About this file

RFP Questions Answers 1

View the file

Other files for this federal contract opportunity

Other files attached to Request for Proposal (RFP) - Halvorsen Contractor Logistics Support (CLS) Aquisition, newest first.
File Type Posted
FA8519-13-R-30382-0003.pdf PDF
Atch_23_Halvorsen_Metrics_Determination_and_Incentive_Fee_Arrangement.pdf PDF
Q A_2.pdf PDF
Attachment_25 _Contract_Work_Breakdown_Structure_Matrix.pdf PDF
FA851913R30382______0002.pdf PDF
FA8519-13-R-30382-0001.pdf PDF
HAL_CDRL_X010.pdf PDF
Atch_27_GFE.docx DOCX document
Atch_33_Past_Performance_Questionnaire.docx DOCX document
HAL_CDRL_X014.pdf PDF
Appendix_C.pdf PDF
QASP_PES_PBL.pdf PDF
HAL_OA_PWS.pdf PDF
Appendix_B.doc DOC document
QASP_MM_PBL.pdf PDF
HAL_CDRL_X00C.pdf PDF
Proposal_Adequacy_Checklist.doc DOC document
HAL_CDRL_X001.pdf PDF
TM-86-01N_TMCR.pdf PDF
Atch_31_Partner_Consent.doc DOC document
HAL_CDRL_X006.pdf PDF
HAL_CDRL_X00D.pdf PDF
Atch_30_Client_Authorization_Letter.doc DOC document
HAL_CDRL_X012.pdf PDF
HAL_MM_PWS.pdf PDF
HAL_PES_PWS.pdf PDF
Atch_23_Halvorsen_Metrics_Determination_and_Incentive_Fee_Arrangement.pdf PDF
HAL_CDRL_X003.pdf PDF
FA851913R30382.pdf PDF
Atch_26_Hal_LaborCate_and_Matl_Add-on_r1.xlsx XLSX spreadsheet
Atch_29_-_CHPMSK-30_and_-90_Parts_Kits.xlsx XLSX spreadsheet
HAL_CDRL_X013.pdf PDF
Atch_25_Hal_CWBS_Matrix.pdf PDF
HAL_CDRL_X015.pdf PDF
HAL_OH_PWS.pdf PDF
HAL_CDRL_X007.pdf PDF
HAL_CDRL_X00E.pdf PDF
HAL_CDRL_X009.pdf PDF
Atch_28.docx DOCX document
HAL_CDRL_X00A.pdf PDF
Atch_24_Hal_Cross-Reference_Matrix.xlsx XLSX spreadsheet
QASP_OH_PBL.pdf PDF
AFMC_Form_158.pdf PDF
HAL_CDRL_X00B.pdf PDF
HAL_CDRL_X011.pdf PDF
HAL_CDRL_X005.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER DOCUMENT 1

for Halvorsen 25K Aircraft Cargo Loader CLS Acquisition

FA8519-13-R-30382

The following questions have been received in the AFLCMC/WNKBBA, Support Equipment & Vehicles – Services Contracting Office regarding the above referenced RFP for the Halvorsen 25K Aircraft Cargo Loader CLS requirement.

The questions as well as the applicable answers are provided below for assistance to all potential offerors for the greater understanding of the Government’s requirement.

Question 1:

RFP Reference Question Amendment 0002, Section M.C (iii), page 17 The Government described quantity breaks for “CLIN 0007 and Option CLINS x004.”

This appears to be an error as there is no option to provide quantity breaks for CLIN 0007 in Section B.

Are price breaks to be provided for CLIN 0007?

Government Response:

Amendment 0002, Section M.C (iii), page 17 contains an error.

A correcting amendment to RFP FA8519-13-R-30382 is forthcoming.

Amendment 0002, Section M.C (iii) should read as follows:

“(iii) Total Evaluated Price (TEP):

(a) For Option CLINs x004: Offerors have the option of proposing quantity ranges with economical price breaks.”

There will be no extension associated with this RFP amendment, as this constitutes an administrative correction.

Question 2:

RFP Reference Question HAL MM PWS, Section 2 - Services Summary, Performance Objective - Ensures compliance with Logistics Response Time (LRT) Requirements / Section 4.1.3.1b

The PWS indicates that the “stop time” for calculating material management delivery metrics (NMCS, LRT) is when the part is received “In hands of unit.”

At base locations that do not permit delivery to locations other than a central supply point does the government consider the required acceptance of the delivery at that supply point to be the “stop” time for metrics calculations?

Yes, the Government would consider the central supply point the “stop” time for metrics calculations in these situations.

An amended MM PWS to clarify this issue is forthcoming.

There will be no extension associated with this RFP amendment, as this constitutes an administrative correction.

Question 3:

Amendment 0002, Section L.C.2 – Subfactor 4 – Small Business Utilization Plan, Page 6

Does the Government want only one small business utilization plan from the offeror (prime)?

Does each subcontractor also need to provide their own small business utilization plans?

Per Section L, “Subfactor 4 - Small Business Utilization Plan. The offeror shall submit Small Business Utilization Plan for itself and any joint venture member, as well as each proposed critical subcontractor. The Small Business Utilization Plan is required from all offerors, including small businesses and companies with Master, Individual, commercial subcontracting plans and/or comprehensive subcontracting plans…”

File details come from the government source that posted it. Updated .