About this file

This performance work statement outlines repair services required for the AN/ALQ-172 Countermeasures System installed on various Air Force aircraft. The contractor shall repair line replaceable units and shop replaceable units listed in Appendix B at their facility in New Jersey. The period of performance is one base year plus four option years. The contractor must meet quality standards with no more than one product quality deficiency report or two total reports per year. Repairs shall achieve a 95% pass rate on initial inspection. The contractor shall use the Commercial Asset Visibility-Air Force system to report production and receive material. Delivery must be on time for 95% of orders with the remainder delivered within 15 days of notification. Surge and mission-critical requests shall be completed within 14 days. The contractor will participate in biannual collaborative supply planning meetings and procure lay-in materials as needed with government approval.

PWS

View the file

Other files for this federal contract opportunity

Other files attached to AN/ALQ-172 (V) Countermeasures System (CMS) Repair, newest first.
File Type Posted
SpecialPackagingInstructions.pdf PDF
DD254.pdf PDF
CDRLs.pdf PDF
Packaging.pdf PDF
SecurityClassificationGuide.pdf PDF
Solicitation_FA852219R0002.pdf PDF
WAGEDET.docx DOCX document
QASP.docx DOCX document
Transportation.pdf PDF
Form807.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-20-00006 PWS 1

Distribution Statement: C

Performance Work Statement (PWS) for

Repair of AN/ALQ-172 ITEMS

Purchase Request: FD2060-20-00006

Date: 21 February 2019

Distribution Statement C: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors (Critical Technical) (01 MAY 97). Other requests for this document shall be referred to AFSC/PZABB-R, Robins AFB, GA 31098-5365. Questions concerning technical content should be directed to 408 SCMS/GULB.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751 et seq.) or the Export Administration Act 1979, as amended (Title 50, U.S.C., App. 2401 et seq.). Violators of these export laws are subject to severe criminal penalties.

HANDLING AND DESTRUCTION NOTICE - Comply with distribution statement and destroy by any method that will prevent disclosure of the contents or reconstruction of the document.

PR: FD2060-20-00006 PWS 2

1.0 Description of Services

This Performance-Based Work Statement establishes the procedures that will be utilized to have AN/ALQ-172 National Stock Numbers listed in Government Furnished Property for repair and returned to the Air Force to meet user demands and performance requirements. The AN/ALQ-172 Countermeasures System (CMS) is the primary Radio Frequency (RF) Electronic Warfare (EW) system installed on US Air Force (USAF) Global Strike Command (AFGSC) B- 52H strategic bombers (AN/ALQ-172(V)2), Air Force Special Operations Command (AFSOC) MC-130H Combat Talon 'II' transports and AC-130U (ALQ-172(V)1) gunships. The contractor shall accomplish repair for AN/ALQ-172 National Stock Numbers listed in Government Furnished Property of this document. This repair requires specific knowledge and skills.

1.1 Objective(s)

The primary objective of this effort is the repair of critical assets that will maintain the war readiness of the AN/ALQ-172 weapon system. The contractor shall maintain the defined workflow of accurate repair on the AN/ALQ-172 National Stock Numbers listed in Government Furnished Property of this document while meeting the repair Turn Around Times (TAT) of routines, SURGE, and MICAP requirements, maintaining quality control and configuration control along with providing prompt and accurate transaction reporting in CAVAF. This document defines the necessary repair and testing to ensure that each end item is in serviceable condition prior to return to government supply and that the end item efficiently serves its intended purpose. The primary objective of this effort is the repair of critical assets that will maintain the war readiness of the AN/ALQ-172 weapon system.

1.2 Benefit to United States Air Force (USAF):

This acquisition will benefit the United States Air Force (USAF) by providing accurate repair services for the AN/ALQ-172 National Stock Numbers listed in Government Furnished Property of this document in support of the B-52H, MC-130H and AC-130U & C-130 H fleet, and mission. These items are a configuration management item of the AN/ALQ-172 system (see Appendix “B” of this document).

1.3 Background:

These AN/ALQ-172 assets which are a vital part for operation of the system during missions.

The Repair of these assets is a (counter measure signal controller) that identifies and make priority decision on emitters received in support of the B-52H, MC-130H and AC-130U fleet and mission. The purpose of this effort will provide a continued flow of serviceable assets to the warfighter.

