Attachment_25 _Contract_Work_Breakdown_Structure_Matrix.pdf

PDF 14 KB Posted

Attached to
Request for Proposal (RFP) - Halvorsen Contractor Logistics Support (CLS) Aquisition
Solicitation number
FA8519-13-R-30382
Issued by

About this file

Attachment 25 Contract Work Breakdown Structure Matrix

View the file

Other files

File Type Posted
Atch_23_Halvorsen_Metrics_Determination_and_Incentive_Fee_Arrangement.pdf PDF
FA8519-13-R-30382-0003.pdf PDF
Q A_2.pdf PDF
Q A_1.pdf PDF
FA851913R30382______0002.pdf PDF
FA8519-13-R-30382-0001.pdf PDF
Appendix_C.pdf PDF
QASP_PES_PBL.pdf PDF
HAL_OH_PWS.pdf PDF
HAL_CDRL_X00E.pdf PDF
HAL_CDRL_X007.pdf PDF
HAL_CDRL_X012.pdf PDF
HAL_MM_PWS.pdf PDF
HAL_CDRL_X009.pdf PDF
Atch_28.docx DOCX document
Atch_24_Hal_Cross-Reference_Matrix.xlsx XLSX spreadsheet
QASP_OH_PBL.pdf PDF
HAL_CDRL_X00A.pdf PDF
HAL_OA_PWS.pdf PDF
HAL_CDRL_X00B.pdf PDF
AFMC_Form_158.pdf PDF
HAL_CDRL_X010.pdf PDF
Appendix_B.doc DOC document
QASP_MM_PBL.pdf PDF
Atch_27_GFE.docx DOCX document
Atch_33_Past_Performance_Questionnaire.docx DOCX document
HAL_CDRL_X00C.pdf PDF
Proposal_Adequacy_Checklist.doc DOC document
HAL_CDRL_X014.pdf PDF
HAL_CDRL_X011.pdf PDF
HAL_CDRL_X001.pdf PDF
TM-86-01N_TMCR.pdf PDF
HAL_CDRL_X005.pdf PDF
HAL_CDRL_X006.pdf PDF
HAL_CDRL_X00D.pdf PDF
Atch_30_Client_Authorization_Letter.doc DOC document
Atch_31_Partner_Consent.doc DOC document
FA851913R30382.pdf PDF
HAL_CDRL_X003.pdf PDF
Atch_25_Hal_CWBS_Matrix.pdf PDF
HAL_PES_PWS.pdf PDF
Atch_26_Hal_LaborCate_and_Matl_Add-on_r1.xlsx XLSX spreadsheet
HAL_CDRL_X015.pdf PDF
Atch_29_-_CHPMSK-30_and_-90_Parts_Kits.xlsx XLSX spreadsheet
Atch_23_Halvorsen_Metrics_Determination_and_Incentive_Fee_Arrangement.pdf PDF
HAL_CDRL_X013.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 25 MATRIX OF CWBS ELEMENTS/ CLINs,/ MTL & LABOR for HALVORSEN Dated: 9 MAY 2013

The offeror shall fill out matrix below by inserting rows and populating with the offeror’s CWBS level 3 elements in column 4. Afterwards, proceed to populate columns 5 thru 7, using the Best Estimated Quantities (BEQ), for the entire 10 year effort. Do not include prices (costs).

1 2 3 4 5 6 7

BEQ CLIN CWBS-

LEVEL 1

CWBS- LEVEL 2

CWBS-

LEVEL 3

Labor Category

Prime Contractor and Estimated Subcontractor Labor Hours Total for each Labor Category (exclude manufacturing of new commercial parts, and overhaul of major commercial components)

Narrative Description of How Determined Material Reqts to Accomplish this WBS Element (additional sheets may be attached)

1, 12, 35,000, 12, 35,000, etc.

0001, 0004, 0005, 1001, 1002, 2001, 2002, 3001, 3002, 4001, 4002, 5001, 5002, 6001, 6002, 7001, 7002, 8001,

1. MATERIAL

MANAGEMENT

1.1 Parts (price per operating

hour)

See note 1

1.2 Product Support

(infrastructure)

1.3 Program Administration

1, 1, 12, 1, 12, 1, etc.

0001, 0003, 0006, 0009, 1003, 1007, 2003, 2007, 3003, 3007, 4003, 4007, 5003, 5007, 6003, 6007, 7003, 7007, 8003, 8007

2. PROGRAM

ENGINEERING

SUPPORT

2.1 Systems Engineering

2.2 Change Activity

2.3 Data Rights- Reverse Engr See note 3

2.4 Program Administration

See note 4 2, 7, 25, 50, etc.

0002, 1004, 2004, 3004, 4004, 5004, 6004, 7004, 8004

3. OVERHAUL 3.1 Deck See note 2

3.2 Chassis See note 2

3.3 Cab See note 2

3.4 Integration, Assembly, Test

and inspection

See note 2

3.5 Program Administration

See additional instructions/notes on the following page.

Instructions Offeror shall complete columns 4-7 for each level 3 CWBS element for PES, MM, and OH segments.

Notes Note 1: 1.1, the level 3 CWBS shall be segregated into depot level repair parts and expendable parts Note 2: 3.1, 3.2, 3.3 and 3.4, the level 3 CWBS must include total work described in the overhaul manual Note 3: Also, indicate as to whether the Halvorsen engineering drawings are provided by the OEM or an output of the reverse engineering effort, or a combination of both.

Note 4: Segregate the labor hours for Overhaul Qualification (CLIN 0002), Low Rate 1 (CLIN 1004), Low Rate 2 (CLIN 2004), and Full Rate (CLINs 3004, 4004, 5004, 6004, 7004, and 8004) efforts.

File details come from the government source that posted it. Updated .