CDRL_REPORT.pdf
PDF 27 KB Posted
- Solicitation number
- FA852215R00040
About this file
CDRL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TRNSPDATA_REPORT_DD1653.pdf | ||
| WGD_05-2309.pdf | ||
| PWS_15-00040.pdf | ||
| PKGRQMT_REPORT_DD158.pdf | ||
| QASP.pdf | ||
| FA852215R00040.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of11 7
FD20601500040
A
THE BOEING COMPANY (0PXV4)AN/ALR-56C/TISS
A001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Status Report Monthly Status Report
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-80368A PWS Para. 4.2, 4.4, 4.9 408 SCMS/GUEA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
DD
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
See Blk 16
See Blk 16
MTHLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Blk 16
G. Prepared By: H. Date I. Approved By: J. Date:
408 SCMS/GUEA
235 Byron St.
Ste. 19-A Robins AFB, GA 31098
408 SCMS/GULB
235 Byron St.
Ste. 19-A Robins AFB, GA 31098
AFLCMC/WNWCC
AFLCMC/WNYECB
15. Total: 0 4 0
16. Remarks:
NAME: Privette, Michelle R DATE: 06 NOV 2014
Block 7: DD250 shall be submitted via WAWF with the last submission.
Block 9: Distribution statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology (2 Sep 2014.)
Other requests shall be referred to 408 SCMS/GULB.
Block 11: All status reports shall be submitted no later than the 15th if the month following the month being reported.
Block 12. First submission shall be submitted no later than the 15th of the first full calendar month after contract award.
Block 13: The status report shall have no more than one technical and 5 typographical errors per submission. If an error is found, the contractor has fifteen days to correct and resubmit after receipt of government comments.
Privette, Michelle R
408 SCMS / GULB
478-926-1383
07 NOV 2014 //DIGITALLY SIGNED//
COORDINATORS:
408 SCMS / GULB
MITCHELL.DOUGLAS.E.1229985813
478-926-6558 / 468-6558
06 NOV 2014
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of21 7
A
THE BOEING COMPANY (0PXV4)AN/ALR-56C/TISS
A002
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Technical Report - Study/Services Report of Findings
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MISC-80508B PWS Para. 4.4 408 SCMS/GUEA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
DD
8. APP Code:
A D
11. As of Date: 13. Date of Subsequent Submission:
See Blk 16
See Blk 16
ASREQ
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Blk 16
G. Prepared By: H. Date I. Approved By: J. Date:
408 SCMS/GUEA
235 Byron St.
Ste. 19-A Robins AFB, GA 31098
AFLCMC/WNYECB
15. Total: 0 2 0
16. Remarks:
NAME: Privette, Michelle R DATE: 06 NOV 2014
Block 7: A DD250 shall be submitted via the WAWF with the last submission.
Block 9: Distribution statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology (2 Sep 2014.)
Other requests shall be referred to 408 SCMS/GULB.
Block 8, 10, 11, 12, 13: A report shall be submitted within 10 business days after receipt of a DR. The government shall have 10 business days to provide comments/corrections after receipt. The contractor shall have 10 business days to incorporate changes and resubmit after receipt of government comment/corrections.
Privette, Michelle R
408 SCMS / GULB
478-926-1383
07 NOV 2014 //DIGITALLY SIGNED//
COORDINATORS:
408 SCMS / GULB
MITCHELL.DOUGLAS.E.1229985813
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of31 7
A
THE BOEING COMPANY (0PXV4)AN/ALR-56C/TISS
A003
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Test Plan Test Plan
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-NDTI-80566A PWS Para. 4.5 408 SCMS/GUEA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
DD
8. APP Code:
A D
11. As of Date: 13. Date of Subsequent Submission:
See Blk 16
See Blk 16
ASREQ
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Blk 16
G. Prepared By: H. Date I. Approved By: J. Date:
408 SCMS/GUEA
235 Byron St.
Ste. 19-A Robins AFB, GA 31098
AFLCMC
/WNYECB
15. Total: 0 2 0
16. Remarks:
NAME: Privette, Michelle R DATE: 06 NOV 2014
Block 7: A DD250 shall be submitted via the WAWF with the last submission.
Block 9: Distribution statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology (2 Sep 2014.)
Other requests shall be referred to 408 SCMS/GULB.
Block 8, 10, 11, 12, 13: A test plan shall be submitted within 10 business days after DR resolution has been determined and approved by the government. The government shall have 10 business days to provide comments/corrections after receipt. The contractor shall have 10 business days to incorporate changes and resubmit after receipt of government comment/corrections.
Privette, Michelle R
408 SCMS / GULB
478-926-1383
07 NOV 2014 //DIGITALLY SIGNED//
COORDINATORS:
408 SCMS / GULB
MITCHELL.DOUGLAS.E.1229985813
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of41 7
A
THE BOEING COMPANY (0PXV4)AN/ALR-56C/TISS
A004
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Test Report Test Report
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-NDTI-80809B PWS Para. 4.6 408 SCMS/GUEA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
DD
8. APP Code:
A D
11. As of Date: 13. Date of Subsequent Submission:
See Blk 16
See Blk 16
ASREQ
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Blk 16
G. Prepared By: H. Date I. Approved By: J. Date:
408 SCMS/GUEA
235 Byron St.
Ste. 19-A Robins AFB, GA 31098
AFLCMC/WNYECB
15. Total: 0 2 0
16. Remarks:
NAME: Privette, Michelle R DATE: 06 NOV 2014
Block 7: A DD250 shall be submitted via the WAWF with the last submission.
Block 9: Distribution statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology (2 Sep 2014.)
Other requests shall be referred to 408 SCMS/GULB.
Block 8, 10, 11, 12, 13: A test report shall be submitted within 15 business days after DR resolution selloff. The government shall have 10 business days to provide comments/corrections after receipt.
The contractor shall have 10 business days to incorporate changes and resubmit after receipt of government comment/corrections.
Privette, Michelle R
408 SCMS / GULB
478-926-1383
07 NOV 2014 //DIGITALLY SIGNED//
COORDINATORS:
408 SCMS / GULB
MITCHELL.DOUGLAS.E.1229985813
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of51 7
A
THE BOEING COMPANY (0PXV4)AN/ALR-56C/TISS
A005
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Computer Software Product End Items Computer Software Product End Items
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MCCR-80700 PWS Para. 4.7 408 SCMS/GUEA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
DD
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
See Blk 16
See Blk 16
ASREQ
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Blk 16
G. Prepared By: H. Date I. Approved By: J. Date:
408 SCMS/GUEA
235 Byron St.
Ste. 19-A Robins AFB, GA 31098
AFLCMC/WNYCC
15. Total: 0 2 0
16. Remarks:
NAME: Privette, Michelle R DATE: 06 NOV 2014
Block 4: Para 10.2 - Software will be delivered on media as appropriate per tester requirement.
Block 7: DD250 shall be submitted via WAWF.
Block 9: Distribution statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology (3 Sep 2014.)
Other requests shall be referred to 408 SCMS/GULB.
Block 10, 11, 12, 13: The end item shall be submitted per a mutually agreed upon schedule.
Privette, Michelle R
408 SCMS / GULB
478-926-1383
07 NOV 2014 //DIGITALLY SIGNED//
COORDINATORS:
408 SCMS / GULB
MITCHELL.DOUGLAS.E.1229985813
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of61 7
A
THE BOEING COMPANY (0PXV4)AN/ALR-56C/TISS
A006
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Technical Report - Study/Services TO or ITA HW Change Recommendation
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MISC-80508B PWS Para. 4.7 408 SCMS/GUEA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
DD
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
See Blk 16
See Blk 16
ASREQ
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Blk 16
G. Prepared By: H. Date I. Approved By: J. Date:
408 SCMS/GUEA
235 Byron St.
Ste. 19-A Robins AFB, GA 31098
AFLCMC/WNYCC
15. Total: 0 2 0
16. Remarks:
NAME: Privette, Michelle R DATE: 06 NOV 2014
Block 7: A DD250 shall be submitted via the WAWF.
Block 9: Distribution statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology (3 Sep 2014.)
Other requests shall be referred to 408 SCMS/GULB.
Block 10, 11, 12, 13: The end item shall be submitted per a mutually agreed upon schedule.
Privette, Michelle R
408 SCMS / GULB
478-926-1383
07 NOV 2014 //DIGITALLY SIGNED//
COORDINATORS:
408 SCMS / GULB
MITCHELL.DOUGLAS.E.1229985813
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of71 7
A
THE BOEING COMPANY (0PXV4)AN/ALR-56C/TISS
A007
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Data Accession List Data Accession List
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81453A PWS Para. 4.8 408 SCMS/GUEA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
DD
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
See Blk 16
See Blk 16
ONE/R
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Blk 16
G. Prepared By: H. Date I. Approved By: J. Date:
408 SCMS/GUEA
235 Byron St.
Ste. 19-A Robins AFB, GA 31098
AFLCMC/WNYCC
AFLCMC/WNYECB
15. Total: 0 3 0
16. Remarks:
NAME: Privette, Michelle R DATE: 06 NOV 2014
Block 7: DD250 shall be submitted via WAWF.
Block 9: Distribution statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology (3 Sep 2014.)
Other requests shall be referred to 408 SCMS/GULB.
Block 10, 11, 12, 13: The document shall be submitted 30 days prior to the end of the period of performance.
Privette, Michelle R
408 SCMS / GULB
478-926-1383
07 NOV 2014 //DIGITALLY SIGNED//
COORDINATORS:
408 SCMS / GULB
MITCHELL.DOUGLAS.E.1229985813
File details come from the government source that posted it. Updated .