2.0 Services Summary

Performance Objective PWS

Reference Performance Threshold

Quality system shall be established and maintained for repair

4.8 Repaired assets shall pass DCMA inspection

with no more than one failure per year.

At a minimum, 95% of repaired assets shall pass initial inspection. Remaining 5% (or less) of

PR: FD2060-20-00006 PWS 3

failed assets shall pass on the second attempt.

This metric will be calculated monthly.

There shall be no more than two PQDRs and/or QDRs per year.

Report production in CAV-AF accurately and on time.

4.14 The Contractor shall provide data on the actions

conducted for each unit. The Contractor shall report as actions occur.

Establish and maintain Contractor Manpower Reporting

5.8 Within 30 calendar days of contract/order award, the Contractor shall establish a record for the contract/order in eCMRA including Order Data, Contact Data and Location Data.

The Contractor shall provide a count of contractor/subcontractor personnel performing services for each fiscal year and report all contractor/subcontractor labor hours required for performance of services for each fiscal year. All data shall be reported no later than October 31 of the following fiscal year.

3.0 Government Property: Government property will be provided.

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.

3.2 Government Property to be provided:

Government property is not authorized IAW this PWS beyond providing unserviceable assets.

The contractor shall furnish all material and parts necessary for the performance of these services. The government will provide the unserviceable AN/ALQ-172 National Stock Numbers listed in Appendix “B” of this document for contractor repair.

3.3 Loss of Government Property

3.3.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.3.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property using Defense Contract Management Agency (DCMA) / Access to eTools.

PR: FD2060-20-00006 PWS 4

3.4 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

4.0 Technical Requirements

4.1 AN/ALQ-172 Repair Technical Performance

4.1.1 Contract/Order Period of Performance

The period of performance for the FD2060-20-00006 contract /order is for basic year period and four option years FY20-25, over contract PoP 5.5 years per 52.217-8, Option to Extend Services.

4.1.2 Place of Performance

The place of performance for this contract will be exclusively not on a U.S. Government installation. These services shall be performed at the contractor’s facility in Harris Corporation, 77 River Road, Clifton, NJ 07014; CAGE: 1D522 (classified) and CAGE: 28527 (unclassified).

4.2 Contract Data Requirements List(s) (CDRL)

Document Identifier DID Title PWS

Reference(s) A001 DI-MGMT-80441C Government Property Physical Inventory Report (annual) 4.2.3.1 A002 MIL-STD-3018 Parts Management 4.2.3.2 A003 DI-NDTI-80809B Test Plan 4.2.3.3 A004 DI-MGMT-81634C Commercial Asset Visibility Air Force (CAVAF) /

Government Furnished Material Report 4.14.1

A005 DI-MGMT-81995 Contract Depot Maintenance Production Monthly Status Report

4.15

A006 DI-MGMT-81838 CAV AF CFM End Item Reporting 4.14.1 A007 DI-MGMT-82128 Contract Government Furnished Material (GFM)

Requisition and Inventory Report 4.14.2

4.2.1 Quality of CDRL Deliverable

There shall be no more than one rejection of any deliverable. There shall be no more than one total rejection of deliverables per year. The Government will reject a deliverable if two or more technical errors or one or more minor errors are found within the deliverable. A technical error

PR: FD2060-20-00006 PWS 5

is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within three business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable

CDRL deliverables may be submitted via Wide Area Workflow e-Business Suite / Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) or be submitted directly to the Multi Functional Team (MFT) member identified on the CDRL. There shall be no more than one late submission of deliverables per year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.2.3 Government Property Inventory Report (annual)

4.2.3.1 Government Property Inventory Report: The contractor shall perform an annual 100% physical inventory. The annual period of performance for the contractor to accomplish the required action shall be one year starting from the date of award. All results, findings and corrective actions of any annual physical inventories shall be provided to the Government 21 working days after the one year mark. - CDRL A001, DI-MGMT-80441C, Government Property Inventory Report.

4.2.3.2 Parts Approval Request, DD Form 2052: Nonstandard parts, as defined by non Mil Standard or noncommercial equivalent that are used in this repair must be approved by AFLCMC/WNYEBA. CDRL A002, MIL-STD-3018, Parts Management

4.2.3.3 A Test Plan shall be generated and submitted upon completion. The report shall contain the results of the qualification testing and all of the acceptance testing performed. The contractor shall maintain and available upon request from the program office. -CDRL A003, DI-NDTI- 80566A, Test Plan

4.3 Repair

4.3.1 The contractor shall return the end item to a serviceable, but not like new, condition. The extent of work required to assure a serviceable end item shall efficiently serve its intended purpose shall be determined by visual inspection, electrical testing and disassembly as necessary.

Material or parts used for replacement shall be equal to or exceed the quality of the original material or parts. The material or parts used shall be entirely suitable for repair of the ALQ-172 Weapon System. NSNs in the table as shown in Appendix “B” of this document shall be completely interchangeable without alterations of either of the subassemblies. Parts which bear a national stock number designation may be replaced by a similar part, provided the alternate part is designated as an acceptable replacement by a federal catalog and approved by 408 SCMS/GUEA Engineering or AFLCMC/WNYEBA ALQ-172 System Engineering.

4.3.2 The contractor shall provide a minimum of 95% on time delivery of all orders with the remainder filled within 15 calendar days after receipt of Government notification, at an average monthly minimum output stated in the schedule of (6) items for LRU-3 / LRU-21, all other CLINS 4 per month NSNs. The average monthly minimum output of six (6) items LRU-3 /

PR: FD2060-20-00006 PWS 6

LRU-21, all other CLINS 4 per month NSNs. NSNs is defined as the total quantity and mix of all items/NSNs that are ordered. The average monthly minimum output of six (6) items LRU-3 / LRU-21, all other CLINS 4 per month NSNs shall begin at the delivery commencement month and rates noted at the CLIN level in the schedule for that particular CLIN after receipt of the funded order. This is providing the Contractor has received sufficient repair assets to maintain the average. If the Contractor cannot deliver the remaining item(s) within the 15 calendar days after notification by the Government, the Contractor shall notify the Government in writing and propose a revised delivery date. Accelerated and early delivery is acceptable.

4.3.3 Surge and MICAP Repairs: The Contractor shall provide timely response to 100% of the Surge and MICAP requirements. The Contractor will notify the Production Management Specialist (PMS), within three business days of notification of Surge and MICAP requirements, and propose a revised delivery schedule.

4.3.4 Delivery Schedule: The delivery schedule shall be provided via email and shall include constraints (such as carcass availability and funding) and any negative impact to the delivery schedule. Delivery schedule for Surge and MICAP repairs shall be met in accordance with the negotiated contract schedule; while the turnaround time (TAT) is subject to material availability, satisfaction of all Surge and MICAP requirements shall be 14 days. Performance thresholds are to provide timely response 100% of the time and to meet the proposed schedule for Surge and MICAP requirements 100% on time.

4.3.5 Any Line Replaceable Unit (LRU) that fails final Acceptance Test Procedures (ATP) must be repaired and pass final ATP within 30 calendar days after the failure. Any Shop Replaceable Unit (SRU) that fails final ATP must be repaired and pass final ATP within 14 calendar days after the failure. Only one late/rework is allowed per quarter. This metric begins 6 months after receipt of Contract.

4.3.6 The contractor shall provide a timely response when information and status are needed via the regular flow of information exchanges between the contractor and the government.

4.3.7 Exchange of parts between assemblies and/or subassemblies is authorized with the agreement that the same number of assets are to be returned serviceable, unless the asset(s) is deemed “not repairable” or condemned. Exchange of parts shall not be a reason for condemnation.

4.3.8 Collaborative Supply Planning (CSP) Meetings: CSP meetings shall occur biannually or sooner with the location to be determined at the time the meeting is scheduled or through a telecom. The government reserves the right to schedule others as required, provided that funding is available on an active order for that contract period or if additional funding is provided via a modification to an active funded order or via a new funded order. The contractor shall actively support CSP meetings by providing information; such as, contractor operations support data, current contract deliverable status, Diminishing Manufacturing Sources (DMS) information, obsolescence data and/or necessary technical support data as required. The contractor shall identify single point of contact who will be responsible and who shall have the requisite authority to represent the organization to priorities agreed to in the CSP meetings. The CSP

PR: FD2060-20-00006 PWS 7

meeting will include Multi-Functional Team (MFT) as defined in the Quality Assurance Surveillance Plan (QASP). The goal of the CSP meetings will be to establish the requirements for repair for the subsequent six (6) month period, reflecting the current demand and enterprise wide prioritization, as well as the consideration of outstanding delivery requirements resulting from previous orders issued under this contract. The resulting list of requirements will become the baseline for delivery orders issued during the next six (6) month period.

4.4 Enhanced Maintenance Test Station (EMTS) If a Line Replaceable Unit (LRU) fails in the EMTS station located at Harris’ repair facility, the contractor will notify the 408 SCMS/GULB Program Manager or Production Management Specialist (PMS) Seller within 3 business days and await disposition instructions from the program office. The government shall be responsible for repairing the failed LRU or replacing it with another one of serviceable condition. Any decision to repair and/or replace GFE must be done with the 408 SCMS/GULB Program Manager or PMS Seller or Equipment Specialist. Any repair to the LRU done at the contractor’s facility will be billed against that specific LRU’s contract line item (CLIN) on the repair contract and the asset will be “ship in place”. If GFE is repaired that is not at the LRU level, approval must be granted before the repair by the 408 SCMS/GULB Program Manager or PMS Seller, the CLIN for Labor To Repair GFE will then be billed. In the case that the LRU must be replaced with another unit, the contractor will be required to ship the unserviceable LRU back to the government based on the program office’s disposition instructions. If WR-ALC does not have a supportable asset posture or repair line in place for that LRU, the contractor can then request to bill to the CLIN for Labor To Repair GFE after approval of the 408 SCMS/GULB Program Manager or PMS Seller.

4.5 GFE Support Equipment will be repaired and calibrated under the appropriate GFE Support Equipment CLIN as noted in the contract with approval from the 408 SCMS/GULB Program Manager or PMS Seller.

4.6 Lay-In Material: The contractor shall procure lay-in material as required to meet the repair BEQs and Support Equipment Repairs / Calibration, per approval from the 408 SCMS/GULB Program Manager or PMS Seller before being purchased.

4.7 Definitions

4.7.1 End Item: For the purpose of this PWS, end items are the articles of equipment listed as Line Items on this contract.

4.7.2 Serviceable: An item capable of meeting the requirements and performing the function for which it is designed and meeting all test requirements established by the PWS.

4.7.3 Fast Transportation: End items shall be shipped per the fastest traceable means available to destinations specified by the government.

4.7.4 Over and Above: Over and Above will be utilized in accordance with FAR section 252.217-7028. Over and Above will be approved on a case by case basis. Any requests for over

PR: FD2060-20-00006 PWS 8

and above work shall be sent to the ACO and PCO. The Over and Above line shall only be used for requests relating to repairs, test equipment, any obsolescence resolution.

4.8 Quality

4.8.1 Quality of repairs would include no more than one Product Quality Deficiency Report (PQDR) per year deemed to be the fault of the contractor following the PQDR investigation.

4.8.2 As a minimum, the contractor’s quality system shall be established and maintained in accordance with Quality System Model for Quality Assurance in Design, Development, Production, Installation, and Servicing. This system shall be developed and available for cognizant Government Quality Assurance Representative (QAR) review prior to beginning production.

4.8.3 Repaired assets shall pass inspection with no more than one failure per year.

At a minimum, 95% of repaired assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt. This metric will be calculated monthly There shall be no more than two PQDRs and/or QDRs per year.

4.9 Configuration Control

The contractor shall not incorporate any engineering changes to the end item that will affect form, fit, or function of the end item prior to obtaining approval from 408 SCMS/GUEA Engineering or AFLCMC/WNYEBA ALQ-172 System Engineering through the Procuring Contracting Officer (PCO). Any changes made without written approval from WRALC shall require removal at contractor’s expense.

4.10 Condemnation

4.10.1 The contractor shall be required to repair all items unless written direction is provided by the Administrative Contracting Officer (ACO) which excludes a particular item from these requirements. Request for condemnation shall only be submitted to the 408 SCMS/GULB Program Manager or PMS Seller for approval/disapproval if the unit falls into one of the criteria specified below:

4.10.1.1 Physical damage destroys 75% of the physical and electrical integrity of the unit (i.e.

crushed).

