This performance work statement outlines repair requirements for axial piston pumps and cooling turbines used on munitions handling trailers and aircraft ground support air conditioners. The contractor will inspect, test, repair, and return the items to a serviceable condition within a four-unit, 60-day turnaround time and meet quality standards of zero deficiencies. Repairs must be completed according to original equipment manufacturer specifications. The contractor will also report repair actions and property transfers using the Commercial Asset Visibility-Air Force system and Item Unique Identification Registry and follow packaging, safety, security, and quality management requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRLs_FD20602000169.pdf | ||
| 2921961_PKGRQMT_REPORT.pdf | ||
| 2921965_TRNSPDATA_REPORT.pdf | ||
| FA851720Q0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement for
Repair of Axial Piston PumpsCooling Turbine
FD2060-20-0016918-00687
Oct 16, 2019May 14, 2019
Distribution Statement D:
Distribution authorized to Department of Defense and U.S. DoD contractors only.
1.0 Description of Services: This Performance Work Statement (PWS) describes the repair requirements for Axial Piston PumpsCooling Turbine, National Stock Number (NSN) 4320-01-216-9809VX4130-01-306-6309RN, Part Number (P/N) 571745-2-160244-40687and NSN 4320-01-174-0506VX, P/N 58313-90004. and 4130-01-483-6711, P/N 571745-4-1. This requirement is for the repair of the Munition Handling Trailers (MHT) MHU-196 and MHU-204. The Axial Piston Pumps are positive displacement pumps which utilizes the reciprocating motion of a multiple number of parallel pistons arranged axially in a cylinder barrel as a means of transferring a liquid from one place to another. The pistons are actuated by revolving the cylinder barrel at an angle to the drive shaft axis or by a tilting box when the cylinder barrel revolves on the drive shaft. The piston displacement may be fixed or variable. It is designed to be driven by a prime mover which is not an integral part of the pump. A/M32C-10D Aircraft Ground Support Air Cycle Air Conditioning (C-10D) The Cooling Turbine is part of the C-10D. This component provides the necessary functions that enable the cooling operation of C-10D to provide conditioned air for cooling or heating compartments for personnel, electrical components, or cargo in aircraft during ground servicing and checkout. The contractor will repair, repair, test, and return each item in a serviceable condition within Turn-Around-Time (TAT). Additionally the contractor will provide quality repair with zero Product Quality Deficiency Reports (PQDR). On time delivery is a pertinent requirement due to critical mission operations.
1.1 Objective(s): The repair is required to provide a serviceable component part that can efficiently serve its intended purpose. The repair will be conducted in accordance with (IAW) applicable Original ComponentEquipment Manufacturer (OECM) standards. Contractor personnel will perform maintenance IAW applicable OEMOCM standards and directives.
1.1.1 Benefits to the United States Air Force (USAF): The repair of this item will benefit the USAF by providing the mandatory repair needed to keep the MHT MHU-196 and MHU-204C-10D in serviceable condition.
1.1.2 Background: The A/M32C-10D Aircraft Ground Support Air Cycle Air Conditioner (C-10D) provides conditioned air for cooling or heating compartments for personnel, electrical components, or cargo in aircraft during ground servicing and checkout. The C-10D is used in conjunction with an A/M32A-60A Aircraft Ground Support Turbine Powered Generator (-60A), to cool specific fighter aircraft avionics systems during ground testing. Bleed air from the -60A turbine compressor, at +300 to +500 degrees Fahrenheit (F.), is supplied to the C-10D, where it is passed through a heat exchanger, and a condenser, and the subject cooling turbine, to produce regulated discharge air temperatures as low as +50 degrees F. The discharge is delivered into the aircraft through a flexible duct. The cooling turbine lowers incoming air temperature via energy removal by shaft work and by expansion to lower pressure. The impeller shaft of the cooling turbine rotates between 20,000 and 30,000 revolutions per minute to perform this function. The cooling turbine is a critical and precision sub-assembly and the primary functional component of the C-10D. Through a series of acquisitions, Honeywell International Inc. now owns all of the designs and manufacturing licenses of Air Research, including the components of this cooling turbine. Honeywell is also in possession of all the fixtures needed to repair the cooling turbine. No other known manufacturer has the current configuration data and equipment necessary to repair the cooling turbine used in the C-10D. The MHT is a heavy-duty, U-type frame vehicle used for transporting munitions. The MHT is equipped to be attached to a tow vehicle having a pintle hook and safety pin, air connections for brakes, and electrical connections for running lights and hydraulic fluid circulation. The MHT requires a 120/ 208-volt, 400-Hertz, 3-phase primary power source that powers all electrical and hydraulic functions. The MHT frame width is adjustable to accept various widths of weapon adapters. Loading and positioning operations are precisely performed with the use of a hand-held Portable Control Unit (PCU). The PCU provides control of 15 operational modes that are used for controlling wheel steering and drive and load positioning. To prevent personnel injury or equipment damage, each mode automatically shuts off when either one of two observers presses a remote stop switch or when the deadman switch is released.
