Atch_25_Hal_CWBS_Matrix.pdf
PDF 12 KB Posted
- Attached to
- Request for Proposal (RFP) - Halvorsen Contractor Logistics Support (CLS) Aquisition Federal contract opportunity
- Solicitation number
- FA8519-13-R-30382
About this file
Attachment 25 Contract Work Breakdown Structure Matrix
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 25 MATRIX OF CWBS ELEMENTS/ CLINs,/ MTL & LABOR for HALVORSEN Dated: 2 APR 2013
The offeror shall fill out Matrix below by inserting rows and populating with the offeror’s CWBS level 3 elements in column 4. Afterwards, proceed to populate columns 5 thru 7 using the Best Estimated Quantities (BEQ) for the entire 10 year effort. Do not include prices (costs).
1 2 3 4 5 6 7
CLIN CWBS-
LEVEL 1
CWBS- LEVEL 2
CWBS-
LEVEL 3
Labor Category
Prime Contractor and Estimated Subcontractor Labor Hours Total for each Labor Category (exclude manufacturing of new parts)
Narrative Description of How Determined Material Reqts to Accomplish this WBS Element (additional sheets may be attached)
0001, 0004, 0005, 1001, 1002, 2001, 2002, 3001, 3002, 4001, 4002, 5001, 5002, 6001, 6002, 7001, 7002, 8001,
1. MATERIAL
MANAGEMENT
1.1 Parts (price per
operating hour)
See note 1
1.2 Product Support
(infrastructure)
1.3 Program Administration
0001, 0003, 0006, 0009, 1003, 1007, 2003, 2007, 3003, 3007, 4003, 4007, 5003, 5007, 6003, 6007, 7003, 7007, 8003, 8007
2. PROGRAM
ENGINEERING
SUPPORT
2.1 Systems Engineering
2.2 Change Activity
2.3 Data Rights- Reverse
Engr
2.4 Program Administration
0002, 1004, 2004, 3004, 4004, 5004, 6004, 7004, 8004
3. OVERHAUL 3.1 Deck See note 2
3.2 Chassis See note 2
3.3 Cab See note 2
3.4 Integration, Assembly, Test and inspection
See note 2
3.5 Program Administration
Offeror completes columns 4-7 for each level 3 CWBS element for PES, MM, and OH segments.
Note 1: 1.1, the level 3 CWBS shall be segregated into depot level repair parts and expendable parts Note 2: 3.1, 3.2, 3.3 and 3.4, the level 3 CWBS must include total work described in the overhaul manual
File details come from the government source that posted it. Updated .