4.10.1.2 Overheating and subsequent destruction of 80% of the internal electrical components and electrical connections.

4.10.1.3 Damage due to fire, explosion, flood, aircraft crash or enemy combat action.

4.10.1.4 Items condemned under the provisions of this contract shall be replaced by reparable assets provided by the Government from within existing inventory. Items condemned under provisions of this contract will be replaced by the government with replacement assets for repair at no additional cost to the government.

4.10.1.5 All items condemned that contain precious metals, silver, gold, platinum, rhodium, iridium, osmium, and ruthenium, scrap bearing such metals, and items containing recoverable quantities thereof shall be reported to the Defense Reutilization and Marketing Service, PR: FD2060-20-00006 PWS 9

DRMS-SM, Federal Center, 74 N. Washington, Battle Creek, MI 49017-3084 for disposition instructions.

4.10.1.6 Condemned items shall be disposed of after consulting and receiving instructions from the Multi-Function Team.

4.11 Production Problems

Should the contractor encounter any problems that will impact performance under the contract, the contractor shall promptly report them to the PCO and/or ACO and/or PMS Seller and/or 408 SCMS/GULB Program Manager or PMS Seller.

4.12 Workflow

4.12.1 Receiving

4.12.2 End items inducted for repair shall be handled in accordance with industry best accepted practices for receiving Government Equipment.

4.12.3 The end items shall be handled and stored in such a manner as to prevent damage and theft. The contractor shall secure and process end items returned for repair in accordance with the contract security requirements.

4.12.4 When shipping containers are received that meet the requirements of the AFMC Form 158 (Packaging Requirements) and are suitable for return shipment of serviceable assets, they shall be reclaimed, stored, and protected for reuse. If a containor does not meet the packaging requirements or is damaged, the contractor shall submit a request to the Administrative Contracting Officer (ACO) for approval/disapproval to return. Alternatively the contractor can request a new shipping container via CAV-AF.

4.12.5 Any misdirected or misidentified shipments shall be reported for disposition in accordance with the contractor’s Government Property Management Procedure.

4.12.6 Repairs shall be made at the contractor’s facility and as a minimum shall be accomplished in accordance with the contractor’s Quality System Model and applicable engineering drawings, processes and procedures listed herein.

4.12.7 During inspection and for functional test, the presence of corrosion on components or unit chassis shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found on a component, disassembly shall be made only to the extent necessary to remove corrosion or replace parts. Corrosion removal and treatment of affected areas shall be accomplished using approved methods and materials in accordance with best industry practice.

4.12.8 After repair is completed, the contractor shall inspect item to be sure that all tools/foreign objects have been removed and that there are no loose parts.

4.12.9 Repaired end item shall be labeled in accordance with the applicable contractor drawing.

All repaired end items shall be refinished only to the extent necessary to assure adequate protection of all surfaces. End items should not be refinished to a like new condition merely for appearance. Repaired end items shall be subjected to and acceptance shall be in accordance with

PR: FD2060-20-00006 PWS 10

WR/ALC approved ATP listed herein. Approved ATP shall not be revised without AFLCMC/WNYEBA Engineering approvals.

4.12.10 All repaired end items shall be final inspected by the contractor’s Quality Assurance Department, or designee, and submitted to the Government QAR for CQA and Acceptance at Origin on a Material Inspection and Receiving Report (WAWF).

4.12.11 Upon completion of all inspections, all ports, vents, and openings shall be covered with plugs, caps, or sealed in plastic bags to prevent entry of foreign matter or contamination into the end item.

4.13 Packaging

The Contractor shall package and mark material in accordance with the contract/order Air Force Packaging Requirements and applicable Government regulations.

4.14 Commercial Asset Visibility-Air Force (CAV-AF)

4.14.1 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production in CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur. -CDRL A004 DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF); The CAV AF System transactions are processed via the World Wide Web, https://www.cavaf.com. /Government Furnished Material Report, -CDRL A006 DI-MGMT-81838.

4.14.2 The Contract Government Furnished Material (GFM) Requisition and Inventory Report provides the Government with monthly information in determining GFM balances by condition code, consumption, turn-ins, transfers, due-ins, receipts, plant clearance and shipping actions. CDRL A007 DI-MGMT-82128, Contract Government Furnished Material (GFM) Requisition and Inventory Report

4.15 Contract Depot Maintenance Production Report

Contract Depot Maintenance Production Report: This is a two-part report which provides the Government with monthly maintenance of transit, induction, condemnation and production figures; status and accountability of assets at a contractors facility, performance to schedule, and the summary of unresolved problems at the end of the report period. The PMS shall compare report data to CAV AF reporting actions to identify variances in a timely manner and communicate to contractor required CAV AF corrective actions are to be accomplished within 24 hours of notification. This report shall be provided 10 working days after the end of each month. -CDRL A005, DI-PSSS-81995, Contract Depot Maintenance Production Report

4.16 Travel: Travel requests for contractor/subcontractor personnel shall be submitted for approval to the 408 SCMS/GULB Program Manager or PMS Seller prior to costs being incurred and a minimum of 10 business days in advance of departure. Receipts must be presented with the invoice for reimbursement of actual travel costs.

https://www.cavaf.com/

PR: FD2060-20-00006 PWS 11

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Security Regulations

The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility. The Contractor shall comply with the following security regulations: Government Security regulations including, DoD 5200.2-R, Personnel Security Program; DoDD 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and AFI 31-101, Integrated Defense.

5.2.2 Operations Security (OPSEC)

Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E and DoD Manual 5205.02-M to protect United States (U.S.)

Government interests. The Contractor shall ensure Contractor personnel who perform work on a Government facility comply with the OPSEC procedures of the facility.

5.2.3 Communications Security (COMSEC)

The contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or Controlled Unclassified Information (CUI) in accordance with DoD 5220.22-M. Applicable equipment shall be safeguarded, maintained and operated in accordance with DoD 5220.22-M.

5.2.4 Security Clearance

It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements. Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

5.2.5 Security Incident or Violation

The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified and/or controlled unclassified information.

5.2.6 Security of Contractor System(s)

The Contractor shall ensure the security of automated information systems at the Contractor’s facility to preclude potential security incidents or violations including potential unauthorized disclosure or compromise of classified and/or controlled unclassified information.

5.2.7 Access to Government System(s)

PR: FD2060-20-00006 PWS 12

Access to Government system(s) will not be required to perform tasks under the contract/order.

5.3 Environmental Management System (EMS)

These services shall not be performed at a Government facility; therefore, the EMS requirement does not apply.

5.4 Agency Affirmative Procurement Programs

In accordance with FAR 23.404, Agency Affirmative Procurement Programs, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [http://www.epa.gov/cpg/products.htm] and/or United States Department of Agriculture (USDA)-designated products included in the bio-based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio-based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

5.5 Environmental Management System (EMS): Contractor/subcontractor personnel who perform work in any Government facility shall comply with the EMS requirements established by the facility. Contractor/subcontractor personnel may be required to complete EMS training prior to beginning work.

5.6 Safety Requirements

5.6.1 Contractor Compliance

The Contractor shall comply with Government Safety and Health regulations including, Public Law 91-596 as amended by Public Law 101-552 [Occupational Safety and Health Act of 1970 (OSHA)] and DoDD 4715.1E, Environment, Safety, and Occupational Health (ESOH).

5.6.2 Mishap Notification/Investigation

The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations. The Contractor shall ensure the Safety Office and the PCO are notified of mishaps. The Contractor shall contact the MFT by telephone within eight (8) business hours. The Contractor shall cooperate with Government safety investigations.

5.7 Inspection of Services

In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

5.8 Contractor Manpower Reporting

In accordance with 10 United States Code 2330a, the Contractor shall provide an annual count of contractor/subcontractor personnel performing work for each fiscal year if the DoD is the requiring activity, if the acquisition is using U.S. Government appropriated funds, and if the acquisition is in excess of $3,000,000.00. The Contractor shall report all Contractor labor hours, http://www.epa.gov/cpg/products.htm http://www.biopreferred.gov/

PR: FD2060-20-00006 PWS 13

including subcontractor labor hours, required for performance of the services provided under the contract in the Enterprise-wide Contractor Manpower Reporting Application (eCMRA).

Reporting shall be conducted for each fiscal year, which extends October 1 through September

30. While inputs may be made any time during the fiscal year, all data shall be reported no later than October 31 of the following fiscal year. The Contractor shall establish a record for the contract/order in eCMRA no later than 30 calendar days after contract/order award. The Contractor shall enter Order Data, Contact Data and Location Data. Data for Air Force service requirements must be input at the Air Force CMRA link. Additional information and user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

5.9 Invoicing/Payment and Receipt/Acceptance

The multi-functional team (MFT) can request that data items be attached to acceptance forms through Wide Area Work Flow (WAWF) or submitted to Government personnel as spelled out in the data Contract Data Requirements List (CDRL). To allow for payment of separately priced data items, the MFT must use WAWF for acceptance. Data CDRL will determine submittal requirements; however, both separately priced and non-separately priced items must be accepted in WAWF in order for the line item to be closed out in the contract. Information regarding Wide Area Work Flow-Receipt and Acceptance is available on the Internet at https://wawf.eb.mil.

5.10 Trafficking in Persons

The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons.

http://www.state.gov/j/tip

6.0 Appendices

6.1 Appendix A, Reference(s)

Publication Title of Publication Date of

Publication Sections(s) that Apply

DoD 5220.22-M

National Industrial Security Program Operating Manual (NISPOM).

February 28, 2006 Change 1 - March 28, 2013

Entire

DoDD 4715.1E

Environment, Safety, and Occupational Health

(ESOH)

March 19, 2005 Entire

DoDD) 5205.02E

DoD Operations Security (OPSEC) Program June 20, 2012 Entire

DoD Manual 5205.02-M

DoD Operations Security (OPSEC) Program Manual

November 3, 2008

Public Law 91-

Occupational Safety and Health Act of 1970 December 29, Entire http://www.ecmra.mil/ https://wawf.eb.mil/ http://www.state.gov/j/tip

PR: FD2060-20-00006 PWS 14

596 as amended by Public Law 101-as amended through January 1, AFI 10-

Deployment Planning and Execution 20 Sep 12 1.9.1.33

DFARS

252.237-

Continuation of Essential Contractor Services Oct 2010 Entire

SAF/AQ

Memo 11 Jun 13 and

SAF/AQ

Memo, 13 Nov 12

Implementation of FY11 NDAA 8108, Contractor Inventory

11 Jun 13 and 13 Nov 12

Entire

MIL-STD-

130N

DoD Standard Practice Identification Marking of US Military Property

17 Dec 07 Entire

DFARS

252.211–

Item Identification and Valuation Jun 2011 Entire

MIL-STD-

2073-1d

Standard Practice for Military Packaging 10 May 02 Entire

MIL-STD-

129P With Change 4

Military Marking for Shipment and Storage Sep 2007 Entire

FAR

52.246-4

Inspection of Services Fixed Price June 2013 Entire

DoD 4100.39-M

Federal Logistics Information System May 2010 and Change Letter Oct

Entire

SAF/AQ

Memo

Contractor Inventory Requirements 13 Nov 12 Entire

AFI 31-

Integrated Defense 2 Aug 04 Entire

IAW AFI

91-204

Safety Investigations and Reports 9 Aug 12 http://www.e-publishing.af.mil

Paragraph 2.12

DoD 5200.2-R

Personnel Security Program 23 Feb 96 Entire https://www.my.af.mil/gcss-af/USAF/AFP40/d/sA4057E1F39D499180139F925AC8404A0/Files/editorial/Revised%20Implementation%20of%20FY11%20NDAA%20Section%208108%20-%20AQX.pdf?channelPageId=sA4057E1F39D499180139F925AC8404A0&programId=tA4057E1F3B4D0604013B51C0645700FA https://www.my.af.mil/gcss-af/USAF/AFP40/d/sA4057E1F39D499180139F925AC8404A0/Files/editorial/Revised%20Implementation%20of%20FY11%20NDAA%20Section%208108%20-%20AQX.pdf?channelPageId=sA4057E1F39D499180139F925AC8404A0&programId=tA4057E1F3B4D0604013B51C0645700FA https://www.my.af.mil/gcss-af/USAF/AFP40/d/sA4057E1F39D499180139F925AC8404A0/Files/editorial/Revised%20Implementation%20of%20FY11%20NDAA%20Section%208108%20-%20AQX.pdf?channelPageId=sA4057E1F39D499180139F925AC8404A0&programId=tA4057E1F3B4D0604013B51C0645700FA https://cs.eis.af.mil/airforcecontracting/knowledge_center/Documents/AFFARS_Library/5337/2012-11-13_saf-aq-memo.pdf https://cs.eis.af.mil/airforcecontracting/knowledge_center/Documents/AFFARS_Library/5337/2012-11-13_saf-aq-memo.pdf https://cs.eis.af.mil/airforcecontracting/knowledge_center/Documents/AFFARS_Library/5337/2012-11-13_saf-aq-memo.pdf http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/

PR: FD2060-20-00006 PWS 15

6.2 Appendix B, AN/ALQ-172 National Stock Numbers for Repair

5895-01-424-5098EW LRU-3 2637803A001 / G001

5895-01-485-6252EW LRU-21 2680721G003

5998-01-424-7126EW LRU-1 BP 2637832G001

4920-01-213-5938EW RFIU 2632469G001

5998-01-424-3963EW LRU-10 BP 2637834G001

5865-01-198-5144EW 2A2 Card Cages 2487524A001 / G001

5998-01-450-6531EW LRU-4 BP 2637850G001

5895-01-506-9868EW 21A1 2681785G001

6625-01-574-3519 Spectrum Analyzer 1166.1660.26 / FSU26

5998-01-489-0712 GPIB VXI CARD 185893H-0110/777126-01

5945-01-509-7551 RF Switch Assembly 2681910G001 / 86001951

6625-01-510-3605 TEST SET EMTS VXI COMP 2681912G001

5995-01-508-4208 CABLE ASSEMBLY, CDU

1553/VIDEO STUB (W93) 2682050G001

6625-01-508-8808 SIGNAL GENERATOR 3132456G001

6625-01-576-6001 WAVEFORM GENERATOR 407677-001S1731

5895-01-573-4492 High Density Multiplexer Module 407410

5895-01-508-7214 COAX VXI CARD 70-0083-019

5998-01-598-5471 LXI VXI CARD 70-0313-000

5998-01-591-3035 MODULE, VXI, DRIVER 90400660-001

6625-01-476-1411 Oscope TDS3054 895-01-506-9868EW Circuit Card Assembly 2681785G001 5998-01-424-3960EW Circuit Card Assembly 2637826G001 5998-01-217-9479EW Circuit Card Assembly 2625900G001 5865-01-668-8772EW New LRU-10 TBD 5865-01-669-5621EW New LRU-12 2624712G004 5998-01-255-5500EW Circuit Card Assembly 5998-01-499-7569EW Circuit Card Assembly 5998-01-302-3427EW Old LRU-10 Backplane Assembly 5895-01-557-7498EW Core Memory Unit 5998-01-197-5794EW Circuit Card Assembly

PR: FD2060-20-00006 PWS 16

4.1 AN/ALQ-172 Repair Technical Performance
4.1.1 Contract/Order Period of Performance
4.1.2 Place of Performance
4.2 Contract Data Requirements List(s) (CDRL)
4.2.1 Quality of CDRL Deliverable
4.2.2 Receipt of CDRL Deliverable
4.3 Repair
4.6 Lay-In Material: The contractor shall procure lay-in material as required to meet the repair BEQs and Support Equipment Repairs / Calibration, per approval from the 408 SCMS/GULB Program Manager or PMS Seller before being purchased.
4.8 Quality
4.9 Configuration Control
4.10 Condemnation
4.11 Production Problems
4.12 Workflow
4.13 Packaging
4.14 Commercial Asset Visibility-Air Force (CAV-AF)
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis
5.2 Security Requirements
5.2.1 Security Regulations
5.2.2 Operations Security (OPSEC)
5.2.4 Security Clearance
5.2.5 Security Incident or Violation
5.2.6 Security of Contractor System(s)
5.6.2 Mishap Notification/Investigation
5.7 Inspection of Services
5.8 Contractor Manpower Reporting
5.9 Invoicing/Payment and Receipt/Acceptance
5.10 Trafficking in Persons

File details come from the government source that posted it. Updated .