2.0 Services Summary (SS)
| Performance Objective |
| PWS Reference |
| Performance Threshold |
Quality system shall be established and maintained for repair Quality of repair
| 4.8.2 |
| Repaired assets shall repaired IAW OCM specifications with no more than one failure per year. At a minimum, 95% of repaired assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt. |
There shall be no more than one PQDRs and/or QDRs per year.
Assets shall be repaired IAW OEM specifications.
There shall be zero PQDRs and/or QDRs per quarter.
Delivery of repair
| 4.9.1 |
| Delivery of repaired assets shall be four units per 4560 calendar days after receipt of order. |
There shall be zero late delivery (ies) per contract year. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government.
| CAV-AF reporting |
| 4.7 |
| The Contractor shall report production in CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur. |
| Adherence to Contractor Quality Management System (QMS) |
| 5.8 |
| Prior to contract/order award, the Contractor shall submit a QMS, including a QCP, for acceptance by the Government MFT. 100% compliance with the QMS is required. |
3.0 Government Property
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property IAW the Federal Acquisition Regulation (FAR) and as specified in the contract/order.
3.2 Government Property to be Provided: Other than assets for repair, Government property (including material, equipment, information, etc.) is not authorized IAW this PWS. The Contractor shall furnish all material and parts necessary for the performance of these services. The Government will provide contractor/subcontractor personnel access to CAV-AF to perform tasks under the contract/order. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.
3.2.1 Government property will be provided IAW contract attachment, SGFP Data Input Spreadsheet.
3.3 Reporting of Government Property: The Contractor shall create and maintain records of all Government property accountable to the contract/order. The Contractor shall record receipt and return of Government-Furnished Property (GFP) in the Item Unique Identification (IUID) Registry.
3.4 Loss of Government Property
3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.
3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property using Defense Contract Management Agency (DCMA) / Access To eTools.
3.5 Return/Retention Of Government Property All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.
4.0 Technical Requirements: Contractor personnel will inspect, service test, check, and perform maintenance/repair IAW OEMOCM technical manuals and instructions.
4.0.1 Materials: Contractor furnished materials and/or parts used for replacement will equal or exceed the quality of those specified in the OEMOCM manuals. The materials and/or parts will be entirely suitable for restoration of the component part for its intended purposes, and will be completely interchangeable without alteration of Government furnished asset(s). The standard parts approval procedures through Defense Electronic Supply Center (DESC) or the Defense Industrial Supply Center (DISC) will be followed. If a part is disapproved by DESC or DISC, the assigned 410th SCMS/GUEA engineer has approval authority.
4.1 Period and Place of Performance
4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend from FY201 to FY264.
4.1.2 Place of Performance: These services will be performed at Honeywell International Inc. Torrance, CA 90504-6002.Unknown
4.2 Contract Data Requirements List(s) (CDRL)
(CDRL A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAV-AF)/Government Furnished Material Report.
(CDRL A0021, DI-MGMT-81838, Commercial Asset Visibility (CAV) Reporting) (CDRL A0032, DI-PSSS-81995, Contract Depot Maintenance (CDM) Production Report) (CDRL A0043, DI-MGMT-80441C, Government Property Inventory Report) (CDRL A0054, DI-MGMT-81803, Item Unique Identification (IUID) Marking Plan).
