- Electrical protective equipment
- Hand protection
- Safety harnesses, life lines, and lanyards.
s. __Yes _X_ No, does not apply to this contract
s. RESPIRATORY PROTECTION PROGRAM ELEMENTS: Contractor shall comply with the standards in: 29 CFR 1910.134 and 29 CFR 1926.134. Respirators are required to be worn if employees are exposed to inhalation hazard. Contractor’s Safety Plan shall also address:
- Training
- Medical evaluation
PREPARED BY: djn/78 ABW/SEG 14
- Fit tests
- Selection of respiratory equipment
- Storage of respiratory equipment
- Pre-use checks
t. __Yes _X_ No, does not apply to this contract
t. CONFINED SPACE PROGRAM ELEMENTS: Contractor shall comply with the standards in: 29 CFR 1910.120, 146 and 29 CFR 1926.21and 353 and AFOSH STD 91-25, Confined Spaces, 1 Feb 98. A confined space must meet the following three criteria:
(1) Is large enough and so configured that an employee can bodily enter and perform assigned work; and
(2) has limited or restricted means for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry.);
and
(3) is not designed for continuous employee occupancy. Examples: underground vaults, tanks, storage bins, manholes, pits, silos, process vessels, and pipelines.
Contractor’s Safety Plan shall address:
- Hazards of confined space
- Permit and Non-permit confined spaces
- Responsibilities of management, entry supervisor, authorized entrant, and authorized attendants
- Training requirements
- Permit handling and approval
- Emergency and rescue plans
- Testing and monitoring requirements
- Special hazards
- Posting requirements (applicable to subcontractor operated facilities)
u. __Yes _X_ No, does not apply to this contract
u. WELDING, CUTTING AND BRAZING: Contractor shall comply with the standards in:
29 CFR 1910.251 thru 255 and 29 CFR1926.102(b), 153, 453(b), AFOSH STD 91-5, Welding, Cutting and Brazing, Chapters 1-3, NFPA 410, Aircraft Maintenance, 2004 Edition, and NFPA 51B, Fire Prevention During Welding, Cutting, and Other Hot Work, 2003 Edition Contractor’s Safety Plan shall also address:
- Welding Permit Required from Fire Department
- Training/worker knowledge
PREPARED BY: djn/78 ABW/SEG 15
- Equipment inspections, service, and use
- Fire protection and prevention
- Protective equipment & welding shields
- Health protection (PPE)
- Ventilation
- Cylinders and containers
- Cylinder storage
v. _X_Yes __ No, does not apply to this contract
v. ELECTRICAL: Contractor shall comply with the standards in: 29 CFR 1910, Subpart S, 29 CFR 1926, Subpart K, AFOSH STD 91-501, Air Force Consolidated Occupational Safety Standard, 7 Jul 04, Chap 8, and NFPA 70. All electrical wiring must be IAW National Electrical Code (NEC) 70. Electrical wiring and equipment shall be a type listed by UL or another recognized listing agent. Contractor’s Safety Plan shall also address:
- Selection and use of work practices
- Training (basic electrical safety knowledge)
- Use of equipment (handling, visual inspection, rating of equipment)
- GFCI Protection for outside contractor drops and wet/damp areas
- Arc Flash
w. _X_Yes __ No, does not apply to this contract
w. HAZARDOUS ENERGY CONTROL PROGRAM ELEMENTS (LOCKOUT- TAGOUT): Contractor shall comply with the standards in: 29 CFR 1910, Subpart S, 29 CFR 1926, Subpart K, AFOSH STD 91-501, Air Force Consolidated Occupational Safety Standard, 7 Jul 04, Chap 21, and NFPA 70. Contractor’s Safety Plan shall also address:
- Purpose of hazardous energy control program
- Employee training
- Lockout/tagout procedures-Removal of locks and tags
- Periodic inspections
- Restoring equipment to normal operations
- Arc Flash
- Portable Fire Extinguishers (proper type, inspection, maintenance, testing, and training)
PREPARED BY: djn/78 ABW/SEG 16
x. __Yes _X_ No, does not apply to this contract
x. MACHINERY AND MACHINE GUARDING: Contractor shall comply with the standards in: 29 CFR 1910, Subpart O. Contractor’s Safety Plan shall also address:
- Control of rotating parts, flying chips, and sparks
- Inspection
- Maintenance
y. _X_ Yes __ No, does not apply to this contract
y. HAND AND PORTABLE POWERED TOOLS AND OTHER HAND-HELD EQUIPMENT: Contractor shall comply with the standards in: 29 CFR 1910, Subpart P and 29 CFR 1926, Subpart I. Contractor’s Safety Plan shall also address:
- Inspection
- Proper use
- Guarding
- Maintenance
- Control of rotating parts, flying chips, and sparks
z. __Yes _X_ No, does not apply to this contract
z. TOXIC AND HAZARDOUS SUBSTANCES: Contractor shall comply with the standards in: 29 CFR 1910, Subpart Z and 29 CFR 1926, Subpart Z. Contractor’s Safety Plan shall also address a section related to working with toxic and hazardous substances, such as asbestos, benzene, lead, and styrene, where the following areas are addressed:
- Threshold Limit Values (TLV)-Exposure monitoring
- Medical surveillance
- Work practices
- Engineering controls
- Respiratory protection
- Protective clothing (PPE)
aa. _X_Yes __ No, does not apply to this contract
aa. HAZARDOUS COMMUNICATIONS: Contractor shall comply with the standards in: 29 CFR 1910.1200. Contractor’s Safety Plan shall also address:
PREPARED BY: djn/78 ABW/SEG 17
- Written Program-list of hazardous chemicals
- Identify the hazardous chemical(s) - labeling system
- MSDS data sheet location
- Employee information and training-methods used to inform employees of the hazards, and precautionary measures
bb. __Yes _X_ No, does not apply to this contract
bb. DEMOLITION: Contractor shall comply with the standards in: 29 CFR 1926, Subpart T.
Contractor’s Safety Plan shall also address:
- Preparatory Operations
- Removal of Materials-walls, floors, & steel construction
- Mechanical Demolition
- Engineering survey by a competent person & service lines shut off
cc. __Yes _X_ No, does not apply to this contract
cc. HEAT STRESS: Contractor shall comply with the standards in: 29 CFR 1908, General Duty Clause - The employer will provide a safe and healthful workplace for all employees, AFJI 10-220 (DCMAI 8210.1, NAVAIRINST 37.10.1D), Contractors Flight and Ground Operations, 1 Mar 07, Section E (Procedures), Para 1d. Contractor’s Safety Plan shall also address:
- Pre-hydration
- Acclimatization
dd. __Yes _X_ No, does not apply to this contract
dd. GENERAL ENVIRONMENTAL CONTROLS: Contractor shall comply with the standards in: 29 CFR 1910, Subpart G, 29 CFR 1910, Subpart J and 29 CFR 1926, Subpart D.
Contractor’s Safety Plan shall also address:
- Sanitation-toilet and washing facilities
- Accident prevention signs and tags
PREPARED BY: djn/78 ABW/SEG 18
ee. _X_Yes __ No, does not apply to this contract
ee. HEARING CONSERVATION PROGRAM ELEMENTS: Contractor shall comply with the standards in: 29 CFR 1910.95 and 29 CFR 1926.52. Note: Noise exposures are based on ACGIH guidelines of 85 dB TWA. Contractor’s Safety Plan shall also address:
- Monitoring (survey of noise producing equipment)
- Audiometric testing
- Hearing Protectors
- Training
- Recordkeeping/Access to information and training material
ff. _X_Yes __ No, does not apply to this contract
ff. MEDICAL AND FIRST AID: Contractor shall comply with the standards in: 29 CFR 1910, Subpart K and 29 CFR 1926, Subpart C. Contractor’s Safety Plan shall also address:
- Adequate first aid supplies
- Trained employee to render first aid
- Recordkeeping
- Reporting and investigating accidents/incidents
- Off-site physician(s)
- Maintenance of and employee access to exposure monitoring data and medical records
gg. _X_Yes __ No, does not apply to this contract
gg. GROUNDING, BONDING OF AIRCRAFT & AVIONICS EQUIPMENT: Contractor shall comply with the standards for grounding and bonding in accordance with T.O. 00-25-172, Ground Servicing of Aircraft and Static Grounding/Bonding, 15 Jul 02/Change 12-12 Feb 08, for aircraft repair and T.O. 00-25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical Equipment, 1 Aug 88/Change 36, 13 Aug 07, for avionics equipment.
hh. _X_Yes __ No, does not apply to this contract
hh. BATTERIES: Contractor shall comply with the standards for battery servicing in accordance with OSHA Standard 29 CFR 1910.178, 29 CFR 1910.305 and site specific applicable aircraft T.O.s.
PREPARED BY: djn/78 ABW/SEG 19
ii. __Yes _X_ No, does not apply to this contract
ii. HANDLING, STORAGE & USE OF FLAMMABLE/COMBUSTIBLE LIQUIDS:
Contractor shall comply with the standards in: NFPA 30, Flammable and Combustible Liquids Code, 2008 Edition, NFPA 33 Spray Application Using Flammable or Combustible Materials, 2007 Edition, DoDI 4145.19-R-1, Storage and Materials Handling, 15 Sep 79, Chpts 5 & 6, and DoDI 4140.25-M (for POL storage).
jj. _X_ Yes __ No, does not apply to this contract jj SYSTEM MODIFICATION-WHICH ALTERS FORM, FIT OR FUNCTION:
Contractor shall comply with: Mil Standard 882D, Standard Practice for System Safety, 10 Feb 00 and AFI 91-202, The US Air Force Mishap Prevention Program, 1 Aug 98, Chap 9 for system modifications, which alter form, fit, or function.
kk. _X_ Yes __ No, does not apply to this contract
kk.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .