Attachment_25 _Contract_Work_Breakdown_Structure_Matrix.pdf
PDF 14 KB Posted
- Attached to
- Request for Proposal (RFP) - Halvorsen Contractor Logistics Support (CLS) Aquisition Federal contract opportunity
- Solicitation number
- FA8519-13-R-30382
About this file
Attachment 25 Contract Work Breakdown Structure Matrix
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 25 MATRIX OF CWBS ELEMENTS/ CLINs,/ MTL & LABOR for HALVORSEN Dated: 9 MAY 2013
The offeror shall fill out matrix below by inserting rows and populating with the offeror’s CWBS level 3 elements in column 4. Afterwards, proceed to populate columns 5 thru 7, using the Best Estimated Quantities (BEQ), for the entire 10 year effort. Do not include prices (costs).
1 2 3 4 5 6 7
BEQ CLIN CWBS-
LEVEL 1
CWBS- LEVEL 2
CWBS-
LEVEL 3
Labor Category
Prime Contractor and Estimated Subcontractor Labor Hours Total for each Labor Category (exclude manufacturing of new commercial parts, and overhaul of major commercial components)
Narrative Description of How Determined Material Reqts to Accomplish this WBS Element (additional sheets may be attached)
1, 12, 35,000, 12, 35,000, etc.
0001, 0004, 0005, 1001, 1002, 2001, 2002, 3001, 3002, 4001, 4002, 5001, 5002, 6001, 6002, 7001, 7002, 8001,
1. MATERIAL
MANAGEMENT
1.1 Parts (price per operating
hour)
See note 1
1.2 Product Support
(infrastructure)
1.3 Program Administration
1, 1, 12, 1, 12, 1, etc.
0001, 0003, 0006, 0009, 1003, 1007, 2003, 2007, 3003, 3007, 4003, 4007, 5003, 5007, 6003, 6007, 7003, 7007, 8003, 8007
2. PROGRAM
ENGINEERING
SUPPORT
2.1 Systems Engineering
2.2 Change Activity
2.3 Data Rights- Reverse Engr See note 3
2.4 Program Administration
See note 4 2, 7, 25, 50, etc.
0002, 1004, 2004, 3004, 4004, 5004, 6004, 7004, 8004
3. OVERHAUL 3.1 Deck See note 2
3.2 Chassis See note 2
3.3 Cab See note 2
3.4 Integration, Assembly, Test
and inspection
See note 2
3.5 Program Administration
See additional instructions/notes on the following page.
Instructions Offeror shall complete columns 4-7 for each level 3 CWBS element for PES, MM, and OH segments.
Notes Note 1: 1.1, the level 3 CWBS shall be segregated into depot level repair parts and expendable parts Note 2: 3.1, 3.2, 3.3 and 3.4, the level 3 CWBS must include total work described in the overhaul manual Note 3: Also, indicate as to whether the Halvorsen engineering drawings are provided by the OEM or an output of the reverse engineering effort, or a combination of both.
Note 4: Segregate the labor hours for Overhaul Qualification (CLIN 0002), Low Rate 1 (CLIN 1004), Low Rate 2 (CLIN 2004), and Full Rate (CLINs 3004, 4004, 5004, 6004, 7004, and 8004) efforts.