(CDRL A005, Data Item Description, DI-QCIC-80125B, GIDEP Alert Report) and Response to an Alert/Safe Alert (CDRL A006, Data Item Description, DI-QCIC-80126B, GIDEP Alert Response) (CDRL A006, DI-MGMT-81804A, Item Unique Identification (IUID) Marking Activity Validation and Verification Report).
(CDRL A007, DI-QCIC-81722, Quality Program Plan)
4.2.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any single deliverable. There shall be no more than one total rejection(s) of deliverables per quarter. The Government will reject a deliverable if any technical errors or one or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within five business days of notification of Government rejection.
4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Procurement Integrated Enterprise Environment (PIEE) / Wide Area WorkFlow (WAWF) and/or submitted directly to the MFT member identified on the CDRL. There shall be no more than one late submission(s) of deliverables per quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
4.3 Repair
4.4 Item Unique Identification: (IUID)
4.4.1 The IUID Program requires each qualifying Air Force (AF) asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The program addresses two categories of assets—those already in the AF inventory and those currently under contract but not currently in the AF inventory. For assets under contract, IUID requirements are specified in Defense Federal Acquisition Regulation Supplement (DFARS) 252-211.7003, Item Identification and Valuation and Department of Defense (DoD) 4100.39-M, Federal Logistics Information System (FLIS). All assets subject to marking must be recorded in the DoD IUID Registry.
4.4.2 Reporting in IUID Registry
4.4.2.1 Transmission of Government property must be recorded in the IUID Registry. The Government is required to record the transfer of GFP to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.
4.4.2.2 The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.
4.4.3 IUID Marking Plan. The Contractor’s IUID Marking Plan will fully detail and document the strategy and scope to be used to meet MIL-STD-130N, DoD Standard Practice Identification Marking of US Military Property. The plan must be approved by 410 SCMS/GUEA engineer (Reference address in Block 14 of CDRL) prior to implementation. (CDRL A0054, DI-MGMT-81803, Item Unique Identification (IUID) Marking Plan).
4.4.4 IUID Marking Activity Validation and Verification Report. The contractor will provide an IUID Marking Activity Validation and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A006, DI-MGMT-81804A, Item Unique Identification (IUID) Marking Activity Validation and Verification Report).
4.5. Packaging:
4.5.1 The Contractor will package and mark end items and components IAW the contract (basic or order, as applicable) Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129R, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL-STD-130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1E, Standard Practice for Military Packaging. The Contractor will ensure that classified material is packaged, marked and delivered IAW Department of Defense (DoD) 5220-22-M, National Industrial Security Program Operating Manual (NISPOM) The Contractor will package and mark material IAW other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.
4.5.2 The Contractor will package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor will package electronic parts susceptible to electrostatic discharge damage IAW MIL-STD-1686C, Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices), and MIL-HDBK-263B, Military Handbook / Electrostatic Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).
4.5.3 IAW MIL-STD-2073-1E, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, will be reclaimed and stored for reutilization. Unsuitable shipping containers will be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.
4.6 Government-Industry Data Exchange Program (GIDEP):
4.6.1 Government-Industry Data Exchange Program (GIDEP): Unless the The Contractor is a member of GIDEP, the following requirements will need to be accomplished is needed. The Contractor shall participate in GIDEP in accordance with Air Force Joint Instruction (AFJI) 63-108, Government-Industry Data Exchange Program (GIDEP), and GIDEP Operations Manual S0300-BT-PRO-010, Government-Industry Data Exchange Program. (CDRL A005, Data Item Description, DI-QCIC-80125B, GIDEP Alert Report) and Response to an Alert/Safe Alert (CDRL A006, Data Item Description, DI-QCIC-80126B, GIDEP Alert Response).
4.7 Providing timely and accurate reporting in CAV-AF
4.7.1 Commercial Asset Visibility-Air Force (CAV-AF). The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur. The following metrics will be monitored: GFM In-Transit, Repairable GFM Accountability and Asset Not on Contract. The Contractor shall obtain a valid DOD PKI certificate to log into CAV-AF. Each user is required to have an IDENTITY Certificate only; an encryption certificate is not required. Data shall be reported as stipulated on the DD1423 and corrective actions shall be taken within seven calendar days of notification of error by the Production Management Specialist - Seller.
(CDRL A001,DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAV-AF)/Government Furnished Material Report.
(CDRL A0012, DI-MGMT-81838, Commercial Asset Visibility (CAV) Reporting) (CDRL A0023, DI-PSSS-81995, Contract Depot Maintenance (CDM) Production Report) (CDRL A0034, DI-MGMT-80441C, Government Property Inventory Report)
4.8 Specific Technical Requirements
4.8.1 The information contained in this section is not intended to be all inclusive or to detract from procedures outlined in the specifications, technical orders, and other directives listed in this work statement, except where specifically noted herein
4.8.2 The Contractor shall repair asset that are equal to, or superior to, OEMOCM components, which meet applicable drawings, handbooks, manuals, and/or specification established by the OEMOCM. Original design of the reparable item and parts thereof, or the design functional capabilities of the item, shall not be changed, modified or altered unless such changes are documented, reported and approved by the Government. The Contractor shall certify that these items are tested and inspected to the OEMOCM standard. There shall be zero PQDRs and/or QDRs per quarter. Quality of repairs would include no more than one Product Quality Deficiency Report (PQDR) per year deemed to be the fault of the contractor following the PQDR investigation.
4.9 Delivering repaired assets on time
4.9.1 The Contractor shall complete production and ship serviceable assets IAW the delivery turnaround time (TAT) established in the contract. The Contractor shall complete production and ship serviceable assets as follows: Delivery of repaired assets shall be four units per 6045 calendars days after receipt of orderrepair delivery order. There shall be zero late delivery (ies) per contract year. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government. The Contractor shall forward any production problems (including delays in delivery) through the Administrative Contracting Officer (ACO) and the AFMC AFSC/PZAAC, Procurement Contracting Officer (PCO), Production Management Specialist Seller, (PMS), 410 SCMS/GULB.
4.9.2 The contractor will not repair any items where the cost of parts exceed(s) 75% of the unit cost; this is considered to be Beyond Economic Repair (BER). Condemnation will be coordinated through the Government Logistics Manager and Contracting Officer on BER form Appendix B. The Contractor will not condemn any end item until approval is received from the Government Logistics Manger and PCO. The Government will coordinate disposition instructions on assets that are determined to be BER. Replacement carcasses will be provided by the Government for those items determined as BER and these replacement will be included in contract repair quantities at no additional cost to the Government. The Contractor has the authority to salvage piece parts from the condemned assets. DoD condemned and scrapped end items will be disposed of through the use of plant clearance procedures and coordinated with the (DCMA) Quality Assurance Representative (QAR). Once determination that the items are BER and to be destroyed, the contractor will demilitarize the item IAW DoD 4160.21-V3, Defense Demilitarization Manual, Demil Code D. This action is to be witnessed and verified by the Company’s Quality Control and the Government QAR assigned to your company. The Government QAR will sign the Government provided BER form for evidence demil has been accomplished. The signed BER form Appendix B will be returned to the Logistics Manager, Production Management Specialist and PCO for file maintenance actions. This will be reported on the contract CAVAF Report as a Scrap in Place and Ship Scrapn asset destroyed in place.
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.
5.2 Security Requirements
5.2.1 Security Regulations: The Contractor shall ensure personnel, information, systems, property and facility security requirements are met.
5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall ensure compliance with DoDD 5205.02E, DoD Directive for Operations Security (OPSEC) and DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual to protect United States (U.S.) Government interests.
5.2.3 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or CUI IAW DoD 5220.22-M, National Industry Security Program. Applicable equipment shall be safeguarded, maintained and operated IAW DoD 5220.22-M.
5.2.4 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements. Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.
5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation.
5.2.6 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.
5.3 Environmental Management System (EMS): These services will not be performed at a Government facility; therefore, the EMS requirement does not apply.
5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.
5.5 Safety Requirements:
5.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoDD 4715.1E, Environmental, Safety, and Occupational Health (ESOH). OSHA and ESOH requirements shall be incorporated into the Contractor’s safety program.
5.5.2 Safety and Health Plan/Program: The Contractor shall submit a Safety and Health Plan to the MFT or as indicated by CDRL instructions. The Contractor shall establish and maintain a safety program in accordance with the contract/order, applicable Government regulations and the Safety and Health Plan.
5.5.3 Mishap Notification/Investigation: IAW AFI 91-204, the Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations. The Contractor shall ensure the Safety Office and the applicable contract management authority are notified of mishaps. The Contractor shall contact the MFT (Contracting Officer’s Representative (COR), if available, or another MFT member) by telephone within four (4) business hours. The MFT will notify the Safety Office and the PCO. The Contractor shall cooperate with Government safety investigations.
5.5.4 Incident/Mishap prices will be separated from other overhaul prices and will be provided to safety investigators and AF Life Cycle Management Center Propulsion Sustainment Division (AFLCMC/LPS).
5.5.5 Voluntary Protection Program (VPP): The USAF is a participant in the OSHA VPP. Additional information regarding VPP is available at the site below. http://www.osha.gov/dcsp/vpp/index.html
5.6 Inspection of Services: IAW the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
5.7 Invoicing/Payment and Receipt/Acceptance: The Contractor will submit/process payment requests and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) / Wide Area Workflow (WAWF).
5.8 Quality Management System (QMS): The Contractor shall ensure the quality of services through a quality and/or inspection system. Prior to contract/order award, the Contractor shall submit a QMS for acceptance by the Government MFT including a Quality Control Plan (QCP) addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. The plan shall include the schedule of quality assurance/control inspections planned by the Contractor. 100% compliance with the QMS is required. (CDRL A007, DI-QCIC-81722, Quality Program Plan)
5.89 Trafficking in Persons: The Contractor shall comply with the requirements of FAR 52.222.50, Combating Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip
PR: FD2060-20-00169
18-00687 PWS REVISION: 0
Distribution Statement: D 14
5.6 Appendices
5.6.1 Appendix A: References
| Publication |
| Title of Publication |
| Date of Publication |
| Section(s) that Apply |
| MIL-STD-129R |
| Military Marking for Shipment and Storage |
18 February 2014 Entire
| MIL-STD-130N |
| DoD Standard Practice Identification Marking of US Military Property |
| 17 Dec 07 |
Change 1 – 16 November 2012 Entire
| MIL-STD-2073-1E |
| Standard Practice for Military Packaging |
23 May 2008 Change 1 - 7 January 2011 Entire
| DoDI 1100.22 |
| Policy and Procedures for Determining Workforce Mix. |
| 12 Apr 10 |
| Entire |
OSHA Public Law 91-596
| Occupational Safety and Health Act (OSHA) of 1970 |
| 1 Jan 04 |
| Entire |
Occupational Safety And Health Standards Occupational Safety and Health Act (OSHA) of 1970
| 1 Jan 04 |
| Part 1910 |
| Safety and Health Regulations for Service Contracts |
| Occupational Safety and Health Act (OSHA) of 1970 |
| 30 Dec 71 |
| Part 1925 |
| DoD 4100.39-M |
| Federal Logistics Information System |
| May 2010 and Change Letter Oct 10 |
| Entire |
| ISO9001:2008 |
| Quality Management Systems - Requirements |
| 15 Nov 2008 |
| Entire |
5.6.2 Appendix B – Beyond Physical Repair (BPR)/Beyond Economical Repair (BER) Template
Appendix B
BER TEMPLATE
CONTRACT NUMBER: CLIN:
TRACKING #:
NSN:
PART NUMBER:
SERIAL NUMBER:
CONTRACT REPAIR UNIT PRICE:
DESCRIPTION:
EST TO REPAIR:
ACTION REQUESTED: SIGNATURES:
CUSTOMER RESPONSE (APPROVE/DISAPPROVE)
DISPOSITION INSTRUCTIONS: (SCRAP, RETURN ETC)
XXXXXX DATE:
CONTRACTS AUTHORIZATION DATE: